Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Interior remodel of toilet room/locker room ![]() ![]() Client: Dematic Corp | Permit type: Building permit - commercial renovation (interior & exterior) | Permit status: Closed-use and occupancy | Expiration date: April 16, 2008 | Permit id: B07-23968 | |||||
SCORE 98 Renovate compressor room Client: Dematic Corporation | Permit type: Building permit - commercial renovation (interior & exterior) | Permit status: Closed-admin | Expiration date: February 13, 2011 | Permit id: B09-01110 | |||||
Renovate compressor room ![]() ![]() Permit status: Closed-admin | Permit id: B09-01110 | |||||
Rmdl int ![]() ![]() Permit status: Closed-finaled | Permit id: Bo1-11068 | |||||
Install two sq. Ft. Illuminated wall signs, one on the north face and the other on the south face per plans. ![]() Permit status: Closed-finaled | Completion date: January 28, 2014 | Permit id: P-Sgn-2011-0597 | |||||
Permit pulled. Kld ![]() Permit status: Closed-repaired | Completion date: September 26, 2011 | Permit id: Sw-Per-2011-011 | |||||
Installation of self-contained air conditioning unit to serve paint line room. Permit status: Closed-approved | Permit id: P-Ad-2015-0019 | |||||
Construction of a 6 wide concrete sidewalk with snowmelt system along the north side of the eixsting employee parking lot. 26 trees will be removed in order to construct the sidewalk. The trees are in poor condition and will be replace at a 1:1 ratio. ![]() Permit status: Monitor | Permit id: L-Dev-2015-0137 | |||||
Remove undersized storm sewer pipe and replace with new larger pipe to eliminate on site flooding. Undersized storm sewer within city right of ways will be submitted to and approved thru the city engineering dept. ![]() Permit status: Closed-finaled | Permit id: L-Stmw-2011-001 | |||||
Interior remodel of toilet room locker room ![]() ![]() Permit status: Closed-use and occupancy | Permit id: B07-23968 | |||||
Add modular walls and install new cabinets ![]() ![]() Permit status: Closed-finaled | Completion date: March 5, 2012 | Permit id: Bc-Int-2011-105 | |||||
Remodel & expand the existing mens restroom. Includes adding in (3) new urinals and (3) new stalls. Includes new ceilings, floor tiles, painting. ![]() ![]() Permit status: Closed-finaled | Completion date: March 10, 2016 | Permit id: Bc-Int-2013-007 | |||||
Remodel existing mens locker room in the main plant. Includes new toilet fixtures, flooring, painting, lights etc. ![]() ![]() Permit status: Closed-finaled | Completion date: December 16, 2013 | Permit id: Bc-Int-2013-113 | |||||
Remodel of interior office space. Scope of work includes demolition of non-load bearing walls, reconstruction of new walls & doors and new interior finishes. ![]() ![]() Permit status: Closed-use and occupancy | Completion date: April 24, 2014 | Permit id: Bc-Int-2013-184 | |||||
New 1 hour fire rated walls to be installed to completely enclose the north & south stairwells. ![]() ![]() Permit status: Closed-finaled | Completion date: October 6, 2014 | Permit id: Bc-Int-2014-119 | |||||
Light demolition, new lighting, hvac, new office furniture, metal stud drywall, paint, carpent. ![]() ![]() Permit status: Closed-finaled | Completion date: January 14, 2016 | Permit id: Bc-Int-2014-204 | |||||
Light demolition, new lighting, hvac, new office furniture, metal stud drywall, paint, carpet. ![]() ![]() Permit status: Closed-finaled | Completion date: June 29, 2015 | Permit id: Bc-Int-2014-235 | |||||
Install canopy awning at walkway ![]() ![]() Permit status: Closed-finaled | Completion date: January 5, 2016 | Permit id: Bc-Reno-2015-11 | |||||
Remove existing roof system down to steel deck, remove asbestos containing materials in accordance with state and local regulations. Provide and anchor 2. 2" iso and install mil rhinobond tpo roof system. See attached scope for details ![]() ![]() Permit status: Closed-no response | Completion date: January 5, 2015 | Permit id: Bc-Rfsd-2014-08 | |||||
Install new automatic vehicular gate, replacing existing manual gate across access drive. Gate automation shall be designed, constructed and installed to comply with the requirements of astm f 2200. Vehicular gate openers shall be listed in accordance with ul 325. ![]() ![]() Permit status: Waiting to inspect | Permit id: Bc-Reno-2016-20 | |||||
Installation of self-contained air conditioning unit to serve paint line room. Permit status: Closed-approved | Permit id: P-Ad-2015-0019 |