Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 76 Wire auto clave Date: December 13, 2010 Contractor: Dillman Electric Incitt Intergrated Structures Permit type: Electrical | Permit status: Pass | Completion date: December 15, 2010 | Current use: Commercial | Permit id: Bld2010-08530 | |||||
SCORE 59 Running power and controls for new duct furnaces being installed. Date: December 10, 2010 Contractor: Sisam Electric, Inc.Cerritos Associates Permit type: Electrical | Permit status: Pass | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2010-08491 | |||||
SCORE 69 Install 6 duct furnaces onto 3 existing evaporative coolers, duct furnaces will be added to evaporative coolers #s 3, 7, & (see permit 100623006 approved plans) g. S. Zone: not hist, m-1-manufacturing building adding coolers. J. U. Date: December 2, 2010 Contractor: Kwn Construction, Lcitt Integrated Structures Permit status: In progress | Completion date: December 2, 2010 | Current use: Commercial | Permit id: Bld2010-08298 | |||||
SCORE 64 Furnace cooling unit installation Date: October 8, 2010 Permit type: Mechanical | Permit status: Pass | Completion date: November 17, 2010 | Current use: Commercial | Permit id: Bld2010-06941 | |||||
SCORE 64 Employee function. Fire dept. Approval reqd. A. H. Date: October 6, 2010 Contractor: Diamond Rentalutah Pipe Trades Local Permit type: Temporary use | Permit status: In progress | Completion date: October 6, 2010 | Permit id: Bld2010-06854 | |||||
SCORE 64 Add on the existing fire sprinkler monitoring syste for elevator recalc tonew mezzanine Date: July 22, 2010 Contractor: Adt Security Services, Incitt Permit type: Low voltage | Permit status: Completed | Completion date: July 30, 2010 | Current use: Commercial | Permit id: Bld2010-05006 | |||||
SCORE 59 Relocate nitrogen equipent, cooling tower, new platform and pipe rack. Expedited plan review. 10 18 20 revised sheets added to plan sets to reflect job changes. G. S. No zoning issues. A. M. Date: July 16, 2010 Contractor: Kwn Construction, Lcitt Intergrated Permit status: Pass | Completion date: February 1, 2011 | Current use: Commercial | Permit id: Bld2010-04860 | |||||
SCORE 69 Interior only, non-bearing removal of masonry & drywall partitions. Remove air handlers & ductwork to be re-installed in new locations under a future permit. Cap off electrical & plumbing & gas piping in selected areas. Remove lighting & ceilings in selected areas. No new work of any kind is under this permit. Cap offs will be done by the subcontractors as who will do the future work. T. B. Zone: m-1 zone - fiberglass product manufacturing facility. K. B. Date: May 14, 2010 Contractor: Kwn Construction, Lcitt Integrated Structures Permit status: Pass | Completion date: November 18, 2010 | Current use: Commercial | Permit id: Bld2010-03131 | |||||
SCORE 59 Replace 7 evaporative coolers with new. New curbs, duct & roof frame. Existing locations. G. S. Zone: m-1 zone, mech equipment replacement, same locations. A. S. Date: June 23, 2010 Contractor: Kwn Construction, Lcitt Integrated Structure Permit status: In progress | Completion date: June 23, 2010 | Current use: Commercial | Permit id: Bld2010-04219 | |||||
SCORE 59 Extend existing wet pipe fire sprinkler system into new autoclave area addition. Date: July 12, 2010 Permit type: Fire | Permit status: Completed | Completion date: August 11, 2010 | Current use: Commercial | Permit id: Bld2010-04673 | |||||
SCORE 59 Extend existing gridded wet pipe fire sprinkler system into new ordinary hazard trim cutting room addition. New area footprint covers approximately 1,2 sq ft. Approximately 16 new sprinklers proposed. Date: August 17, 2010 Permit type: Fire | Permit status: Pass | Completion date: July 26, 2011 | Current use: Commercial | Permit id: Bld2010-05625 | |||||
SCORE 74 Footings and steel work for overhead crane and load bearing footings. Includes electrical. G. S. Zone: a. H. Date: December 7, 2009 Contractor: Neff And Jensen Construction Incitt Corporation Permit status: Pass | Completion date: November 18, 2010 | Current use: Commercial | Permit id: Bld2009-07519 | |||||
SCORE 74 New concrete foundation for nitrogen tank relocation. Fencing not included. Seperate fence permit reqd. M-1 zone fiberglass product manufacturing facility. K. A. Zone, k. B. Fire, t. I. Date: December 15, 2009 Contractor: Neff And Jensen Construction Incitt Corporation Permit status: Pass | Completion date: November 18, 2010 | Current use: Commercial | Permit id: Bld2009-07705 | |||||
Extend existing wet pipe fire sprinkler system to new paint spray booth. Provide separate control valve for isolation and safety interlock. Paint booth separated from sctf unit submitted under permit 2010-05772. Date: August 23, 2010 Permit type: Fire | Permit status: Pass with conditions | Completion date: August 25, 2010 | Current use: Commercial | Permit id: Bld2010-05737 | |||||
Extend existing gridded wet pipe fire sprinkler system into new ordinary hazard trim cutting room addition. New area footprint covers approximately 1,2 sq ft. Approximately 16 new sprinklers proposed. Date: August 17, 2010 Permit type: Fire | Permit status: Pass | Completion date: July 26, 2011 | Current use: Commercial | Permit id: Bld2010-05625 | |||||
Extend existing wet pipe fire sprinkler system into new paint spray booth area (total of 2 new booths). Extra hazard group 2 sprinkler spacing limited to sq. Ft. Per sprinkler. Sprinklers provided in exhaust plenum. Separate control valve for each booth. Calculations provided for large booth to justify pipe sizing shown on plans. Date: August 16, 2010 Permit type: Fire | Permit status: Completed | Completion date: August 25, 2010 | Current use: Commercial | Permit id: Bld2010-05572 | |||||
Extend existing wet pipe fire sprinkler system into new autoclave area addition. Date: July 12, 2010 Permit type: Fire | Permit status: Completed | Completion date: August 11, 2010 | Current use: Commercial | Permit id: Bld2010-04673 | |||||
Extend existing wet pipe fire sprinkler system to area below new mezzanine in production area. Date: July 12, 2010 Permit type: Fire | Permit status: Pass | Completion date: August 31, 2010 | Current use: Commercial | Permit id: Bld2010-04672 | |||||
Elec work for new controlled environmental room and second floor office. Date: June 18, 2010 Permit type: Electrical | Permit status: Pass | Completion date: October 14, 2010 | Current use: Commercial | Permit id: Bld2010-04097 | |||||
SCORE 64 1 furnace under 200,0 btu each, 2 ductwork and misc. Work not classified nor associated with another permit contract value over 1000. 00, 1 exhaust fans, etc. And 2 air conditioners between 5 and 6 hp or tons. Date: July 7, 2010 Permit type: Mechanical | Permit status: Pass | Completion date: October 15, 2010 | Current use: Commercial | Permit id: Bld2010-04580 | |||||
SCORE 77 Changing 9 gas regulators from 1lb gas to 2lb gas. Date: January 19, 2011 Contractor: Ralph Tye And Sons Incitt Intergrated Structures Permit type: Mechanical | Permit status: Pass | Completion date: March 8, 2011 | Current use: Commercial | Permit id: Bld2011-00389 | |||||
SCORE 69 Sump pump plumbing, exhaust fan, lighting, infill conc floor, infill opening with cmu, 8 cmu walls, 26 metal stud walls. G. S. Zone: interior only - no zoning issues. A. M. Date: June 3, 2010 Contractor: Kwn Construction, Lcitt Integrated Structures Permit status: Pass | Completion date: November 18, 2010 | Current use: Commercial | Permit id: Bld2010-03675 | |||||
SCORE 59 Elec work for new controlled environmental room and second floor office. Date: June 18, 2010 Contractor: Sisam Electric, Inc.Itt Intergrated Structures Permit type: Electrical | Permit status: Pass | Completion date: October 14, 2010 | Current use: Commercial | Permit id: Bld2010-04097 | |||||
SCORE 74 Elec work for new mezzanine Date: July 26, 2010 Contractor: Salmon Electrical Contractors Incitt Permit type: Electrical | Permit status: Pass | Completion date: August 31, 2010 | Current use: Commercial | Permit id: Bld2010-05039 | |||||
SCORE 64 Fire alarm Date: October 8, 2014 Contractor: Fire Engineering Company Incexelis Bily Mitchell Permit type: Low voltage | Permit status: Pass | Completion date: January 16, 2015 | Current use: Commercial | Permit id: Bld2014-07341 | |||||
SCORE 59 Extend existing wet pipe fire sprinkler system to new paint spray booth. Provide separate control valve for isolation and safety interlock. Paint booth separated from sctf unit submitted under permit 2010-05772. Date: August 23, 2010 Permit type: Fire | Permit status: Completed | Completion date: August 25, 2010 | Current use: Commercial | Permit id: Bld2010-05737 | |||||
SCORE 64 Electrical work for t. I. Date: May 24, 2010 Contractor: Sisam Electric Incitt Integrated Structures Permit type: Electrical | Permit status: Pass | Completion date: February 21, 2013 | Current use: Commercial | Permit id: Bld2010-03410 | |||||
SCORE 59 Install 3 ea paint booths inside itt main bldg. Fire sprinkler by delta fire. Not part of this permit. Manufacturers installation information attached to plans. Make up air systems by separate permit. G. S. Zone: a. M. Date: June 15, 2010 Contractor: Kwn Construction, Lcitt Permit status: In progress | Completion date: June 15, 2010 | Current use: Commercial | Permit id: Bld2010-03984 | |||||
SCORE 72 New trim cutting room. Expedited plan review with air condition, lights, outlets, storage, mezz - light. G. S. Zone: interior only - no zoning issues. A. M. Date: August 2, 2010 Contractor: Kwn Construction, Lcitt Intergrated Structures Permit status: Pass | Completion date: November 18, 2010 | Current use: Commercial | Permit id: Bld2010-05197 | |||||
SCORE 59 New mezzanine, expidited. D. D. Zone: a. M. Date: June 8, 2010 Contractor: Tom Stuart Construction, Inc.Itt Permit status: Certificate of completion | Completion date: September 29, 2010 | Current use: Commercial | Permit id: Bld2010-03795 | |||||
SCORE 72 New controlled environmental room and second floor office. Construct (1) wood frame 2 story controlled environment" room inside the existing. M-1 zone, add 2nd level w i existing structure. Tmb ah Date: December 30, 2009 Contractor: Kwn Construction, Lcitt Intergrated Structures Permit status: Pass | Completion date: November 18, 2010 | Current use: Commercial | Permit id: Bld2009-07998 | |||||
SCORE 64 Ductwork and misc work not classified nor associated with another permit up to 1000. And evap cooler over 65 cfm (7). Date: July 7, 2010 Permit type: Mechanical | Permit status: On-line ready | Completion date: July 7, 2010 | Current use: Commercial | Permit id: Bld2010-04575 | |||||
SCORE 59 Fire sprinkler system. Date: December 29, 2009 Permit type: Fire | Permit status: Pass | Completion date: October 15, 2010 | Current use: Commercial | Permit id: Bld2009-07966 | |||||
SCORE 76 Electrical Date: September 30, 2010 Contractor: Dillman Electric Incitt Intergrated Structures Permit status: Pass | Completion date: November 17, 2010 | Current use: Commercial | Permit id: Bld2010-06720 | |||||
SCORE 59 Extend existing wet pipe fire sprinkler system to area below new mezzanine in production area. Date: July 12, 2010 Contractor: Delta Fire Systems, Inc.Itt Mezzanine Addition Permit type: Fire | Permit status: Pass | Completion date: August 31, 2010 | Current use: Commercial | Permit id: Bld2010-04672 | |||||
SCORE 64 Low voltage fire alarm, connection to paint booth. Date: October 19, 2010 Contractor: Adt Security Services, Incitt Permit type: Low voltage | Permit status: Completed | Completion date: October 26, 2010 | Current use: Commercial | Permit id: Bld2010-07185 | |||||
SCORE 77 Install 2 sump pumps andassoc piping Date: October 13, 2010 Contractor: Ralph Tye And Sons Incitt Intergrated Structures Permit type: Plumbing | Permit status: Pass | Completion date: December 8, 2010 | Current use: Commercial | Permit id: Bld2010-07082 | |||||
SCORE 59 Extend existing wet pipe fire sprinkler system into new paint spray booth area (total of 2 new booths). Extra hazard group 2 sprinkler spacing limited to sq. Ft. Per sprinkler. Sprinklers provided in exhaust plenum. Separate control valve for each booth. Calculations provided for large booth to justify pipe sizing shown on plans. Date: August 16, 2010 Contractor: Delta Fire Systems, Inc.Itt Paint Spray Booth Permit type: Fire | Permit status: Completed | Completion date: August 25, 2010 | Current use: Commercial | Permit id: Bld2010-05572 | |||||
SCORE 74 Relocate existing eqpmnt & wire new eqpmnt Date: July 28, 2010 Contractor: Salmon Electrical Contractors Incitt Permit type: Electrical | Permit status: Pass | Completion date: March 26, 2013 | Current use: Commercial | Permit id: Bld2010-05106 | |||||
SCORE 72 New metal building. Expedited review footing, foundation, floor slab, metal building, power, hvac, fire sprinkler sys. G. S. Zone: a. M. Date: August 10, 2010 Contractor: Kwn Construction, Lcitt Intergrated Structures Permit status: Pass | Completion date: December 17, 2010 | Current use: Commercial | Permit id: Bld2010-05415 | |||||
SCORE 59 Dry chemical suppression system for small paint booth. Date: September 24, 2010 Permit type: Fire | Permit status: Completed | Completion date: September 29, 2010 | Current use: Commercial | Permit id: Bld2010-06593 | |||||
SCORE 64 Wall sign permit Date: August 5, 2016 Contractor: Yesco Llcalbany Eng. Com Permit type: Sign | Permit status: Inspections | Completion date: August 5, 2016 | Permit id: Bld2016-07345 | |||||
SCORE 56 Interior remodel. Mech, electrical permits reqd. Date: November 1, 2016 Contractor: Souvall Brothers Incalbany Permit status: Inspections | Completion date: November 1, 2016 | Current use: Commercial | Permit id: Bld2016-10200 | |||||
SCORE 56 Albany general contractors permit # is bld2016-10200 Date: November 17, 2016 Permit type: Electrical | Permit status: Inspections | Completion date: November 18, 2016 | Current use: Commercial | Permit id: Bld2016-10672 |