Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Excavation; sewer lateral connection to 4" (trench), excavation; sewer service lateral abandonment, excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe), excavation; water service lateral abandonment (trench), excavation; clean out (sewer) Contractor: Mohammad Esfahani Permit status: 12 | Expiration date: August 24, 2017 | Permit id: 0 | |||||
SCORE 98 Contractor will excavate to install 1-2" copper domestic water service, 1-2" copper fire service, 1-2" water meter and pit and 1-4" pvc sanitary service. Also their will be abandonments of existing sewer service, water service and meter pit. Date: May 16, 2017 Contractor: Mohammad Esfahani Permit type: Excavation; sewer lateral connection to 4" | Permit status: Assigned | Expiration date: August 24, 2017 | Permit id: 0 | |||||
SCORE 100 Construction staging area Date: February 26, 2016 Contractor: Joseph Stewart Permit status: Expired | Expiration date: April 30, 2016 | Permit id: Pa10217548-R2 | |||||
SCORE 98 Contractor will excavate to install 1-2" copper domestic water service, 1-2" copper fire service, 1-2" water meter and pit and 1-4" pvc sanitary service. Also their will be abandonments of existing sewer service, water service and meter pit. Contractor: Mohammad Esfahani Permit status: Assigned | Expiration date: June 30, 2017 | Permit id: 0 | |||||
SCORE 98 Contractor will excavate to install 1-2" copper domestic water service, 1-2" copper fire service, 1-2" water meter and pit and 1-4" pvc sanitary service. Also their will be abandonments of existing sewer service, water service and meter pit. Date: May 16, 2017 Contractor: Mohammad Esfahani Permit type: Excavation; sewer lateral connection to 4" | Permit status: Permit expired | Expiration date: August 24, 2017 | Permit id: Pa205403 | |||||
SCORE 56 According to ddot tsa tcp safty guidelines above address only this permit include placing ladder / scafold and cherry picker as needed tcp for temp. Sidewalk closier must be in place as needed. Separate bldg. Permit may be required. Refer to dcra blra . Date: September 20, 2006 Contractor: Sing Yat Family Trust Permit type: Occupancy; staging area(s), occupancy; hoist/scaffold(s), occupancy; erect on sidewalk ,above address | Permit status: Permit expired | Expiration date: February 1, 2007 | Permit id: Pa22482 | |||||
SCORE 100 Construction staging area Contractor: Joseph Stewart Permit status: Notpaid | Expiration date: September 8, 2017 | Permit id: 0 | |||||
SCORE 98 Excavation; sewer lateral connection to 4" (trench), excavation; sewer service lateral abandonment, excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe), excavation; water service lateral abandonment (trench), excavation; clean out (sewer) Date: June 27, 2017 Contractor: Mohammad Esfahani Permit status: Permit expired | Expiration date: August 24, 2017 | Permit id: Pa205403 | |||||
SCORE 98 Roll off debris container Date: July 21, 2015 Contractor: Mohammad Esfahani Permit status: Permit expired | Expiration date: August 18, 2015 | Permit id: Pa10200398 | |||||
SCORE 100 Construction staging area Date: November 5, 2015 Contractor: Joseph Stewart Permit status: Permit expired | Expiration date: December 28, 2015 | Permit id: Pa10217548 | |||||
SCORE 100 Construction staging area Date: January 4, 2016 Contractor: Joseph Stewart Permit status: Permit expired | Expiration date: February 19, 2016 | Permit id: Pa10217548-R1 | |||||
SCORE 100 Construction staging area Date: September 15, 2017 Contractor: Joseph Stewart Permit status: Permit expired | Expiration date: September 23, 2017 | Permit id: Pa10464171 | |||||
SCORE 100 Construction staging area Contractor: Joseph Stewart Permit status: Not paid | Expiration date: September 8, 2017 | Permit id: 0 |