Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Revision to permit# b1706866, full bath room and mechnanical room and wetbar were relocated at the basement dishwasher relocated at the first floor hvac unit relocated. Add a front door to access to balcony at the second floor. Date: May 31, 2017 Contractor: Muhittin Aydeniz Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1708950 | |||||
SCORE 56 Rear exterior brick wall to removed and replaced. In basement: half bath converted to full bath. Add bedroom and wet bar. First floor, kitchen location relocated and hald bath added. Second floor some interior framing relocated and bathrooms will be renovated. Electrical panel upgraded. New mechanical system Date: April 14, 2017 Contractor: Mehmet Ogden; Muhittin Aydeniz Client: E Mackey | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1706866 | |||||
SCORE 56 Building Date: March 26, 2017 Contractor: Mehmet Ogden Permit status: Permit issued | Permit id: Bp1702333 | |||||
SCORE 82 Electrical Date: April 25, 2017 Contractor: Ralph E. Threatt Client: E Mackey | Permit status: Permit issued | Permit id: E1705690 | |||||
SCORE 100 Plumbing and gas Date: April 25, 2017 Contractor: Jerone Scott Client: E Mackey | Permit status: Permit issued | Permit id: P1705270 | |||||
SCORE 80 Mechanical Date: April 25, 2017 Contractor: Brandon K. Viernes Client: E Mackey | Permit status: Permit issued | Permit id: M1701996 |