Building Permits at 5 Spur Dr, Asheville, NC 28704


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 5 Spur Dr, Asheville, NC 28704 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Wellington mhp
Date:  October 18, 2011

Permit status: Closed | Permit id: 11-05690
2011/10/180955 Spur Dr, Asheville, Nc 28704
SCORE
100
Wellington mhp
Date:  October 18, 2011
Value:   $7,000

Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-05690 | Parcel: 95782
2011/10/1870001005 Spur Dr, Asheville, Nc 28704Upgrade Electric Inc
SCORE
100
Wellington mhp
Date:  October 18, 2011
Value:   $7,000

Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-05690 | Parcel: 95782
2011/10/1870001005 Spur Dr, Asheville, Nc 28704Bartlett Brothers Plumbing Con
SCORE
100
Wellington mhp
Date:  October 18, 2011
Value:   $7,000

Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-05690 | Parcel: 95782
2011/10/1870001005 Spur Dr, Asheville, Nc 28704R And D Modular And Mobile Const
October 3, 2011 12:44:47 pm kneel. Permit on hold for site plan. October 3, 2011 4:03:53 pm kneel. Received site plan. October 3, 2011 12:41:19 pm kneel. Wellington mhp - used mh to lot location: airport rd to wellington mhp; october 18, 2011 9:23:54 am kneel. Wellington mhp - used mh to lot; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square f

Permit type: Permits - historical | Permit status: Closed | Permit id: 11-05690 | Parcel: 95782
0955 Spur Dr, Asheville, Nc 28704
Wellington mhp
Date:  October 18, 2011
Value:   $7,000

Permit type: Historical | Permit status: Closed | Permit id: 11-05690
2011/10/187000955 Spur Dr, Asheville, Nc 28704
SCORE
100
Wellington mhp
Date:  October 18, 2011
Value:   $7,000

Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-05690 | Parcel: 95782
2011/10/1870001005 Spur Dr, Asheville, Nc 28704R And D Modular And Mobile Const
October 3, 2011 12:44:47 pm kneel. Permit on hold for site plan. October 3, 2011 4:03:53 pm kneel. Received site plan. October 3, 2011 12:41:19 pm kneel. Wellington mhp - used mh to lot location: airport rd to wellington mhp; october 18, 2011 9:23:54 am kneel. Wellington mhp - used mh to lot; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square f
Date:  October 18, 2011

Permit type: Permits - historical | Permit status: Closed | Permit id: 11-05690 | Parcel: 95782
2011/10/180955 Spur Dr, Asheville, Nc 28704
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.