Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: November 3, 2014 Client: Interim House Inc | Permit status: Completed | Permit id: 561519 | |||||
Electrical permit Date: October 25, 2013 Client: Interim House Inc | Permit status: Completed | Permit id: 502522 | |||||
Zoning/use permit Date: July 7, 2009 Client: Interim House Inc | Permit status: Completed | Permit id: 202060 | |||||
Administrative permit Date: February 26, 2015 Client: Interim House Inc | Permit status: Completed | Permit id: 586179 | |||||
Operations permit Date: October 4, 2011 Client: Interim House Inc | Permit status: Completed | Permit id: 21188 | |||||
Addition permit Date: January 29, 2010 Client: Interim House Inc | Permit status: Completed | Permit id: 202063 | |||||
Zoning/use permit Date: November 3, 2014 Client: Interim House Inc | Permit status: Completed | Permit id: 571037 | |||||
Electrical permit Date: March 3, 2010 Client: Interim House Inc | Permit status: Completed | Permit id: 264718 | |||||
Suppression permit Date: September 20, 2013 Client: Interim House Inc | Permit status: Completed | Permit id: 485873 | |||||
Permit for erection of enclosure to existing covered porch for use as an extension to an existing residential treatment facility ( private rehabilitation/correctional facility) for (25) occupants all capable of self preservation and self sustaining under the jurisdiction of the courts with uses as previously approved and accessory parking. Date: April 23, 2009 Client: Interim House Inc | Applicant: Kevin Blanton, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: July 15, 2009 | Permit id: 8859 | |||||
Zoning use permit Date: July 7, 2009 Client: Interim House Inc | Permit status: Completed | Permit id: 202060 | |||||
Administrative permit Date: February 26, 2015 Client: Interim House Inc | Permit status: Completed | Permit id: 586179 | |||||
Zoning use permit Date: November 3, 2014 Client: Interim House Inc | Permit status: Completed | Permit id: 571037 | |||||
Suppression permit Date: September 20, 2013 Client: Interim House Inc | Permit status: Completed | Permit id: 485873 | |||||
Electrical permit Date: October 25, 2013 Client: Interim House Inc | Permit status: Completed | Permit id: 502522 | |||||
Electrical permit Date: March 3, 2010 Client: Interim House Inc | Permit status: Completed | Permit id: 264718 | |||||
Operations permit Date: October 4, 2011 Client: Interim House Inc | Permit status: Completed | Permit id: 21188 | |||||
Alteration permit Date: November 3, 2014 Client: Interim House Inc | Permit status: Completed | Permit id: 561519 | |||||
Addition permit Date: January 29, 2010 Client: Interim House Inc | Permit status: Completed | Permit id: 202063 | |||||
Permit for erection of enclosure to existing covered porch for use as an extension to an existing residential treatment facility ( private rehabilitation correctional facility) for (25) occupants all capable of self preservation and self sustaining under the jurisdiction of the courts with uses as previously approved and accessory parking. Date: April 23, 2009 Client: Interim House Inc | Applicant: Kevin Blanton, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: July 15, 2009 | Permit id: 8859 | |||||
SCORE 98 For the ammendment of previously approved permit#580695 to include alterations to foundation work as shown per approved plans. Previous permit issued for for the replacement of exterior brick patio with a wooden deck as shown per approved plans. All foundation work and connection details to be done in accordance with details sealed by engineer. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Please reference ap#561519 and ap#580695 for all other documentation. Date: February 26, 2015 Contractor: Patriot Construction Inc Client: Nterim House Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: March 23, 2015 | Permit id: 586179 | |||||
SCORE 98 For the removal of existing deck and for the erection of a deck on the first floor level. Size and location as shown per application plans. Structure accessory to previously approved use of a re-entry facility. Date: November 3, 2014 Contractor: Patriot Construction Inc Client: Nterim House Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 3, 2014 | Permit id: 571037 | |||||
SCORE 98 For the ammendment of previously approved permit#561519 to include alterations to foundation work as shown per approved plans. Previous permit issued for for the replacement of exterior brick patio with a wooden deck as shown per approved plans. All foundation work and connection details to be done in accordance with details sealed by engineer. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Please reference ap#561519 for all other documentation Date: January 22, 2015 Contractor: Patriot Construction Inc Client: Nterim House Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: June 15, 2015 | Permit id: 580695 | |||||
SCORE 81 Enclose a portion of covered porch to create sunroom for existing residential treatment facility Date: July 7, 2009 Contractor: R P Getts Builders Inc Client: Nterim House Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 8, 2009 | Permit id: 202060 | |||||
SCORE 81 Enclose portion of existing covered porch install 4 windows and 2 ext doors drywall no structural work for residential treatment facility as per plans Date: January 29, 2010 Contractor: R P Getts Builders Inc Client: Nterim House Inc | Permit type: Addition permit | Permit status: Completed | Completion date: August 3, 2013 | Permit id: 202063 | |||||
SCORE 100 10 12 2011erection of one (1) assembly use tent for interim house 40th anniversary Date: October 4, 2011 Contractor: Knight Enterprises Inc Client: Nterim House Inc | Permit type: Operations permit | Permit status: Completed | Permit id: 21188 | |||||
SCORE 100 Install 5 receptacles, 2 switches & 4 light fixtures. Date: March 3, 2010 Contractor: Jonathan K Waring Do Not Use Client: Nterim House Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: July 5, 2011 | Permit id: 264718 | |||||
SCORE 100 New installation of nfpa 13 system , 4 " service, fire sprinkler system throughout building, as per plans and calcs. Certificate of occupancy check required for past use - occupancy classification change. Date: September 20, 2013 Contractor: Independence Fire Sprinkler Co Client: Nterim House Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 485873 | |||||
SCORE 100 Connected a water flow valve & 2-tamper switches to existing fire alarm sprinkler as per nec 2008 (boarding house) Date: October 25, 2013 Contractor: Fidelity Burglar And Fire Alarm Client: Nterim House Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: May 1, 2014 | Permit id: 502522 | |||||
SCORE 98 For the replacement of exterior brick patio with a wooden deck as shown per approved plans. All foundation work and connection details to be done in accordance with details sealed by engineer. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: November 3, 2014 Contractor: Patriot Construction Inc Client: Nterim House Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: February 19, 2015 | Permit id: 561519 |