Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 75 Renovate fort totten elevator bo6x01 in accordance with the enclosed scope. Est. Cost of work : 260,000. 00 Date: December 31, 2015 Contractor: Midamerican Elevator Company Client: Washington Metropolitan Area Transit Authority (wmata) | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1502889 | |||||
SCORE 56 Wmata proposes to drill one geotechnical boring b-2 located in the vicinity of 5 galloway street ne, between hamilton street and 3rd street ne. The boring will be 8 inches in diameter and feet deep. The drilling method used will be hollow stem auger. All drilling generated waste will be drummed -solids and liquids-, tested and shipped off-site for disposal. In the event that the well is not completed within 1 day, the well shall be covered and protected from surface water damage, vertical migration of contaminants and other materials through the well casing and well annulus. The boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. Date: November 16, 2016 Client: Washington Metropolitan Area Transit Authority | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700036 |