Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: February 25, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 592330 | |||||
Zoning/use permit Date: March 13, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 568398 | |||||
Plumbing permit Date: September 29, 2014 Client: Levine Fred R | Permit status: Completed | Permit id: 564583 | |||||
Electrical permit Date: April 23, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 605007 | |||||
Plumbing permit Date: April 17, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 603731 | |||||
Demolition permit Date: June 25, 2014 Client: Levine Fred R | Permit status: Completed | Permit id: 545541 | |||||
Mechanical permit Date: September 4, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 636831 | |||||
Permit for the legalization of three (3) interior, off-street parking spaces accessory to an existing three-family dwelling. Size and location as shown in the application/plans. Date: January 9, 2015 Client: Levine Fred R | Applicant: Fred Levine | Permit type: Appeal | Permit status: Granted | Completion date: March 13, 2015 | Permit id: 24387 | |||||
Electrical permit Date: August 24, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 609708 | |||||
Zoning use permit Date: March 13, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 568398 | |||||
Mechanical permit Date: September 4, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 636831 | |||||
Alteration permit Date: February 25, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 592330 | |||||
Plumbing permit Date: April 17, 2015 Client: Levine Fred R | Permit status: Completed | Permit id: 603731 | |||||
Plumbing permit Date: September 29, 2014 Client: Levine Fred R | Permit status: Completed | Permit id: 564583 | |||||
Demolition permit Date: June 25, 2014 Client: Levine Fred R | Permit status: Completed | Permit id: 545541 | |||||
Permit for the legalization of three (3) interior, off-street parking spaces accessory to an existing three-family dwelling. Size and location as shown in the application plans. Date: January 9, 2015 Client: Levine Fred R | Applicant: Fred Levine | Permit type: Appeal | Permit status: Granted | Completion date: March 13, 2015 | Permit id: 24387 | |||||
SCORE 100 Interior alterations and co for an existing 3-family dwelling (no change in occupancy classification). Date: April 1, 2015 Contractor: Marinucci Roofing And Gen Contra Client: Levine Fred R | Permit type: Alteration permit | Permit status: Completed | Completion date: November 9, 2015 | Permit id: 597508 | |||||
SCORE 100 Existing 3 family with accessory 3-car inside parking, building is existing, no new additions. Existing building includes 3-car garage and also balconies at first floor front and third floor rear that are open to the sky. Please see attached plans. Date: March 13, 2015 Contractor: Marinucci Roofing And Gen Contra Client: Levine Fred R | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 13, 2015 | Permit id: 568398 | |||||
SCORE 100 Re-roof torch down rubber roof 8 sq ft. Remove replace 1 sq. Ft. Siding to front of house. Date: February 25, 2015 Contractor: Marinucci Roofing And Gen Contra Client: Levine Fred R | Permit type: Alteration permit | Permit status: Completed | Completion date: April 30, 2015 | Permit id: 592330 | |||||
SCORE 96 The first floor has a 90k gas heater w a 3 ton condenser, the 2nd & 3rd floors both have an 80k gas heater w 2 1 2 ton condensers each.(all units & ductwork self contained within individual tenant space. No penetrations through rated assemblies) Date: September 4, 2015 Contractor: Tts Inc Client: Levine Fred R | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 9, 2015 | Permit id: 636831 | |||||
SCORE 100 Install 3-toilet, 3-lav, 3-tub, 3-kit sink 3-washer & 3-water heater (sfd) the installation will comply with the philadelphia plumbing code 2004 (north district) Date: April 17, 2015 Contractor: Ferko Plumbing Client: Levine Fred R | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 9, 2015 | Permit id: 603731 | |||||
SCORE 100 Interior demo on non-load bearing walls throughout (sfd) Date: June 25, 2014 Contractor: Marinucci Roofing And Gen Contra Client: Levine Fred R | Permit type: Demolition permit | Permit status: Completed | Completion date: March 4, 2015 | Permit id: 545541 | |||||
SCORE 100 1" water distribution line replacement - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: September 29, 2014 Contractor: Ferko Plumbing Client: Levine Fred R | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 30, 2015 | Permit id: 564583 | |||||
SCORE 99 Installing automatic fire alarm system as per code pull station horns smoke detectors thru-out building basement first floor 2nd floor and 3rd floor Date: August 24, 2015 Contractor: Gateway Electrical Contractors Client: Levine Fred R | Permit type: Electrical permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 609708 | |||||
SCORE 99 Replace 200a service with 300a service, 36 space panel, 4 meters; install 29 switches, 32 light, 47- receptacles.... In accordance with 2008 nec Date: April 23, 2015 Contractor: Gateway Electrical Contractors Client: Levine Fred R | Permit type: Electrical permit | Permit status: Completed | Completion date: November 9, 2015 | Permit id: 605007 |