Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 72 97 rooms all suite hotel by hilton Date: February 11, 2016 Contractor: Ace Design And Construction Inc Permit status: Inspections | Permit id: Bld2015-03626 | |||||
Administrative interpretation for freeway landscape requirement Date: August 14, 2015 Permit type: Zoning administration | Permit status: Active | Permit id: Plnzad2015-0065 | |||||
SCORE 72 Interior pool & spa. M. E. P reqd. Date: May 23, 2016 Contractor: Ace Design And Construction Inc Permit status: Inspections | Permit id: Bld2016-04921 | |||||
SCORE 99 1 underground fire line and 3 hydrants Date: February 16, 2016 Contractor: Eugene Morgan And Son Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-01267 | |||||
SCORE 99 1 bathtubs, 2 commercial washer, drinking fountain, 7 floor drains, sinks, 2 floor sinks, mop/service sink, 2 urinals, 112 wash basins, 1 water closets 1. 6, 4 water heater, water piping, 16 roof drains, interceptor, sump pump, gas piping, water softener. Date: November 18, 2015 Contractor: Munson Mechanical Inc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2015-10008 |