Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Temporary placement of (1) dumpster for removal of debris from renovation work Date: March 24, 2010 Permit status: Na | Permit id: Td18692 | Parcel: 0201175000 | |||||
Renovation work to include removal of all plaster windows;and ceilings and replace with new installation (secure any floor openings) Date: March 24, 2010 Permit status: Na | Permit id: Fdc18696 | Parcel: 0201175000 | |||||
SCORE 64 Plumbing permit Client: Forty 9 Baldwin St Condo Tr | Permit type: Plumbing | Permit status: Expired | Current use: 1-2fam | Permit id: Pl29744 | Parcel: 0201175000 | |||||
SCORE 64 Confirm occupancy for a two family dwelling ( existing condition ).; move one bedroom from first floor to basement. Add second bedroom and full bathroom to basement.;install new electrical plumbing and heating to code make structural repairs to interior supporting wall according to plans done by jkp; structural engineering and construct a roof top deck over 2nd floor roof off 3rd floor in back of house Client: Forty 9 Baldwin St Condo Tr | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Alt28071 | Parcel: 0201175000 | |||||
SCORE 87 Rewire 2 family building to code including new 200 amp service with 2 - 100 amp panels and 1 - 60 amp public panel. 1st floor unit to consist of 2 bedroom 1. 5 bath and 2nd floor unit to consist of 3 bedroom 3 bathroom Client: Forty 9 Baldwin St Condo Tr | Permit type: Service change | Permit status: Expired | Current use: 1-2fam | Permit id: E19705 | Parcel: 0201175000 | |||||
SCORE 59 Remove all plaster from walls and ceilings in units 1 and 2. Install new electric plumbing and heating in unit 2. Install new french drain in basement and pour new concrete basement floor. Replace all old vinyl windows in units one and 2 with new vinyl windows. Install new blueboard and plaster in unit 2. Install new kitchen cabinets in unit 2 and remodel 3 bathrooms in unit 2. Client: Forty 9 Baldwin St Condo Tr | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Sf18146 | Parcel: 0201175000 | |||||
SCORE 64 Running new gas Client: Forty 9 Baldwin St Condo Tr | Permit type: Gas | Permit status: Expired | Current use: 1-2fam | Permit id: G29745 | Parcel: 0201175000 | |||||
SCORE 64 (2) family dwelling alt28071 issued 2 18 11 sf 18146 issued 3 18 10 ; Date: August 3, 2011 Contractor: Guy Assetta Client: Forty 9 Baldwin St Condo Tr | Permit status: Expired | Current use: 1-2fam | Permit id: Coo88735 | Parcel: 0201175000 | |||||
Temporary placement of (1) dumpster for removal of debris from renovation work Date: March 24, 2010 Client: Duffy Frederick G | Permit type: Bfd temporary dumpster | Permit id: Td18692 | Parcel: 0201175000 | |||||
SCORE 64 Confirm occupancy for a two family dwelling ( existing condition ).; move one bedroom from first floor to basement. Add second bedroom and full bathroom to basement.;install new electrical plumbing and heating to code make structural repairs to interior supporting wall according to plans done by jkp; structural engineering and construct a roof top deck over 2nd floor roof off 3rd floor in back of house Client: Duffy Frederick G | Permit type: Long form/alteration permit | Expiration date: August 18, 2011 | Current use: 1-2fam | Permit id: Alt28071 | Parcel: 0201175000 | |||||
SCORE 87 Rewire 2 family building to code including new 2 amp service with 2 - 1 amp panels and 1 - amp public panel. 1st floor unit to consist of 2 bedroom 1. 5 bath and 2nd floor unit to consist of 3 bedroom 3 bathroom Client: Duffy Frederick G | Permit type: Electrical permit | Expiration date: September 30, 2010 | Current use: 1-2fam | Permit id: E19705 | Parcel: 0201175000 | |||||
SCORE 64 Running new gas Client: Duffy Frederick G | Permit type: Gas permit | Expiration date: December 18, 2010 | Current use: 1-2fam | Permit id: G29745 | Parcel: 0201175000 | |||||
SCORE 64 New plumbing Client: Duffy Frederick G | Permit type: Plumbing permit | Expiration date: December 18, 2010 | Current use: 1-2fam | Permit id: Pl29744 | Parcel: 0201175000 | |||||
Renovation work to include removal of all plaster windows;and ceilings and replace with new installation (secure any floor openings) Date: March 24, 2010 Client: Duffy Frederick G | Permit type: Bfd construction demo reno | Permit id: Fdc18696 | Parcel: 0201175000 | |||||
SCORE 59 Remove all plaster from walls and ceilings in units 1 and 2. Install new electric plumbing and heating in unit 2. Install new french drain in basement and pour new concrete basement floor. Replace all old vinyl windows in units one and 2 with new vinyl windows. Install new blueboard and plaster in unit 2. Install new kitchen cabinets in unit 2 and remodel 3 bathrooms in unit 2. Client: Duffy Frederick G | Permit type: Short form bldg permit | Expiration date: September 18, 2010 | Current use: 1-2fam | Permit id: Sf18146 | Parcel: 0201175000 | |||||
SCORE 64 (2) family dwelling alt28071 issued 2/18/11 sf 18146 issued 3/18/ ; Date: August 3, 2011 Contractor: Guy Assetta Client: Forty 9 Baldwin St Condo Tr | Permit type: Certificate of occupancy | Current use: 1-2fam | Permit id: Coo88735 | Parcel: 0201175000 |