Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
18 - 2 inch diameter soil borings, using direct push, will be advanced to 35- ft below grade for soil and groundwater sampling. Approximately one week later, one, 3 one forth inch diameter hollow stem augers will be advanced to 45-75 ft below grade and 1inch diameter pvc pipe will be temporarily installed in order to collect groundwater samples. Drilling equipment will be decontaminated between each boring. The temporary well will be abandoned within 24 hours of installation and according to the protocols stated in the attached work plan. ![]() Client: Harry Martens Iii Imperial Investment | Applicant: Kim Mitchell Cdkm Consulting, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400042 | |||||
Oh - remove & install 1 poles at 48 wisc ave nw, northeast of 42nd st nw as indicated on the attached prints. Wr#3485114 (nichols/spelman) ![]() Client: Pepco | Permit type: Over head work; pole | Permit id: Pa113898 | |||||
SCORE 95 Repair service conduit breakdown in the sidewalk ![]() ![]() Permit type: Excavation; repair electric service (exavation) | Permit status: Permit expired | Expiration date: June 30, 2011 | Permit id: Pa61034 | |||||
SCORE 95 Construction staging area ![]() Permit status: Rejected | Expiration date: April 30, 2011 | Permit id: 0 | |||||
SCORE 95 Excavation; repair electric service (exavation) ![]() ![]() Permit status: 8 | Expiration date: June 30, 2011 | Permit id: Pa61034 | |||||
SCORE 96 Over head work; pole removal (single or first one) ![]() Permit status: 12 | Expiration date: January 12, 2018 | Permit id: 0 | |||||
SCORE 96 Remove 32 ft. Pole.@ intersection: wisconsin ave, and 42nd street nw robinson kanyuni wr# 3544996 ![]() ![]() Permit type: Over head work; pole removal (single or first one) | Permit status: Assigned | Expiration date: January 12, 2018 | Permit id: 0 | |||||
SCORE 100 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: March 26, 2017 | Permit id: Pa10376084 | |||||
SCORE 100 Repair water services in roadway 5'x6' ![]() ![]() Permit status: Permit expired | Expiration date: April 2, 2017 | Permit id: Pa200307 | |||||
SCORE 96 Remove 32 ft. Pole.@ intersection: wisconsin ave, and 42nd street nw robinson kanyuni wr# 3544996 ![]() Permit status: Assigned | Expiration date: January 12, 2018 | Permit id: 0 | |||||
SCORE 100 Construction staging area ![]() ![]() Permit status: Issued | Expiration date: March 26, 2017 | Permit id: Pa10376084 | |||||
SCORE 95 Oh - remove & install 1 poles at 48 wisc ave nw, northeast of 42nd st nw as indicated on the attached prints. Wr#3485114 (nichols/spelman) ![]() ![]() Permit type: Over head work; pole installation (single or first one), over head work; pole removal (single or first one) | Permit status: Permit expired | Expiration date: March 7, 2016 | Permit id: Pa113898 | |||||
SCORE 95 Oh - remove & install 1 poles at 48 wisc ave nw, northeast of 42nd st nw as indicated on the attached prints. Wr#3485114 (nichols spelman) ![]() ![]() Permit status: Permit expired | Expiration date: March 7, 2016 | Permit id: Pa113898 | |||||
SCORE 100 Repair water services in roadway 5'x6' ![]() ![]() Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: April 2, 2017 | Permit id: Pa200307 | |||||
SCORE 95 Construction staging area ![]() Permit status: Rejected | Expiration date: April 30, 2011 | Permit id: 0 | |||||
SCORE 96 Remove 32 ft. Pole.@ intersection: wisconsin ave, and 42nd street nw robinson kanyuni wr# 3544996 ![]() ![]() Permit status: Issued | Expiration date: January 5, 2018 | Permit id: Pa206841 | |||||
SCORE 96 18 - 2 inch diameter soil borings, using direct push, will be advanced to 35- ft below grade for soil and groundwater sampling. Approximately one week later, one, 3 one forth inch diameter hollow stem augers will be advanced to 45-75 ft below grade and 1inch diameter pvc pipe will be temporarily installed in order to collect groundwater samples. Drilling equipment will be decontaminated between each boring. The temporary well will be abandoned within 24 hours of installation and according to the protocols stated in the attached work plan. ![]() ![]() Client: Harry Martens Iii Imperial Investment | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400042 | |||||
SCORE 96 18 - 2 inch diameter soil borings, using direct push, will be advanced to 35- ft below grade for soil and groundwater sampling. Approximately one week later, one, 3 one forth inch diameter hollow stem augers will be advanced to 45-75 ft below grade and 1inch diameter pvc pipe will be temporarily installed in order to collect groundwater samples. Drilling equipment will be decontaminated between each boring. The temporary well will be abandoned within 24 hours of installation and according to the protocols stated in the attached work plan. ![]() ![]() Client: Harry Martens Iii Imperial Investment | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400042 | |||||
SCORE 89 Applicant requests dates from 01/19/2016 to 02/18/2016. Associated construction permit pa114702-r1. Work includes excavation to make a 774 ft x 4 ft trench from the 4700-48 block of wisconsin ave nw from ellicott st nw to chesapeake st nw: for a 138 kv transmission line pipe and an 8-ftwx21-ftl manhole in wisconsin ave nw from davenport st nw to chesapeake st nw. This phase is part of pepcos active and ongoing project to upgrade 138 kv transmission lines at van ness substation in nw. ![]() ![]() Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600240 |