Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Fire alarm system - bldg. 8 Date: February 28, 2005 Contractor: Adt Security Services Inc Client: Investment Emerald | Applicant: Adt Security Services, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: April 18, 2005 | Current use: Manufacturing, | |||||
SCORE 69 Date: December 8, 2004 Contractor: Investment Emerald Client: Investment Emerald | Applicant: Investment Emerald | Permit status: Cls | |||||
SCORE 95 Fire alarm system - protecto wire Date: December 8, 2004 Contractor: Western States Fire Protection Client: Investment Emerald | Applicant: Western States Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: April 18, 2005 | Current use: Research & deve | |||||
SCORE 95 Interior demo Date: August 9, 2004 Contractor: Quinlan Construction Inc Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: April 18, 2005 | Current use: Manufacturing, | |||||
SCORE 95 Interior remodel to convert office space to manufacturing Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 21, 2005 | Current use: Manufacturing, | |||||
SCORE 100 Install new 1 amp electric service panel with branch circuitry for napro biotherapeutics building 1. Date: April 3, 2003 Contractor: Kenny Electric Service Inc Client: Investment Emerald | Applicant: Kenny Electric Service Inc | Permit type: Electrical | Permit status: Cmp | Completion date: April 18, 2003 | Current use: Service industr | |||||
SCORE 95 Fire sprinkler tenant finish in valmont kitchens Date: April 12, 2000 Contractor: Wyco Fire Protection Inc Client: Investment Emerald,Investment Emerald | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Fire alarm system Date: June 10, 2002 Contractor: Adt Security Services Inc Client: Investment Emerald | Applicant: Adt Security Services, Inc. | Permit type: Fire | Permit status: Cmp | Current use: Warehousing, ex | |||||
SCORE 95 6" fireline tap Date: May 3, 2002 Contractor: Valley Excavating Inc Client: Investment Emerald | Applicant: Valley Excavating, Inc. | Permit type: Water | Permit status: Act | Current use: Manufacturing, | |||||
SCORE 67 Install roll up door on west side of structure, door to be 3 4 hr rated Client: Investment Emerald | Applicant: Napro Biotherapeutics, Inc. | Permit type: Building | Permit status: N&v | Current use: Office - admini | |||||
SCORE 95 Fire sprinkler system - napro Date: April 3, 2002 Contractor: Firetrol Protection Systems Client: Investment Emerald | Applicant: Firetrol Protection Systems | Permit type: Fire | Permit status: Cmp | Current use: Warehousing, ex | |||||
SCORE 67 Interior remodel Client: Investment Emerald | Applicant: Napro Biotherapeutics, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 15, 2002 | Current use: Manufacturing, | |||||
SCORE 67 Lab remodel Client: Investment Emerald | Applicant: Napro Biotherapeutics, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 13, 2002 | Current use: Office - techni | |||||
SCORE 96 Electric work associated with a tenant remodel including a new panel. Date: March 14, 2000 Contractor: Lord And Reynolds Elec Cont Inc Client: Investment Emerald | Applicant: Lord & Reynolds Elec Cont Inc | Permit type: Electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 98 Electrical permit to install new process for napro pharmaceuticals building #8. Date: May 23, 2001 Contractor: Piper Electric Co Inc Client: Emerald Investments Iii Llc | Applicant: Piper Electric Co Inc | Permit type: Electrical | Permit status: Cmp | Completion date: July 11, 2001 | Current use: Research & deve | |||||
SCORE 95 Fire sprinkler system - deluge system Date: April 24, 2001 Contractor: Western States Fire Protection Client: Emerald Investments Iii Llc | Applicant: Western States Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: June 27, 2001 | Current use: Research & deve | |||||
SCORE 89 Tenant finish for space d Client: Hight Enterprises Ltd | Applicant: Deneuve Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 12, 2001 | Current use: Manufacturing, | |||||
SCORE 89 8 amp elec. Service upgrade Date: February 4, 2000 Contractor: H And B Electric Client: Enterprise Hight | Applicant: H & B Electric (hank Brothers) | Permit type: Electrical | Permit status: Cmp | Completion date: May 22, 2000 | Current use: Warehousing, ne | |||||
SCORE 100 Mechanical permit to replace roof-top unit and ventilating equipment. Also includes duct work changes. Date: May 7, 2007 Contractor: Murphy Company Mech Cont And Eng Client: Investment Emerald | Applicant: Murphy Company Mech Cont & Eng | Permit type: Mechanical | Permit status: Cmp | Completion date: August 6, 2008 | Current use: Manufacturing, | |||||
SCORE 100 Electrical permit for new 4 amp service for mechanical upgrade. Date: May 16, 2007 Contractor: Kenny Electric Service Inc Client: Investment Emerald | Applicant: Kenny Electric Service, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: October 1, 2007 | Current use: Manufacturing, | |||||
SCORE 95 Interior remodel for existing tenant including lab and restroom remodel. Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 7, 2008 | Current use: Research & deve | |||||
SCORE 100 Scope of work letter relocate 2 existing heads Date: March 13, 2008 Contractor: Fire Defense Inc Client: Investment Emerald | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2008 | Current use: Office - profes | |||||
SCORE 99 Partial tear-off and overlay on industrial building. Mil epdm, 43 squares, 1 4:1 pitch. Date: August 1, 2008 Contractor: Weathersure Systems Inc Client: Investment Emerald | Applicant: Weathersure Systems, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: May 31, 2011 | Current use: Manufacturing, | |||||
SCORE 98 Scope of work letter for westwoods Date: January 9, 2009 Contractor: Lifeguard Fire Protection Inc Client: Enterprise Hight | Applicant: Lifeguard Fire Protection, Inc | Permit type: Fire | Permit status: Cmp | Completion date: April 21, 2009 | Current use: Office - admini | |||||
SCORE 98 Scope of work letter for unit a cellular recycle Date: January 13, 2009 Contractor: Lifeguard Fire Protection Inc Client: Enterprise Hight | Applicant: Lifeguard Fire Protection, Inc | Permit type: Fire | Permit status: Cmp | Completion date: April 21, 2009 | Current use: Office - techni | |||||
SCORE 95 Tenant remodel of 85 square feet of existing office space. Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Building | Permit status: Cmp | Completion date: August 3, 2009 | Current use: Office - techni | |||||
SCORE 100 Electrical rewire of technical office, see pmt2009-01972 for general permit. Date: June 3, 2009 Contractor: Kenny Electric Service Inc Client: Investment Emerald | Applicant: Kenny Electric Service, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: August 3, 2009 | Current use: Office - techni | |||||
SCORE 100 Scope of work letter hospira Date: June 30, 2009 Contractor: Fire Defense Inc Client: Investment Emerald | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Demolition reconfiguration of an existing loading dock and loading dock apron area, 20 sf. Client: Partnershi Sterling | Applicant: Tlm Construction Services Llc | Permit type: Building | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 100 Service change to 16 amps -- relocate mdp, share trench with excel. Date: September 9, 2009 Contractor: Kenny Electric Service Inc Client: Investment Emerald | Applicant: Kenny Electric Service, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: October 5, 2009 | Current use: Manufacturing, | |||||
SCORE 95 Addition of 243 s. F. To house a foam fire protection system for an adjacent warehouse. See adr2008-00206. No site work included. Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 30, 2009 | Current use: Warehousing, ex | |||||
SCORE 95 Sign permit - for new wall sign for inchcellular recyclerinch plus 5footx3foot logo. Date: November 9, 2009 Contractor: 20 Communications Client: Enterprise Hight | Applicant: 20/ Communications | Permit type: Sign | Permit status: Cmp | Completion date: January 21, 2010 | Current use: Commercial/reta | |||||
SCORE 95 New foam water fire suppression system for hospira building one Date: December 1, 2009 Contractor: Western States Fire Protection Client: Investment Emerald | Applicant: Western States Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: February 5, 2010 | Current use: Research & deve | |||||
SCORE 95 Replacement rtu for building 8, 7. 5 ton, 11. 5 eer. Replacement system, same size and location. Date: February 7, 2011 Contractor: Timberline Mechanical Systems Client: Investment Emerald | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: July 7, 2011 | Current use: Existing | |||||
SCORE 95 New 4inch ames colt backflow preventor for hospira bldg 3 Date: August 3, 2011 Contractor: Western States Fire Protection Client: Investment Emerald | Applicant: Western States Fire Protection | Permit type: Fire | Permit status: Iss | Current use: Research & deve | |||||
SCORE 95 Electrical permit only to install new amp panel off existing service. Date: October 17, 2011 Contractor: Merit Electric Inc Client: Enterprise Hight | Applicant: Merit Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: November 15, 2011 | Current use: Existing | |||||
SCORE 95 Tennant finish sprinkler for hospira lab relocation of four sprinkler heads and addition of 4 sprinkler heads Date: January 4, 2012 Contractor: Western States Fire Protection Client: Investment Emerald | Applicant: Western States Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: June 25, 2012 | Current use: Research & deve | |||||
SCORE 95 Reconfiguration addition of walls to create an office in an existing office area. Includes associated electrical (replace light fixtures) and mechanical (relocate diffuster) work. No plumbing. Client: Partnershi Sterling | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 3, 2012 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel of 1,1 sf to create offices, storage areas, modify a single restroom and add an additional restroom. Client: Partnershi Sterling | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 4, 2013 | Current use: Office - techni | |||||
SCORE 95 Interior tenant remodel of office and laboratory area for a pharmaceutical company - inchhospirainch. Includes associated electrical, mechanical, and plumbing. Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 18, 2013 | Current use: Office - techni | |||||
SCORE 100 Set new handhole on s. Side of sterling bore along sterling 100foot. Pull fiber from manhole. Access manhole at 47th & valmont for splicing Date: September 18, 2012 Contractor: Qwest Comm Centurylink Client: Investment Emerald | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Demolition of 4,670sf interior non-structural elements - technical office building. Date: October 8, 2012 Contractor: Quinlan Construction Inc Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Iss | Current use: Office - techni | |||||
SCORE 100 Tap install new 1inch domestic water service (abandon existing 3 4inch service) and new 4inch fireline from existing 8inch dip main in easement. Date: November 15, 2012 Contractor: Ez Excavating Inc Client: Investment Emerald | Applicant: E-Z Excavating, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Fs - new for office Date: December 19, 2012 Contractor: Fire Defense Inc Client: Investment Emerald | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Office - admini | |||||
SCORE 96 Electrical permit - replace existing 2 amp meter to 4 amp meter. Install new 2 amp panel. Date: January 24, 2013 Contractor: H B Electric Client: Enterprise Hight | Applicant: H B Electric (hank Brothers Inc) | Permit type: Electrical | Permit status: Cmp | Completion date: February 11, 2013 | Current use: Manufacturing, | |||||
SCORE 95 Fa - tf office Date: February 8, 2013 Contractor: Tyco Integrated Security Llc Client: Investment Emerald | Applicant: Tyco Integrated Security Llc | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Office - admini | |||||
SCORE 95 New clean agent preaction system Date: February 19, 2013 Contractor: Westfire Inc Client: Investment Emerald | Applicant: Westfire Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Manufacturing, | |||||
SCORE 100 New preaction Date: February 20, 2013 Contractor: Fire Defense Inc Client: Investment Emerald | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Manufacturing, | |||||
SCORE 100 Cable replacement in easement and private property, sidewalk closure, r&r sidewalk Date: August 16, 2013 Contractor: Xcel Energy Client: Investment Emerald | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Replace underground cable Date: August 23, 2013 Contractor: Xcel Energy Client: Investment Emerald | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Replacement of electrical service panel inchlinch with larger panel and adding two circuits. Date: November 20, 2013 Contractor: Kenny Electric Service Inc Client: Partnershi Sterling | Applicant: Kenny Electric Service, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: February 26, 2014 | Current use: Manufacturing, | |||||
SCORE 95 Hospira-new breathing air compressor room located between building #1 and building #2. See adr2014-00007 for approval. Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 20, 2015 | Current use: Warehousing, ad | |||||
SCORE 100 Fs - sowl - inchadd 2 pendent sprinklers to the new compressor room. Inch Date: May 15, 2014 Contractor: Freedom Fire Protection Llc Client: Investment Emerald | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Cmp | Completion date: April 20, 2015 | Current use: Research & deve | |||||
SCORE 100 Hospira boulder-install access control devices to 1 door and tie into the existing access control system. Hardware includes card reader, electric strike, door contact, and request to exit device. Client: Investment Emerald | Applicant: Convergint Technologies | Permit type: Building | Permit status: Cmp | Completion date: March 19, 2015 | Current use: Research & deve | |||||
SCORE 95 Tenant interior remodel to add interior partition walls to create a vestibule and closet in materials storage area. New rtu will be added with requisite structural support work. Client: Investment Emerald | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Act | Current use: Warehousing, te | |||||
SCORE 99 Scope of work letter for westwoods Client: Enterprise Hight | Permit type: Fire | Permit status: Cmp | Completion date: April 21, 2009 | Current use: Office - administrative, existing | Permit id: Pmt2009-00060 | |||||
SCORE 99 Scope of work letter for unit a cellular recycle Client: Enterprise Hight | Permit type: Fire | Permit status: Cmp | Completion date: April 21, 2009 | Current use: Office - technical, existing | Permit id: Pmt2009-00061 | |||||
SCORE 95 Electrical rewire of technical office, see pmt2009-01972 for general permit. Client: Investment Emerald | Permit type: Electrical | Permit status: Cmp | Completion date: August 3, 2009 | Current use: Office - technical, existing | Permit id: Pmt2009-01973 | |||||
SCORE 95 Scope of work letter hospira Client: Investment Emerald | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2009-02487 | |||||
SCORE 95 Service change to 16 amps -- relocate mdp, share trench with excel. Client: Investment Emerald | Permit type: Electrical | Permit status: Cmp | Completion date: October 5, 2009 | Current use: Manufacturing, existing | Permit id: Pmt2009-03564 | |||||
SCORE 95 Addition of 243 s. F. To house a foam fire protection system for an adjacent warehouse. See adr2008-00206. No site work included. Client: Investment Emerald | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 30, 2009 | Current use: Warehousing, existing, shop, new | Permit id: Pmt2009-03941 | |||||
SCORE 95 Sign permit - for new wall sign for inchcellular recyclerinch plus 5footx3foot logo. Client: Enterprise Hight | Permit type: Sign | Permit status: Cmp | Completion date: January 21, 2010 | Current use: Commercial/retail, existing | Permit id: Pmt2009-04543 | |||||
SCORE 95 New foam water fire suppression system for hospira building one Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: February 5, 2010 | Current use: Research & development, existing | Permit id: Pmt2009-04838 | |||||
SCORE 95 Fa - tf office Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-00555 | |||||
SCORE 95 New clean agent preaction system Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Manufacturing, existing | Permit id: Pmt2013-00712 | |||||
SCORE 95 New preaction Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Manufacturing, existing | Permit id: Pmt2013-00737 | |||||
Cable replacement in easement and private property, sidewalk closure, r&r sidewalk Date: August 16, 2013 Client: Investment Emerald | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2013-03933 | |||||
Replace underground cable Date: August 23, 2013 Client: Investment Emerald | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2013-04119 | |||||
SCORE 95 Replacement of electrical service panel inchlinch with larger panel and adding two circuits. Client: Partnershi Sterling | Permit type: Electrical | Permit status: Cmp | Completion date: February 26, 2014 | Current use: Manufacturing, existing | Permit id: Pmt2013-06556 | |||||
SCORE 95 Fire sprinkler tenant finish in valmont kitchens Client: Investment Emerald | Permit type: Fire | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2000-01446 | |||||
SCORE 95 Fire sprinkler system - deluge system Client: Emerald Investments Iii Llc | Permit type: Fire | Permit status: Cmp | Completion date: June 27, 2001 | Current use: Research & development, existing | Permit id: Pmt2001-01516 | |||||
SCORE 98 Electrical permit to install new process for napro pharmaceuticals building #8. Client: Emerald Investments Iii Llc | Permit type: Electrical | Permit status: Cmp | Completion date: July 11, 2001 | Current use: Research & development, existing | Permit id: Pmt2001-01744 | |||||
SCORE 67 Lab remodel Client: Investment Emerald | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: March 13, 2002 | Current use: Office - technical, remodel | Permit id: Pmt2001-04629 | |||||
SCORE 95 Hospira-new breathing air compressor room located between building #1 and building #2. See adr2014-00007 for approval. Client: Investment Emerald | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: April 20, 2015 | Current use: Warehousing, addition | Permit id: Pmt2014-01082 | |||||
SCORE 95 Fs - sowl - inchadd 2 pendent sprinklers to the new compressor room. Inch Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: April 20, 2015 | Current use: Research & development, existing | Permit id: Pmt2014-02197 | |||||
SCORE 95 Tennant finish sprinkler for hospira lab relocation of four sprinkler heads and addition of 4 sprinkler heads Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: June 25, 2012 | Current use: Research & development, existing | Permit id: Pmt2012-00008 | |||||
SCORE 95 Reconfiguration addition of walls to create an office in an existing office area. Includes associated electrical (replace light fixtures) and mechanical (relocate diffuster) work. No plumbing. Client: Partnershi Sterling | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: December 3, 2012 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2012-03303 | |||||
SCORE 95 Tenant remodel of 1,1 sf to create offices, storage areas, modify a single restroom and add an additional restroom. Client: Partnershi Sterling | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 4, 2013 | Current use: Office - technical, tenant remodel | Permit id: Pmt2012-03737 | |||||
SCORE 95 Interior tenant remodel of office and laboratory area for a pharmaceutical company - inchhospirainch. Includes associated electrical, mechanical, and plumbing. Client: Investment Emerald | Permit type: Building, electrical, mechanical, plumbing, fire, water | Permit status: Cmp | Completion date: March 18, 2013 | Current use: Office - technical, remodel | Permit id: Pmt2012-04271 | |||||
Set new handhole on s. Side of sterling bore along sterling 100foot. Pull fiber from manhole. Access manhole at 47th & valmont for splicing Date: September 18, 2012 Client: Investment Emerald | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-04441 | |||||
SCORE 95 Tap install new 1inch domestic water service (abandon existing 3 4inch service) and new 4inch fireline from existing 8inch dip main in easement. Date: November 15, 2012 Contractor: E Z Excavating Inc Client: Investment Emerald | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-05507 | |||||
SCORE 95 Fs - new for office Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: March 15, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2012-06016 | |||||
SCORE 96 Electrical permit - replace existing 2 amp meter to 4 amp meter. Install new 2 amp panel. Client: Enterprise Hight | Permit type: Electrical | Permit status: Cmp | Completion date: February 11, 2013 | Current use: Manufacturing, existing | Permit id: Pmt2012-06051 | |||||
SCORE 95 Scope of work letter relocate 2 existing heads Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-00901 | |||||
SCORE 95 Replacement rtu for building 8, 7. 5 ton, 11. 5 eer. Replacement system, same size and location. Client: Investment Emerald | Permit type: Mechanical | Permit status: Cmp | Completion date: July 7, 2011 | Current use: Existing | Permit id: Pmt2011-00541 | |||||
SCORE 95 New 4inch ames colt backflow preventor for hospira bldg 3 Client: Investment Emerald | Permit type: Fire | Permit status: Iss | Current use: Research & development, existing | Permit id: Pmt2011-03306 | |||||
SCORE 95 Electrical permit only to install new amp panel off existing service. Client: Enterprise Hight | Permit type: Electrical | Permit status: Cmp | Completion date: November 15, 2011 | Current use: Existing | Permit id: Pmt2011-04478 | |||||
SCORE 95 Tenant interior remodel to add interior partition walls to create a vestibule and closet in materials storage area. New rtu will be added with requisite structural support work. Client: Investment Emerald | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Warehousing, tenant remodel | Permit id: Pmt2015-03529 | |||||
SCORE 89 8 amp elec. Service upgrade Client: Enterprise Hight | Permit type: Electrical | Permit status: Cmp | Completion date: May 22, 2000 | Current use: Warehousing, new | Permit id: Pmt2000-00423 | |||||
SCORE 89 Tenant finish for space d Client: Hight Enterprises Ltd | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: January 12, 2001 | Current use: Manufacturing, tenant finish | Permit id: Pmt2000-00792 | |||||
SCORE 96 Electric work associated with a tenant remodel including a new panel. Client: Investment Emerald | Permit type: Electrical | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2000-00990 | |||||
SCORE 67 Interior remodel Client: Investment Emerald | Permit type: Building, electrical, mechanical, plumbing, flood not required | Permit status: Cmp | Completion date: July 15, 2002 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2002-00899 | |||||
SCORE 95 Fire sprinkler system - napro Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Current use: Warehousing, existing | Permit id: Pmt2002-01209 | |||||
SCORE 67 Install roll up door on west side of structure, door to be 3 4 hr rated Client: Investment Emerald | Permit type: Building | Permit status: N&v | Current use: Office - administrative, remodel | Permit id: Pmt2002-01346 | |||||
SCORE 95 6inch fireline tap Contractor: Valley Excavating, Inc Client: Investment Emerald | Permit type: Water | Permit status: Act | Current use: Manufacturing, existing | Permit id: Pmt2002-01769 | |||||
SCORE 95 6inch fireline tap Date: May 6, 2002 Contractor: Valley Excavating, Inc Client: Investment Emerald | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2002-01770 | |||||
SCORE 95 Fire alarm system Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Current use: Warehousing, existing | Permit id: Pmt2002-02397 | |||||
SCORE 100 Install new 1 amp electric service panel with branch circuitry for napro biotherapeutics building 1. Client: Investment Emerald | Permit type: Electrical | Permit status: Cmp | Completion date: April 18, 2003 | Current use: Service industrial, existing | Permit id: Pmt2003-01155 | |||||
SCORE 95 Interior remodel to convert office space to manufacturing Client: Investment Emerald | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 21, 2005 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2004-03113 | |||||
SCORE 95 Fire alarm system - protecto wire Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: April 18, 2005 | Current use: Research & development, existing | Permit id: Pmt2004-04682 | |||||
SCORE 95 Fire alarm system - bldg. 8 Client: Investment Emerald | Permit type: Fire | Permit status: Cmp | Completion date: April 18, 2005 | Current use: Manufacturing, existing | Permit id: Pmt2005-00646 | |||||
SCORE 100 Mechanical permit to replace roof-top unit and ventilating equipment. Also includes duct work changes. Client: Investment Emerald | Permit type: Mechanical | Permit status: Cmp | Completion date: August 6, 2008 | Current use: Manufacturing, existing | Permit id: Pmt2007-01647 | |||||
SCORE 95 Electrical permit for new 4 amp service for mechanical upgrade. Client: Investment Emerald | Permit type: Electrical | Permit status: Cmp | Completion date: October 1, 2007 | Current use: Manufacturing, existing | Permit id: Pmt2007-01802 | |||||
SCORE 95 Interior remodel for existing tenant including lab and restroom remodel. Client: Investment Emerald | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 7, 2008 | Current use: Research & development, tenant remodel | Permit id: Pmt2007-02874 | |||||
SCORE 95 Partial tear-off and overlay on industrial building. Mil epdm, 43 squares, 1 4:1 pitch. Client: Investment Emerald | Permit type: Roofing | Permit status: Cmp | Completion date: May 31, 2011 | Current use: Manufacturing, existing | Permit id: Pmt2008-03306 | |||||
SCORE 95 Demolition reconfiguration of an existing loading dock and loading dock apron area, 20 sf. Value: $20,000 Contractor: Tlm Construction Services Llc Client: Partnershi Sterling | Permit type: Building | Permit status: N&v | Current use: Manufacturing, alteration | Permit id: Pmt2009-03504 | |||||
SCORE 95 Fs - sowl - change pendents to uprights (approx 12) Value: $2,150 Contractor: Western States Fire Protection Client: Investment Emerald | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2015-04831 | |||||
SCORE 95 Replacement non-electric wall sign. Sign copy reads, inchpfizerinch Value: $750 Contractor: Royal Signs Inc Client: Partnershi Sterling | Permit type: Sign | Permit status: Den | Current use: Office - professional, existing | Permit id: Pmt2015-05116 | |||||
SCORE 95 Grading permit application for 35 cubic yards. Temporary use. Will use haybails for protection. Area will be less than. 1 acre. Date: May 8, 2006 Contractor: Wyatt Construction Company Client: Industrial Aspen | Applicant: Wyatt Construction Company | Permit type: Grading | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 98 Add one new lightpole in existing storage area. Pole will not exceed 15 feet in height. Head will be cut off type shown on attachement. Date: February 15, 2006 Contractor: Associated Electric Co Inc Client: Sterling 5330.0 | Applicant: Associated Electric Co Inc | Permit type: Electrical | Permit status: Cmp | Completion date: March 22, 2006 | Current use: Manufacturing, | |||||
SCORE 95 New fire sprinkler system for the entire building. Wet and dry system. Date: April 3, 2000 Contractor: Master Plumbers Inc Client: Aspen Industrial Park | Applicant: Master Plumbers Inc | Permit type: Fire | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Service industr | |||||
SCORE 99 Tenant remodel on first floor. Client: Mks Instruments Inc | Applicant: Richard Powell & Assoc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 15, 2001 | Current use: Manufacturing, | |||||
SCORE 99 Tenant remodel. Add office on first floor. Client: Industrial Aspen | Applicant: Richard Powell & Assoc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 4, 2001 | Current use: Office - admini | |||||
SCORE 98 Hookup zenith washer and add outlets in wash room. Date: May 31, 2001 Contractor: Associated Electric Co Inc Client: Mks Instrument Inc | Applicant: Associated Electric Co Inc | Permit type: Electrical | Permit status: Cmp | Completion date: June 19, 2001 | Current use: Manufacturing, | |||||
SCORE 98 Replace recessed outside lights with surface mounted lights. Date: May 31, 2001 Contractor: Associated Electric Co Inc Client: Aspen Industrial Park | Applicant: Associated Electric Co Inc | Permit type: Electrical | Permit status: Cmp | Completion date: June 19, 2001 | Current use: Manufacturing, | |||||
SCORE 95 Re-roof office building with modified roof system Date: April 25, 2001 Contractor: B And M Roofing Of Colorado Inc Client: Industrial Aspen | Applicant: B & M Roofing Of Colorado Inc | Permit type: Roofing | Permit status: N&v | Current use: Office - admini | |||||
SCORE 98 Set new 2 amp subpanel. Date: April 11, 2001 Contractor: Associated Electric Co Inc Client: Industrial Aspen | Applicant: Associated Electric Co Inc | Permit type: Electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 99 Tenant remodel which includes the addition of a wall and door. No plumbing, electrical or mechanical is associated with this permit. Client: Instrument Mks | Applicant: Richard Powell & Assoc | Permit type: Building | Permit status: Cmp | Completion date: May 23, 2001 | Current use: Manufacturing, | |||||
SCORE 100 Install 1,000,0 btu low pressure boiler in side one hour rated room. Date: March 2, 2001 Contractor: Design Mechanical Inc Client: Instrument Mks | Applicant: Design Mechanical Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: June 19, 2001 | Current use: Manufacturing, | |||||
SCORE 98 Electrical connection for new boiler. Date: February 21, 2001 Contractor: Associated Electric Co Inc Client: Instrument Mks | Applicant: Associated Electric Co Inc | Permit type: Electrical | Permit status: Cmp | Completion date: April 11, 2001 | Current use: Manufacturing, | |||||
SCORE 98 Electrical connection of new boiler. Date: February 21, 2001 Contractor: Associated Electric Co Inc Client: Aspen Industrial Park | Applicant: Associated Electric Co Inc | Permit type: Electrical | Permit status: Cmp | Completion date: February 27, 2001 | Current use: Manufacturing, | |||||
SCORE 99 Build room to house compressor (compressor installation not in the scope of this permit). Drop ceiling at 10, install hvac supply and rebalance. Client: Mks Instruments Inc | Applicant: Richard Powell & Assoc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 12, 2001 | Current use: Manufacturing, | |||||
SCORE 56 Installation of boiler and d. I. Wash system Date: November 28, 2000 Contractor: Industrial Aspen Client: Industrial Aspen | Applicant: Industrial Aspen | Permit type: Mechanical, plumbing | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 99 Demolition permit associated with tenat remodel on pmt2000-04615 Date: November 9, 2000 Contractor: Richard Powell And Assoc Client: Mks Instrument Inc | Applicant: Richard Powell & Assoc | Permit type: Demolition | Permit status: Cmp | Completion date: December 5, 2000 | Current use: Manufacturing, | |||||
SCORE 99 Build new walls and relocate sink. Client: Mks Instruments Inc | Applicant: Richard Powell & Assoc | Permit type: Building, electrical | Permit status: Act | Completion date: January 4, 2001 | Current use: Manufacturing, | |||||
SCORE 95 Fire sprinkler system - tenant finish Date: October 27, 2000 Contractor: Master Plumbers Inc Client: Industrial Aspen | Applicant: Master Plumbers Inc | Permit type: Fire | Permit status: Cmp | Completion date: November 8, 2000 | Current use: Office - techni | |||||
SCORE 98 Electrical permit to hook-up equipment Date: October 5, 2000 Contractor: Associated Electric Co Inc Client: Instrument Mks | Applicant: Associated Electric Co Inc | Permit type: Electrical | Permit status: Cmp | Completion date: January 10, 2008 | Current use: Manufacturing, | |||||
SCORE 98 Fire alarm - 2nd floor Date: September 28, 2000 Contractor: Associated Electric Co Inc Client: Aspen Industrial Park | Applicant: Associated Electric Co Inc | Permit type: Fire | Permit status: Cmp | Completion date: November 9, 2000 | Current use: Office - techni | |||||
SCORE 95 Tenant finish Client: Aspen Industrial Park | Applicant: Kenney Bros Construction Co | Permit type: Building, electrical | Permit status: Co | Current use: Office - admini | |||||
SCORE 88 Install duct work for tenant finish. Date: August 17, 2000 Contractor: Encompass Mechanical Services Client: Aspen Industrial Park | Applicant: Encompass Mechanical Services | Permit type: Mechanical | Permit status: Cmp | Completion date: August 5, 2008 | Current use: Manufacturing, | |||||
SCORE 99 Tenant finish to convert manufacturing space to office. Client: Aspen Industrial Park | Applicant: Richard Powell & Assoc | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 22, 2001 | Current use: Manufacturing, | |||||
SCORE 95 Add second door to elevator on second floor also demising seperation wall to create office space. Client: Industrial Aspen | Applicant: Kenney Bros Construction Co | Permit type: Building | Permit status: N&v | Current use: Office - admini | |||||
SCORE 98 Fire alarm system Date: May 22, 2000 Contractor: Associated Electric Co Inc Client: Industrial Aspen | Applicant: Associated Electric Co Inc | Permit type: Fire | Permit status: Cmp | Completion date: October 19, 2000 | Current use: Office - techni | |||||
SCORE 98 Machine hookup and misc. Electric work Date: May 11, 2000 Contractor: Associated Electric Co Inc Client: Instrument Mks | Applicant: Associated Electric Co Inc | Permit type: Electrical | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Office - techni | |||||
SCORE 86 Install a new 2 story elevator with a passenger capacity of 35 pounds. Date: March 3, 2000 Contractor: Thyssen Dover Elevator Client: Aspen Industrial Park | Applicant: Thyssen Dover Elevator | Permit type: Elevator | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Manufacturing, | |||||
SCORE 95 Remove existing roofing and re-roof building with sbs modified. 152 squares, 1 4:1 pitch. Date: January 28, 2008 Contractor: B And M Roofing Of Colorado Inc Client: Instrument Mks | Applicant: B & M Roofing Of Colorado Inc | Permit type: Roofing | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Warehousing, ex | |||||
SCORE 56 Electrical permit - for relocation of electrical for machine location changes in manufacturing facility. Date: June 25, 2010 Contractor: Instrument Mks Client: Instrument Mks | Applicant: Instrument Mks | Permit type: Electrical | Permit status: Cmp | Completion date: January 14, 2013 | Current use: Manufacturing, | |||||
SCORE 97 Interior alteration to remove non-structural walls to open up the space. Scope of work includes minor electrical work. Client: Sterling Awr | Applicant: Kenney Brothers Construction Co | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 29, 2015 | Current use: Manufacturing, | |||||
SCORE 98 Installation new busway for welding equipment for mks instruments. Electrical only. Date: February 9, 2015 Contractor: Associated Electric Co Inc Client: Sterling Awr | Applicant: Associated Electric Co, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: May 14, 2015 | Current use: Manufacturing, | |||||
SCORE 97 Tenant interior remodel to office space on second level and a portion of manufacturing area on main level for instrument manufacturer. Client: Sterling Awr | Applicant: Kenney Brothers Construction Co | Permit type: Building, electrical | Permit status: Iss | Current use: Office - techni | |||||
SCORE 97 Interior non-structural demolition in preparation for tenant remodel under pmt2015-03107. Date: July 24, 2015 Contractor: Kenney Brothers Construction Co Client: Sterling Awr | Applicant: Kenney Brothers Construction Co | Permit type: Demolition | Permit status: Iss | Current use: Office - techni | |||||
SCORE 100 Boring across sterling and placing a hand hole. Job #e. 790752 aqcb Date: August 26, 2015 Contractor: Qwest Comm Centurylink Client: Sterling Awr | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Add second door to elevator on second floor also demising seperation wall to create office space. Client: Industrial Aspen | Permit type: Building | Permit status: N&v | Current use: Office - administrative, tenant finish | Permit id: Pmt2000-02604 | |||||
Installation of boiler and d. I. Wash system Date: November 28, 2000 Value: $38 Client: Industrial Aspen | Permit type: Mechanical, plumbing | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2000-04844 | |||||
SCORE 99 Build room to house compressor (compressor installation not in the scope of this permit). Drop ceiling at 10foot, install hvac supply and rebalance. Client: Mks Instruments Inc | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: March 12, 2001 | Current use: Manufacturing, remodel | Permit id: Pmt2001-00446 | |||||
SCORE 98 Electrical connection of new boiler. Client: Aspen Industrial Park | Permit type: Electrical | Permit status: Cmp | Completion date: February 27, 2001 | Current use: Manufacturing, existing | Permit id: Pmt2001-00603 | |||||
SCORE 98 Electrical connection for new boiler. Client: Instrument Mks | Permit type: Electrical | Permit status: Cmp | Completion date: April 11, 2001 | Current use: Manufacturing, existing | Permit id: Pmt2001-00604 | |||||
SCORE 100 Install 1,000,0 btu low pressure boiler in side one hour rated room. Client: Instrument Mks | Permit type: Mechanical | Permit status: Cmp | Completion date: June 19, 2001 | Current use: Manufacturing, existing | Permit id: Pmt2001-00747 | |||||
SCORE 98 Set new 2 amp subpanel. Client: Industrial Aspen | Permit type: Electrical | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2001-01325 | |||||
SCORE 95 Re-roof office building with modified roof system Client: Industrial Aspen | Permit type: Roofing | Permit status: N&v | Current use: Office - administrative, existing | Permit id: Pmt2001-01591 | |||||
SCORE 98 Replace recessed outside lights with surface mounted lights. Client: Aspen Industrial Park | Permit type: Electrical | Permit status: Cmp | Completion date: June 19, 2001 | Current use: Manufacturing, existing | Permit id: Pmt2001-02213 | |||||
SCORE 98 Hookup zenith washer and add outlets in wash room. Client: Mks Instrument Inc | Permit type: Electrical | Permit status: Cmp | Completion date: June 19, 2001 | Current use: Manufacturing, existing | Permit id: Pmt2001-02215 | |||||
SCORE 98 Electrical permit - for relocation of electrical for machine location changes in manufacturing facility. Client: Instrument Mks | Permit type: Electrical | Permit status: Cmp | Completion date: January 14, 2013 | Current use: Manufacturing, existing | Permit id: Pmt2010-02603 | |||||
SCORE 97 Interior alteration to remove non-structural walls to open up the space. Scope of work includes minor electrical work. Client: Sterling Awr | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 29, 2015 | Current use: Manufacturing, alteration | Permit id: Pmt2015-00146 | |||||
SCORE 66 Installation new busway for welding equipment for mks instruments. Electrical only. Client: Sterling Awr | Permit type: Electrical | Permit status: Cmp | Completion date: May 14, 2015 | Current use: Manufacturing, existing | Permit id: Pmt2015-00161 | |||||
SCORE 97 Tenant interior remodel to office space on second level and a portion of manufacturing area on main level for instrument manufacturer. Client: Sterling Awr | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2015-03107 | |||||
Boring across sterling and placing a hand hole. Job #e. 790752 aqcb Date: August 26, 2015 Client: Sterling Awr | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-03567 | |||||
SCORE 86 Install a new 2 story elevator with a passenger capacity of 35 pounds. Client: Aspen Industrial Park | Permit type: Elevator | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Manufacturing, existing | Permit id: Pmt2000-00886 | |||||
SCORE 95 New fire sprinkler system for the entire building. Wet and dry system. Client: Aspen Industrial Park | Permit type: Fire | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Service industrial, existing | Permit id: Pmt2000-01289 | |||||
SCORE 98 Machine hookup and misc. Electric work Client: Instrument Mks | Permit type: Electrical | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Office - technical, existing | Permit id: Pmt2000-01931 | |||||
SCORE 98 Fire alarm system Client: Industrial Aspen | Permit type: Fire | Permit status: Cmp | Completion date: October 19, 2000 | Current use: Office - technical, existing | Permit id: Pmt2000-02049 | |||||
SCORE 99 Tenant finish to convert manufacturing space to office. Client: Aspen Industrial Park | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: January 22, 2001 | Current use: Manufacturing, remodel | Permit id: Pmt2000-03172 | |||||
SCORE 88 Install duct work for tenant finish. Client: Aspen Industrial Park | Permit type: Mechanical | Permit status: Cmp | Completion date: August 5, 2008 | Current use: Manufacturing, alteration | Permit id: Pmt2000-03221 | |||||
SCORE 95 Tenant finish Client: Aspen Industrial Park | Permit type: Building, electrical, plumbing | Permit status: Co | Current use: Office - administrative, tenant finish | Permit id: Pmt2000-03315 | |||||
SCORE 98 Fire alarm - 2nd floor Client: Aspen Industrial Park | Permit type: Fire | Permit status: Cmp | Completion date: November 9, 2000 | Current use: Office - technical, existing | Permit id: Pmt2000-03975 | |||||
SCORE 98 Electrical permit to hook-up equipment Client: Instrument Mks | Permit type: Electrical | Permit status: Cmp | Completion date: January 10, 2008 | Current use: Manufacturing, existing | Permit id: Pmt2000-04116 | |||||
SCORE 95 Fire sprinkler system - tenant finish Client: Industrial Aspen | Permit type: Fire | Permit status: Cmp | Completion date: November 8, 2000 | Current use: Office - technical, existing | Permit id: Pmt2000-04255 | |||||
SCORE 99 Build new walls and relocate sink. Client: Mks Instruments Inc | Permit type: Building, electrical, mechanical, plumbing | Permit status: Act | Completion date: January 4, 2001 | Current use: Manufacturing, tenant finish | Permit id: Pmt2000-04615 | |||||
Installation of boiler and d. I. Wash system Date: November 28, 2000 Value: $38,500 Client: Industrial Aspen | Permit type: Mechanical, plumbing | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2000-04844 | |||||
SCORE 99 Tenant remodel on first floor. Client: Mks Instruments Inc | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: February 15, 2001 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2000-05025 | |||||
SCORE 99 Tenant remodel. Add office on first floor. Client: Industrial Aspen | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: April 4, 2001 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2000-05026 | |||||
SCORE 98 Add one new lightpole in existing storage area. Pole will not exceed 15 feet in height. Head will be cut off type shown on attachement. Client: Sterling | Permit type: Electrical | Permit status: Cmp | Completion date: March 22, 2006 | Current use: Manufacturing, existing | Permit id: Pmt2006-00540 | |||||
SCORE 95 Grading permit application for 35 cubic yards. Temporary use. Will use haybails for protection. Area will be less than. 1 acre. Contractor: Wyatt Construction Company Client: Industrial Aspen | Permit type: Grading | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2006-01711 | |||||
SCORE 95 Remove existing roofing and re-roof building with sbs modified. 152 squares, 1 4:1 pitch. Client: Instrument Mks | Permit type: Roofing | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Warehousing, existing | Permit id: Pmt2008-00298 | |||||
SCORE 100 Tenant finish Client: Westland Development Services | Applicant: Westland Development Services | Permit type: Building, electrical | Permit status: Co | Current use: Office - admini | |||||
SCORE 94 Tenant finish for portion of first floor Client: Westland Development Services Inc | Applicant: Westland Construction Company Llc | Permit type: Building, electrical | Permit status: Co | Current use: Warehousing, te | |||||
SCORE 94 Tenant finish to space on first floor Client: Westland Development Services | Applicant: Westland Construction Company Llc | Permit type: Building, electrical | Permit status: Co | Current use: Office - profes | |||||
SCORE 100 Fire alarm system Date: January 24, 2002 Contractor: Safe Systems Inc Client: Westland Development Services Inc | Applicant: Safe Systems Inc. | Permit type: Fire | Permit status: Cmp | Completion date: March 27, 2002 | Current use: Office - profes | |||||
SCORE 100 Tenant finish Client: Developmen Westland,Developmen Westland | Applicant: Westland Development Services | Permit type: Building, electrical | Permit status: N&v | Current use: Office - admini | |||||
SCORE 58 Tenant finish Client: Westland Development Services | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - administrative, tenant finish | Permit id: Pmt2000-01270 | |||||
SCORE 100 Tenant finish Client: Developmen Westland | Permit type: Building, electrical, mechanical | Permit status: N&v | Current use: Office - administrative, tenant finish | Permit id: Pmt2000-02264 | |||||
SCORE 94 Tenant finish for portion of first floor Client: Westland Development Services Inc | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Warehousing, tenant finish | Permit id: Pmt2000-03791 | |||||
SCORE 94 Tenant finish to space on first floor Client: Westland Development Services | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - professional, tenant finish | Permit id: Pmt2000-05138 | |||||
SCORE 100 Fire alarm system Client: Westland Development Services Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 27, 2002 | Current use: Office - professional, existing | Permit id: Pmt2002-00241 |