Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof re-roofing, demo, drywall molded areas, patch and repair existing drywall walls and ceiling tile. Install one 1 exterior door. Replace vct flooring and second floor carpenting. Date: July 31, 2013 Client: Al Malik Farrakhan Cease Fire Dont Smoke The Brothers ? Sisters | Applicant: Amin S. Abdulla Has Construction | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1308868 | |||||
Electrical Date: August 5, 2013 Client: Cease Fire Dont Smoke The Brothers Inc | Applicant: Ronald Hawkins | Permit status: Completed | Permit id: E1307362 | |||||
SCORE 96 Electrical Date: August 5, 2013 Contractor: Ronald Hawkins Client: Cease Fire Dont Smoke The Brothers Inc | Permit status: Completed | Permit id: E1307362 | |||||
SCORE 96 Electrical Date: August 5, 2013 Contractor: Ronald Hawkins Client: Cease Fire Dont Smoke The Brothers Inc | Permit status: Completed | Permit id: E1307362 | |||||
SCORE 56 Roof re-roofing, demo, drywall molded areas, patch and repair existing drywall walls and ceiling tile. Install one 1 exterior door. Replace vct flooring and second floor carpenting. Date: July 31, 2013 Contractor: Amin S. Abdulla Has Construction Client: Al Malik Farrakhan Cease Fire Dont Smoke The Brothers ? Sisters | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1308868 | |||||
SCORE 96 Electrical Date: August 5, 2013 Contractor: Ronald Hawkins Client: Cease Fire Dont Smoke The Brothers Inc | Permit status: Completed | Permit id: E1307362 |