Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: September 10, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 101820 | |||||
Zoning/use permit Date: March 22, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 63731 | |||||
Demolition permit Date: March 22, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 63732 | |||||
New construction permit Date: August 30, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 65421 | |||||
Mechanical permit Date: August 15, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 96428 | |||||
Administrative permit Date: September 14, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 102991 | |||||
Electrical permit Date: September 6, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 101204 | |||||
Permit for the complete demolition of the existing structure on the lot and for the erection of a three (3) story detached structure with a cellar, max height not to exceed 35 ft. For use as a single family dwelling, with an interior accessory garage. Date: August 17, 2007 Client: Jones Donald C Argentina Leigh Allison | Applicant: Donald C. Jones | Permit type: Appeal | Permit status: Granted | Permit id: 3105 | |||||
New construction permit Date: August 30, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 65421 | |||||
Mechanical permit Date: August 15, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 96428 | |||||
Zoning use permit Date: March 22, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 63731 | |||||
Electrical permit Date: September 6, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 101204 | |||||
Administrative permit Date: September 14, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 102991 | |||||
Plumbing permit Date: September 10, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 101820 | |||||
Demolition permit Date: March 22, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit status: Completed | Permit id: 63732 | |||||
Permit for the complete demolition of the existing structure on the lot and for the erection of a three (3) story detached structure with a cellar, max height not to exceed 35 ft. For use as a single family dwelling, with an interior accessory garage. Date: August 17, 2007 Client: Jones Donald C Argentina Leigh Allison | Applicant: Donald C. Jones | Permit type: Appeal | Permit status: Granted | Permit id: 3105 | |||||
SCORE 100 Complete demolition of residence Date: March 22, 2007 Contractor: J F Huebner And Son Inc Client: Jones Donald C Argentina Leigh Allison | Permit type: Demolition permit | Permit status: Completed | Completion date: June 11, 2013 | Permit id: 63732 | |||||
SCORE 100 Install new trane hvac unit. Date: August 15, 2007 Contractor: Abraham Flitter Client: Jones Donald C Argentina Leigh Allison | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 26, 2007 | Permit id: 96428 | |||||
SCORE 100 1st floor: 1 water closet, 1 lav, 1 kitchen sink 2nd floor: 2 water closets, 4 lavs, 1 bath tub, 1 shower, washing machine. Storm is existing. Date: September 10, 2007 Contractor: Double A Service Co Client: Jones Donald C Argentina Leigh Allison | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 31, 2008 | Permit id: 101820 | |||||
Complete demolition of existing structure and new construction of detached single family dwelling with interior garage on existing foundations Date: August 30, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit type: New construction permit | Permit status: Completed | Completion date: November 30, 2007 | Permit id: 65421 | |||||
SCORE 100 Complete demolition. Vacant lot Date: March 22, 2007 Contractor: J F Huebner And Son Inc Client: Jones Donald C Argentina Leigh Allison | Permit type: Zoning/use permit | Permit status: Completed | Completion date: January 31, 2014 | Permit id: 63731 | |||||
SCORE 100 2 amp service, 1 gas heater, 1 condensing unit, 1 water heater, 1 range hood microwave, 1 dishwasher, 1 garbage disposal, 1 washing machine, 1 gas dryer, 1 doorbell, 5 telephone outlets 7 tv outlets, 38 lights, 59 outlets, 34 switches, 7 smoke detectors, 3 exhaust fans.(east dist) Date: September 6, 2007 Contractor: Sunlight Electrical Client: Jones Donald C Argentina Leigh Allison | Permit type: Electrical permit | Permit status: Completed | Completion date: May 19, 2011 | Permit id: 101204 | |||||
Amend permit #65421 to reflect interior floor plan revisions @ 1st floor (relocate kitchen and powder room, and change window locations as shown on revised floor plan. Date: September 14, 2007 Client: Jones Donald C Argentina Leigh Allison | Permit type: Administrative permit | Permit status: Completed | Completion date: September 26, 2007 | Permit id: 102991 |