Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Replacement forced air furnace Date: November 23, 2009 Contractor: Kappler Mechanical And Electrical Inc Client: Andrew Startzenbach,Hannah Startzenbach | Applicant: Kappler Mechanical & Electrical Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 9, 2012 | Current use: Single family d | |||||
SCORE 95 Second time basement remodel to eliminate a second kitchen (in response to cpl2014-00572). Scope of remodel includes work other than elimination of second kitchen to include eps, drywall, insullation repair, structural work for 3 egress windows, and creating an open passage from the non-conforming bedroom into the family room to create an office space. The total square footage of remodel is 250. Client: S 465.0 | Applicant: Vermilion Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 3, 2015 | Current use: Single family d | |||||
SCORE 95 Replacement forced air furnace Client: Andrew Startzenbach | Permit type: Mechanical | Permit status: Cmp | Completion date: February 9, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-20251 | |||||
SCORE 95 Second time basement remodel to eliminate a second kitchen (in response to cpl2014-00572). Scope of remodel includes work other than elimination of second kitchen to include eps, drywall, insullation repair, structural work for 3 egress windows, and creating an open passage from the non-conforming bedroom into the family room to create an office space. The total square footage of remodel is 250. Client: S | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: March 3, 2015 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2015-00336 |