Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
420sf addition (to include m. B., new walk-in-closet, and new bathroom. ) misc. (epm) Date: November 13, 2015 Value: $56,842 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 5, 2016 | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 29, 2016 Contractor: Solarcity Corporation Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 88 If a re-roof project is proposed, the following specifications apply. Existing roofing material proposed roofing material manufacturer brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: February 13, 2017 Permit status: Pass | Permit id: Pds2017-Resalt- | |||||
Final Date: March 31, 2016 Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Foundation/steel/holdowns/abs/1st Date: December 17, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |