Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
No plans required. Double fee - work completed w/o disaster assessment inspection report, permit & inspections. Belfor took out work back to damage condition. Tom gage meeting felix at 1: 10/29 to look at condition. Tom gage advised that since they took it back to the damage state, no letters and no double fee required. Rac Date: October 29, 2013 Permit type: Disaster repair | |||||
SCORE 95 3e_028_fire Permit type: Disaster | |||||
SCORE 96 Electrical | |||||
No plans required. Double fee - work completed w o disaster assessment inspection report, permit & inspections. Belfor took out work back to damage condition. Tom gage meeting felix at 1: 10 29 to look at condition. Tom gage advised that since they took it back to the damage state, no letters and no double fee required. Rac Date: October 29, 2013 Permit type: Disaster repair | Permit id: 236104 | |||||
SCORE 96 Electrical | |||||
SCORE 95 3e_028_fire Permit type: Disaster |