Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: April 30, 2010 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 276378 | |||||
Zoning permit Date: March 10, 2011 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 324416 | |||||
Electrical permit Date: July 15, 2010 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 291202 | |||||
Plumbing permit Date: July 27, 2010 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 293109 | |||||
Mechanical permit Date: August 12, 2010 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 296082 | |||||
The property is leased to three persons. Owners inspection of the premises disclosed that only three persons reside at the premises. This use does not violate the city code. Date: January 26, 2015 Client: Muto Joseph Sautner Sherri A | Applicant: William Obrien | Permit type: Appeal | Permit status: Affirmed | Permit id: 24478 | |||||
Alteration permit Date: April 30, 2010 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 276378 | |||||
Mechanical permit Date: August 12, 2010 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 296082 | |||||
Plumbing permit Date: July 27, 2010 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 293109 | |||||
Zoning permit Date: March 10, 2011 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 324416 | |||||
Electrical permit Date: July 15, 2010 Client: Muto Joseph Sautner Sherri A | Permit status: Completed | Permit id: 291202 | |||||
The property is leased to three persons. Owners inspection of the premises disclosed that only three persons reside at the premises. This use does not violate the city code. Date: January 26, 2015 Client: Muto Joseph Sautner Sherri A | Applicant: William Obrien | Permit type: Appeal | Permit status: Affirmed | Permit id: 24478 | |||||
SCORE 67 Interior demolition of walls,ceilings and floors; frame. Insulate, and sheetrock where required; new kitchen and bath; stucco entire exterior. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated february 2007. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Date: April 30, 2010 Contractor: Eft Concepts Client: Muto Joseph Sautner Sherri A | Permit type: Alteration permit | Permit status: Completed | Completion date: May 6, 2011 | Permit id: 276378 | |||||
SCORE 89 2 amp service load, circuit, (40) 1 volt receptacles, (7) gfi receptacles, breaker panel, (40) ceiling lights, (20) wall switches, (2) exhaust fans, (1) garbage disposal, (4) outside lights,(1) 2 volt, amp circuit as per 2008 nec (north dist) Date: July 15, 2010 Contractor: Hooks Earl Client: Muto Joseph Sautner Sherri A | Permit type: Electrical permit | Permit status: Completed | Completion date: May 25, 2011 | Permit id: 291202 | |||||
SCORE 100 Install 1 hvac unit (sfd) Date: August 12, 2010 Contractor: Anthony S. Rachuba Jr Client: Muto Joseph Sautner Sherri A | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 6, 2011 | Permit id: 296082 | |||||
SCORE 100 Installation of 2 water closets, 2 lavs,1 shower, 1 bathtub,1 kitchen sink. Replace 1 water closet, 1 lav. (north dist) Date: July 27, 2010 Contractor: Alexander Burik Client: Muto Joseph Sautner Sherri A | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 6, 2011 | Permit id: 293109 | |||||
SCORE 67 Expand a existing driveway for sfd. Date: March 10, 2011 Contractor: Eft Concepts Client: Muto Joseph Sautner Sherri A | Permit type: Zoning permit | Permit status: Completed | Completion date: March 10, 2011 | Permit id: 324416 |