Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 92 Comp shingles remove existing 24 sg ft roof down to sheathing. Prepare existing sheathing for new roof. Install gaf lifetime hd shingles as final layer. And foam roof prepare existing 31 sq ft surface to receive new roofing system. Apply 1 1 2"spf with silicone coating. Permit type: Non-residential addition-alteration | Permit status: Issued | Current use: Non-residential | Permit id: B17-2293 | Parcel: 009023001 | |||||
SCORE 69 Replace 7 rooftop package units (heat pump), like-for-like. Replace 2 ptac wall units. Over the counter design review per andrew trippel. Date: June 22, 2017 Contractor: Kelly Plumbing And Heating Inc Permit type: Non-residential mechanical | Permit status: Issued | Current use: Non-residential | Permit id: B17-2561 | Parcel: 009023002 |