Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Use as a three(3) dwelling units in an existing two story structure. Date: February 27, 2017 Contractor: Pelicans Construction Go Client: Guan Bihong Zhu Chenghui | Permit type: Use permit | Permit status: Completed | Completion date: February 27, 2017 | Permit id: 758251 | |||||
SCORE 100 Seal lateral pa20172340902 remove house trap and hermetically sealing the lateral by a cap or plug per section p-606. 1 of the philadelphia plumbing code 2004 - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: August 22, 2017 Contractor: Superior Build Maintenance Client: Guan Bihong Zhu Chenghui | Permit type: Plumbing permit | Permit status: Active | Completion date: September 14, 2017 | Permit id: 810435 | |||||
SCORE 100 For erection of third floor addition above the existing second floor of an existing attached structure. Size and location as shown on the application. Use as multi-family household living three (3) dwelling unit as previously approved. Date: August 15, 2017 Contractor: Pelicans Construction Go Client: Guan Bihong Zhu Chenghui | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 805642 | |||||
SCORE 100 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 31, 2017 Contractor: Pelicans Construction Go Client: Guan Bihong Zhu Chenghui | Permit type: Demolition permit | Permit status: Active | Completion date: September 14, 2017 | Permit id: 813088 | |||||
Level iii alterations to include third floor addition with a complete change of occupancy to create a three (3) family dwelling as per approved plans. Building to be sprinklered throughout with nfpa 13 system. No more than 2 3 of floor joists can be removed. Separate permits required for mep & fire suppression work Date: December 12, 2017 Client: Guan Bihong Zhu Chenghui | Permit type: Addition permit | Permit status: Active | Completion date: December 12, 2017 | Permit id: 831405 |