Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Elevator Date: April 7, 2016 Contractor: Aung Win Permit status: Issued | Current use: Commercial | Permit id: 16046-90000-004 | |||||
SCORE 89 Re-fireproofing with retro guard rg by w. R. Grace to steel beams and u Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-164 | |||||
Change of use from masonic lodge to non-profit museum and tenant impro Date: July 10, 2015 Value: $800,000 Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10000-134 | |||||
SCORE 89 Installation of fire sprinklers, preaction system, and manual wet sta Date: April 21, 2016 Contractor: Michael Mercado Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 16043-10000-010 | |||||
SCORE 89 Fire sprinkler Date: March 8, 2016 Contractor: Michael Mercado Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-90000-010 | |||||
Proposed concrete pads on roof for future installation of fall arrest Date: September 29, 2015 Value: $25,000 Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10000-176 | |||||
SCORE 59 Roof replacement on (e) 4-story type 1a, building. See comments. Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10000-240 | |||||
SCORE 89 Re-spray fireproofing on 1st floor steel framing members. See comment Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-157 | |||||
SCORE 77 Electrical Date: April 11, 2016 Contractor: Frances Maxfield Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-125 | |||||
SCORE 59 Change of use from masonic lodge to non-profit museum and tenant impro Date: January 19, 2016 Contractor: George Cosmas Permit type: Plumbing | Permit status: Issued | Current use: Commercial | Permit id: 15042-10000-125 | |||||
SCORE 59 Re-spray of fireproofing to the structural steel beams and underside o Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10000-254 | |||||
SCORE 77 Change of use from masonic lodge to non-profit museum. Ti to existing Date: January 21, 2016 Contractor: Frances Maxfield Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-194 | |||||
Re-roofing: replacing sublayer (waterproofing) and return/reinstall ( Date: September 6, 2013 Value: $400,000 Permit type: Bldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 13016-10000-176 | |||||
SCORE 89 Re-spray fireproofing on roof framing members. See comments. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-164 | |||||
SCORE 93 Electrical Date: March 25, 2016 Contractor: Gabriel Juarez Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-105 | |||||
SCORE 71 New hvac to (e) 3 story building with basement garage level. Changed Date: December 11, 2015 Contractor: Ramiro Aguirre Permit type: Hvac | Permit status: Issued | Current use: Commercial | Permit id: 15044-10000-069 | |||||
SCORE 82 Addition of sprinkler system in parking garage to be fed from existing Date: May 17, 2016 Contractor: Adrianna Garcia Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 16043-10000-022 | |||||
SCORE 93 Electrical Date: May 17, 2016 Contractor: Lauren Ebalo Permit status: Issued | Current use: Commercial | Permit id: 16041-90000-173 | |||||
SCORE 86 Install two new roped hydraulic elevators. Date: May 5, 2016 Contractor: Aung Win Permit type: Elevator | Permit status: Issued | Current use: Commercial | Permit id: 16046-10000-005 | |||||
SCORE 93 Pc for a new fire alarm system to an existing museum. Scope includes 1 Date: May 10, 2016 Contractor: Gabriel Juarez Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-104 | |||||
SCORE 95 Change of use from masonic lodge to non-profit museum and tenant impro Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10000-134 | |||||
SCORE 64 Supplemental permit to 14016-10000-13466 to repair penetrations in 2-h Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10002-134 | |||||
SCORE 86 Installation of one wheelchair lift for a commercial building. Date: August 26, 2016 Contractor: Jason Flores Permit type: Elevator | Permit status: Issued | Current use: Commercial | Permit id: 16046-10000-009 | |||||
SCORE 86 Installation of (1) cabled electric elevator Date: August 15, 2016 Contractor: Aung Win Permit type: Elevator | Permit status: Issued | Current use: Commercial | Permit id: 16046-10000-008 | |||||
SCORE 64 Supplemental permit to 14016-10000-13466 to revise exit layout of the Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10003-134 | |||||
SCORE 71 Ventilation system for electrical vault and revisions to duct distribu Date: December 21, 2016 Contractor: Ramiro Aguirre Permit type: Hvac | Permit status: Issued | Current use: Commercial | Permit id: 15044-10001-069 | |||||
SCORE 76 Proposed concrete pads on roof for future installation of fall arrest Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10000-176 | |||||
SCORE 89 Fireproofing re-spray with retroguard. Rg by w. R. Grace to the structu Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-172 | |||||
SCORE 59 Electrical Date: December 23, 2016 Contractor: Ryan Verharst Permit status: Issued | Current use: Commercial | Permit id: 15041-10001-194 | |||||
SCORE 100 Re-roofing: replacing sublayer (waterproofing) and return/reinstall ( Permit type: Bldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 13016-10000-176 | |||||
SCORE 96 Replacement of duplex sewage ejectors (se3, se4) and adding 2 hub dr Date: December 28, 2016 Contractor: Ghassan Shreim Permit type: Plumbing | Permit status: Issued | Current use: Commercial | Permit id: 16042-10000-279 | |||||
SCORE 87 Supplemental permit to 14016-10003-13466 for exiting revisions to the Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10004-134 | |||||
SCORE 100 Install two new wall signs: 4 x 4 illuminated Permit status: Issued | Current use: Onsite | Permit id: 17048-20000-013 | |||||
SCORE 59 Date: December 23, 2016 Contractor: Ryan Verharst Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10001-194 | |||||
SCORE 86 Install two new roped hydraulic elevators. Date: May 5, 2016 Contractor: Aung Win Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-005 | |||||
SCORE 71 Ventilation system for electrical vault and revisions to duct distribu Date: December 21, 2016 Contractor: Ramiro Aguirre Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-10001-069 | |||||
SCORE 59 T. I. - branch off existing 6" standpipe with 4" pipe to supply new 2-1 Date: February 2, 2017 Contractor: Adreanna Garcia Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-10001-010 | |||||
SCORE 86 Installation of (1) cabled electric elevator Date: August 15, 2016 Contractor: Aung Win Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-008 | |||||
SCORE 86 Date: February 16, 2017 Contractor: Aung Win Permit status: Issued | Current use: Commercial | Permit id: 17046-90000-003 | |||||
SCORE 89 Date: March 31, 2016 Contractor: Michael Mercado Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-90000-014 | |||||
SCORE 86 Date: April 7, 2016 Contractor: Aung Win Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-90000-004 | |||||
SCORE 100 Re-roofing: replacing sublayer (waterproofing) and return reinstall ( Permit status: Permit expired | Current use: Commercial | Permit id: 13016-10000-176 | |||||
SCORE 59 Change of use from masonic lodge to non-profit museum and tenant impro Date: January 19, 2016 Contractor: George Cosmas Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-125 | |||||
SCORE 89 Re-spray fireproofing on roof framing members. See comments. Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-164 | |||||
SCORE 89 Installation of fire sprinklers, preaction system, and manual wet sta Date: April 21, 2016 Contractor: Michael Mercado Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-10000-010 | |||||
SCORE 61 Supplemental permit to 14016-10000-13466 to restripe existing ground a Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10006-134 | |||||
SCORE 71 New hvac to (e) 3 story building with basement garage level. Changed Date: December 11, 2015 Contractor: Ramiro Aguirre Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-10000-069 | |||||
SCORE 96 Replacement of duplex sewage ejectors (se3, se4) and adding 2 hub dr Date: December 28, 2016 Contractor: Ghassan Shreim Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-10000-279 | |||||
SCORE 89 Re-fireproofing with retro guard rg by w. R. Grace to steel beams and u Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-164 | |||||
SCORE 77 Date: April 11, 2016 Contractor: Frances Maxfield Permit status: Permit closed | Current use: Commercial | Permit id: 16041-10000-125 | |||||
SCORE 61 Supplemental permit to 14016-10000-13466 for deferred submittal of gla Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10007-134 | |||||
SCORE 59 Roof replacement on (e) 4-story type 1a, building. See comments. Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-240 | |||||
SCORE 64 Supplemental permit to 14016-10000-13466 to repair penetrations in 2-h Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10002-134 | |||||
SCORE 64 Supplemental permit to 14016-10000-13466 to revise exit layout of the Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10003-134 | |||||
SCORE 61 Supplemental permit to 14016-10004-13466 for exiting revisions to the Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10005-134 | |||||
SCORE 93 Date: May 17, 2016 Contractor: Lauren Ebalo Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-90000-173 | |||||
SCORE 95 Change of use from masonic lodge to non-profit museum and tenant impro Permit status: Cofo issued | Current use: Commercial | Permit id: 14016-10000-134 | |||||
SCORE 93 Date: March 25, 2016 Contractor: Gabriel Juarez Permit status: Permit closed | Current use: Commercial | Permit id: 16041-10000-105 | |||||
SCORE 89 Re-spray fireproofing on 1st floor steel framing members. See comment Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-157 | |||||
SCORE 95 Date: February 13, 2017 Contractor: Cosco Fire Protection Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 17041-10000-046 | |||||
SCORE 59 Re-spray of fireproofing to the structural steel beams and underside o Permit status: Permit closed | Current use: Commercial | Permit id: 14016-10000-254 | |||||
SCORE 76 Proposed concrete pads on roof for future installation of fall arrest Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-176 | |||||
SCORE 93 Date: March 2, 2017 Contractor: Elevator And Escalator Division Permit status: Permit finaled | Current use: Commercial | Permit id: 17046-10000-003 | |||||
SCORE 77 Change of use from masonic lodge to non-profit museum. Ti to existing Date: January 21, 2016 Contractor: Frances Maxfield Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-194 | |||||
SCORE 89 Fireproofing re-spray with retroguard. Rg by w. R. Grace to the structu Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-172 | |||||
SCORE 82 Addition of sprinkler system in parking garage to be fed from existing Date: May 17, 2016 Contractor: Adrianna Garcia Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-10000-022 | |||||
SCORE 93 Pc for a new fire alarm system to an existing museum. Scope includes 1 Date: May 10, 2016 Contractor: Gabriel Juarez Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-104 | |||||
SCORE 87 Supplemental permit to 14016-10003-13466 for exiting revisions to the Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10004-134 | |||||
SCORE 86 Installation of one wheelchair lift for a commercial building. Date: August 26, 2016 Contractor: Jason Flores Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-10000-009 | |||||
SCORE 91 Date: February 1, 2017 Contractor: Richard Herrera Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10001-125 |