Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Roof mount residential solar pv for existing sfd 10-05-16 plan change no panel upgrade... Tlh the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 12, 2016 Contractor: Semper Solaris Construction Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 17, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: October 12, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd 10-05-16 plan change no panel upgrade... Tlh the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 12, 2016 Contractor: Semper Solaris Construction Inc Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2016-Resalt- |