Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Electrical Date: March 3, 2016 Contractor: Ralph Threatt Client: Julio C Sala | Permit status: Completed | Permit id: E1604306 | |||||
SCORE 96 Plumbing and gas Date: March 10, 2016 Contractor: Brian Dennis Client: Julio C Sala | Permit status: Completed | Permit id: P1604323 | |||||
SCORE 100 Electrical Date: March 3, 2016 Contractor: Ralph Threatt Client: Julio C Sala | Permit status: Completed | Permit id: E1604306 | |||||
SCORE 96 Plumbing and gas Date: March 10, 2016 Contractor: Brian Dennis Client: Julio C Sala | Permit status: Completed | Permit id: P1604323 | |||||
SCORE 67 Remove load beaing and non load bearing walls. Reinforce and convert the existing covered porch into a mud room using existing supports. Installing new master bath and mud room. Install new kitchen Date: March 2, 2016 Contractor: On The Level Contracting And Trucki Client: Elizondo Maria | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1604633 | |||||
SCORE 100 Electrical Date: March 3, 2016 Contractor: Ralph Threatt Client: Julio C Sala | Permit status: Completed | Permit id: E1604306 | |||||
SCORE 96 Plumbing and gas Date: March 10, 2016 Contractor: Brian Dennis Client: Julio C Sala | Permit status: Completed | Permit id: P1604323 |