Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Oti-2 17th l - el me Current use: Office | Permit id: 200312041581 | |||||
SCORE 89 Oti-1 17th l = el, me,ls, sp Current use: Office | Permit id: 200312041587 | |||||
SCORE 86 Add new 22 main w 1 4 outlets-install sprinklers for portion of 17th floor, add 23 heads in mec Current use: Office | Permit id: 200312172484 | |||||
SCORE 89 Upgrade the 7th flr to the new life safety system. Current use: Office | Permit id: 200312232890 | |||||
SCORE 89 Upgrade the 14th fl to the new life safety system Current use: Office | Permit id: 200312232893 | |||||
SCORE 89 Upgrade the 31st fl to the new life safety system Current use: Office | Permit id: 200312232895 | |||||
SCORE 89 Upgrade the 33rd fl to the new life safety system Current use: Office | Permit id: 200312232896 | |||||
SCORE 100 To renew app#2002 01 29 7996 for final inspection. Current use: Office | Permit id: 200401063429 | |||||
SCORE 100 Revision to app#2003 10 21 8044 oti-2. Replace sheet 27m w revised sheet 18m-1. Current use: Office | Permit id: 200401063432 | |||||
SCORE 100 27 f- structural work to br performed,ref. To oti#200310218049 w ada fully comply Current use: Office | Permit id: 200401154171 | |||||
SCORE 89 Oti-1 20 f el me ls sp Current use: Office | Permit id: 200408171730 | |||||
SCORE 100 Provide tenant fire protection work on 37th fl. Current use: Office | Permit id: 200407280029 | |||||
Oti-2 5th floor el, me ![]() ![]() Current use: Office | Permit id: 200408040661 | |||||
SCORE 100 Fire sprinkler system 34th floor Current use: Office | Permit id: 200409103753 | |||||
SCORE 100 Build-out unsprinkler spaces. Mech rooms - additional speakers - b1 & b2. Current use: Office | Permit id: 200409103863 | |||||
SCORE 99 Oti-3 4 f ls only Current use: Office | Permit id: 200410257567 | |||||
SCORE 99 Oti-3 5 f ls only Current use: Office | Permit id: 200410257569 | |||||
SCORE 89 Oti-1, (ground floor), me, ls, sp, el Current use: Office | Permit id: 200410066107 | |||||
SCORE 89 Oti-2 20 f el me Current use: Office | Permit id: 200408171728 | |||||
SCORE 89 Oti-2, (ground floor) , el, me, ls Current use: Office | Permit id: 200410066103 | |||||
SCORE 89 Oti-3, 20th floor, sp only Current use: Office | Permit id: 200410277783 | |||||
Oti-2, 4th floor, el, me ![]() ![]() Current use: Office | Permit id: 200408040663 | |||||
SCORE 100 New looped cross main build back. Current use: Office | Permit id: 200409164386 | |||||
SCORE 100 Full floor of fire alarm system. New devices for full floor to tie into existing building fa system Current use: Office | Permit id: 200411048592 | |||||
SCORE 100 New looped cross main build back. (5th fl) Current use: Office | Permit id: 200409164388 | |||||
SCORE 100 Existing sprinkler system expansion 11 new sprinklers (stair, mech. Room. & temporary storage) Current use: Office | Permit id: 200412151506 | |||||
SCORE 89 Upgrade the 30th floor to the new life safety syste. Current use: Office | Permit id: 200412211854 | |||||
SCORE 89 Upgrade the 29th floor to the new life safety system. Current use: Office | Permit id: 200412211859 | |||||
SCORE 99 Oti-1 5 f el me ls sp ![]() ![]() Current use: Office | Permit id: 200412221980 | |||||
SCORE 94 Deomolition of all interior partitions finishes and ceiling add demolition at shafts and perimeter Current use: Office | Permit id: 200412151474 | |||||
SCORE 89 Upgrade the 8th floor to the new life safety system. Current use: Office | Permit id: 200412211858 | |||||
SCORE 89 Upgarde 28 f to new life safety system Current use: Office | Permit id: 200412211852 | |||||
SCORE 99 Oti-1 4 f el me ls sp ![]() ![]() Current use: Office | Permit id: 200412221976 | |||||
SCORE 100 Oti-3, 34th floor, ls. Current use: Office | Permit id: 200412060713 | |||||
SCORE 100 Oti-1, 24th floor, el, me, ls, sp Current use: Office | Permit id: 200312303186 | |||||
SCORE 100 Oti-2, el, me, 24th floor Current use: Office | Permit id: 200312303187 | |||||
SCORE 89 Oti-3 17th floor sp Current use: Office | Permit id: 200402106089 | |||||
SCORE 100 Oti-1 32nd fl. El, me, ls Current use: Office | Permit id: 200402136353 | |||||
SCORE 100 Oti-2 32nd fl. El, me Current use: Office | Permit id: 200402136356 | |||||
SCORE 100 Oti-2, el, me, 20th floor Current use: Office | Permit id: 200404050423 | |||||
SCORE 100 Oti-1 revised 32 f el me ls sp Current use: Office | Permit id: 200404080778 | |||||
SCORE 100 Oti-2 revision, el only Current use: Office | Permit id: 200404080802 | |||||
SCORE 100 24 fl-install main sprinkler loop coverage to be complete during future t. I. Current use: Office | Permit id: 200404262277 | |||||
SCORE 89 Upgrade to the life safety system on the 17th floor. Current use: Office | Permit id: 200403128448 | |||||
SCORE 89 Upgrade to the life safety system on the 32nd floor. Current use: Office | Permit id: 200403128449 | |||||
SCORE 100 Oti-1 20th floor el me ls sp Current use: Office | Permit id: 200403239355 | |||||
SCORE 100 Demo work on 34th floor. Demo as per ab017-sfbc. Current use: Office | Permit id: 200405133775 | |||||
SCORE 100 24 f- life safety work in preparation for future buildout ![]() ![]() Current use: Office | Permit id: 200405244637 | |||||
SCORE 94 Oti-1 office tenant improvement alterations and restroom upgrade per 20% requirt Current use: Office | Permit id: 200406085847 | |||||
SCORE 100 Oti-1, 34th floor, el, me, ls, sp. ![]() ![]() Current use: Office | Permit id: 200406186796 | |||||
SCORE 100 Provide tenant fire protection work 9th floor 2 new, 1 relocate Current use: Office | Permit id: 200406216901 | |||||
SCORE 100 Oti-2, 34th floor, el, me ![]() ![]() Current use: Office | Permit id: 200406227048 | |||||
SCORE 100 Oti-1 rv ls sp 27 f Current use: Office | Permit id: 200406237159 | |||||
SCORE 100 Oti-3 at 20th fl, ls,sp Current use: Office | Permit id: 200406247258 | |||||
Oti-2 9 f el ![]() ![]() Current use: Office | Permit id: 200406297636 | |||||
SCORE 100 24 f- life safety work in preparation for future buildout Current use: Office | Permit id: 200405244637 | |||||
Strengthen floor for high density files & stair opening, disabled access shown on oti 200406186796 ![]() ![]() Current use: Office | Permit id: 200407138721 | |||||
Oti-1, 4th floor, el, me, ls, sp ![]() ![]() Current use: Office | Permit id: 200408040659 | |||||
Oti-1 5 f el, me, ls, sp ![]() ![]() Current use: Office | Permit id: 200408040660 | |||||
SCORE 100 Construction of tenant convenience stair between 33rd and 34 f slab openings to accommodate ![]() ![]() Current use: Office | Permit id: 200408060860 | |||||
SCORE 100 8 sprinkler heads to be relocated. No incresae in office space @ 27th floor only. Current use: Office | Permit id: 200408121373 | |||||
SCORE 89 Oti-2 20 f el me ![]() ![]() Current use: Office | Permit id: 200408171728 | |||||
SCORE 89 Oti-1 20 f el me ls sp ![]() ![]() Current use: Office | Permit id: 200408171730 | |||||
SCORE 100 Provide tenant fire protection. ![]() ![]() Current use: Office | Permit id: 200408171731 | |||||
SCORE 89 Upgrade the 9th floor to the new life safety system Current use: Office | Permit id: 200408242321 | |||||
SCORE 100 Renew of app#200401154171 tio complet the work. Current use: Office | Permit id: 200408252466 | |||||
SCORE 100 Oti-1, 34th floor, el, me, ls, sp. Current use: Office | Permit id: 200406186796 | |||||
SCORE 100 Oti-2, 34th floor, el, me Current use: Office | Permit id: 200406227048 | |||||
SCORE 100 Rev#200403239355. To elimate plan check requirement to reverse door swing @ stair#2. Firemains vesti Current use: Office | Permit id: 200409083616 | |||||
SCORE 100 Oti-1, 33rd floor, el, me,ls, sp. Current use: Office | Permit id: 200409103878 | |||||
SCORE 100 New looped cross main build back. ![]() ![]() Current use: Office | Permit id: 200409164386 | |||||
SCORE 100 Minor mechanical & electrical alteration to 33rd floor. Current use: Office | Permit id: 200409103881 | |||||
SCORE 100 New looped cross main build back. (5th fl) ![]() ![]() Current use: Office | Permit id: 200409164388 | |||||
SCORE 100 Life safety work Current use: Office | Permit id: 200409023201 | |||||
SCORE 100 34 f- fire alarm system upgrade ![]() ![]() Current use: Office | Permit id: 200409093678 | |||||
Oti-2 4th floor el me ![]() ![]() Current use: Office | Permit id: 200501183362 | |||||
SCORE 98 Oti-2 5th fl-el,me. Current use: Office | Permit id: 200501183355 | |||||
SCORE 98 Oti-1 4 f el me ls sp Current use: Office | Permit id: 200412221976 | |||||
SCORE 100 Structural work on 24 & 26 f in association with oti-1 appl#20052071878 see oti-1 drawing for Current use: Office | Permit id: #200507268585 | |||||
SCORE 100 Fire alarm work on 25th floor including 36 strobes 54 speakers 2 soke det and 2 duct smoke det. Current use: Office | Permit id: #200510044705 | |||||
SCORE 100 Fire alarm work on floor 26 including 45 strobes 69 speakers 5 smoke det & 5 duct smoke det. Current use: Office | Permit id: #200510044708 | |||||
SCORE 100 Oti-2 7th floor=el me sp medhanical electrical & sprinkler Current use: Office | Permit id: #200510075101 | |||||
SCORE 100 T. I. (e)sprinkler system new lines new sprinklers 2 (2)=540. Current use: Office | Permit id: #200510206055 | |||||
SCORE 100 As-build-expansion extg fire spkr system added 3rd floor sprnkr to scope 25th removed from scope original old app #200504271012 Current use: Office | Permit id: #200510256486 | |||||
SCORE 100 Life safety work on floor 24 including 2 smoke detectors 1 duct smoke detector speakers and 58 Current use: Office | Permit id: #200509223620 | |||||
SCORE 98 Renew pa#200504069324 for final insp. Current use: Office | Permit id: #200511147948 | |||||
SCORE 89 10th floor- upgrade for the 10th floor to new life safety system on the 10th floor Current use: Office | Permit id: #200511147994 | |||||
SCORE 100 Add 1 fsd fire smoke damper one duct detector Current use: Office | Permit id: #200511228780 | |||||
SCORE 100 Revise permit no 200507208585- delete from the special inspection & structural observation the following- fillet welds; metal dock; ndt; fire proofing; bolts in existing concrete; and pull torque testing Current use: Office | Permit id: #200511309172 | |||||
SCORE 89 Installation of (2) tamper flow switches at roof top level. Current use: Office | Permit id: #200512291213 | |||||
SCORE 98 Oti-1 5 f el me ls sp Current use: Office | Permit id: 200412221980 | |||||
SCORE 100 Oti-3, 33rd floor, sp. Current use: Office | Permit id: 200502246141 | |||||
SCORE 98 Oti-2 4th floor el me Current use: Office | Permit id: 200501183362 | |||||
SCORE 94 Demo of all teneant partitions, ceiling finishes, hvac, sprinklers,etc., to perform acm abatement. ![]() ![]() Current use: Office | Permit id: 200502185842 | |||||
SCORE 100 Oti-3 33rd floor sp. Current use: Office | Permit id: #200502246141 | |||||
SCORE 100 Oti-4 33rd floor ls. Current use: Office | Permit id: #200503016473 | |||||
SCORE 89 Upgrade 4th & 5th floor to the new life safety system. Current use: Office | Permit id: #200503016490 | |||||
SCORE 96 Install new branch line and sprinkler head coverage on 4th & 5th floors per approved plan. Sprinkler Current use: Office | Permit id: #200503026605 | |||||
SCORE 99 Life safety work only. ![]() ![]() Current use: Office | Permit id: #200503086965 | |||||
SCORE 99 Life safety work only. Current use: Office | Permit id: #200503086968 | |||||
SCORE 100 Revision to 200404262277 to show as built condition Current use: Office | Permit id: #200503107224 | |||||
SCORE 100 Renewal of permit application 200404262277 for final inpsection only Current use: Office | Permit id: #200503107238 | |||||
SCORE 98 Oti-1 6th fl-el me ls sp. Current use: Office | Permit id: #200503117285 | |||||
SCORE 98 Oti-2 6th floor el me Current use: Office | Permit id: #200503167674 | |||||
SCORE 99 Erect ground electric double faced sign Current use: Office | Permit id: #200503258405 | |||||
SCORE 89 Add 3 server racks to (e) space mech. Electrical data work. No sprinkler or lighting affected. Current use: Office | Permit id: #200503318899 | |||||
SCORE 98 Oti-1 6th floor me. Architectural changes. Current use: Office | Permit id: #200504069324 | |||||
SCORE 96 Modify exidting sprinklet system on 6th floor for new service tray and 2 new offices add 1 new head Current use: Office | Permit id: #200504129755 | |||||
SCORE 100 New 2 1 2 looped main w welded outlets core spkrs 42 fl 126 hds total exist value assemblies. Current use: Office | Permit id: #200504139919 | |||||
SCORE 100 Add two new duct detectors to tie into existing floor fire alarm system Current use: Office | Permit id: #200504210543 | |||||
SCORE 89 Provide an additional 12 cabinets to the (e) recently constructed lan-room. Provide additional power Current use: Office | Permit id: #200504220724 | |||||
SCORE 100 Infill mech elect tel rooms tenant improvement extg fire sprklr system 92 spkrs 92 sq ft Current use: Office | Permit id: #200504271012 | |||||
SCORE 89 Oti 2 (21st fl) el me Current use: Office | Permit id: #200504281115 | |||||
SCORE 89 Oti-1 (21st fl.) el me ls sp Current use: Office | Permit id: #200504281121 | |||||
SCORE 94 26 fl - demo all teneant partitions ceiling finishes hvac sprinklers etc. To perform acm abatement. Current use: Office | Permit id: #200502185842 | |||||
SCORE 89 Upgrade the new life safety system. Metro# 21861m Current use: Office | Permit id: #200506074401 | |||||
SCORE 89 Upgrade the new life safety system. Metro# 21858m Current use: Office | Permit id: #200506074403 | |||||
SCORE 100 Full floor it of fire alarm system. New devices for full fl. To tie into (e) building fire alarm sys Current use: Office | Permit id: #200506155153 | |||||
SCORE 99 Addition of one non-accessible toilet and minor reconfiguration Current use: Office | Permit id: #200506215628 | |||||
SCORE 89 As built showing additional devices for 4th 5th. 1-smoke detector 1-duct detector & 1-speaker........ Permit id: #200506225789 | |||||
SCORE 89 Upgrade the 6th floor to the new life safety system by request by the marshall. 3-duct detectors. Current use: Office | Permit id: #200506225794 | |||||
SCORE 100 Fire sprinkler as built as requested by insp glen alston. Rev. 200409103753. Current use: Office | Permit id: #200505031422 | |||||
SCORE 100 Existing spkr system buildout 202 new spkrs no increase 200sf Current use: Office | Permit id: #200507087221 | |||||
SCORE 100 Oti -1 el me ls sp (24th fl) Current use: Office | Permit id: #200507187850 | |||||
SCORE 100 Oti-1 25th floor el me ls sp. Current use: Office | Permit id: #200507187857 | |||||
SCORE 100 Oti-2 26 fl el me Current use: Office | Permit id: #200507268591 | |||||
SCORE 100 Oti-2 24th fl el me. Current use: Office | Permit id: #200507278769 | |||||
SCORE 100 Oti2 25th fl el me. Current use: Office | Permit id: #200507278771 | |||||
SCORE 100 Oti-1 26th floor el me ls sp. Current use: Office | Permit id: #200507187860 | |||||
SCORE 94 19th floor: demolition of all tenant partitions and selected areas of building core including restr Current use: Office | Permit id: #200508220870 | |||||
SCORE 98 Card access system interface to fire safety system for drop out of evacuation rootes of 4th & 5th fl Current use: Office | Permit id: #200508291480 | |||||
SCORE 89 Incatll additional hvac and power to an existing cab previously prmitted under Current use: Office | Permit id: #200509092526 | |||||
SCORE 99 Oti-1 7th floor el me ls sp. Current use: Office | Permit id: #200509223591 | |||||
SCORE 99 Renew appl#200409103863 200504271012 200407280029 200412151506 Current use: Office | Permit id: #200601172240 | |||||
SCORE 89 Oti-1 19th floor el me ls sp Current use: Office | Permit id: #200601172250 | |||||
SCORE 89 Oti-2 19th floor el me sp. Mechanical electrical plumbing Current use: Office | Permit id: #200601172253 | |||||
SCORE 99 Renew for final Current use: Office | Permit id: #200601202634 | |||||
SCORE 94 Oti-1 10th fl-el ls me sp Current use: Office | Permit id: #200609212949 | |||||
SCORE 100 Oti-1 revision 25th fl Current use: Office | Permit id: #200610034018 | |||||
SCORE 99 Tenant improvement. Add 1 classroom to 20th floor (training room) approx 14 s. F. At room 20401. Current use: Office | Permit id: #200610124892 | |||||
SCORE 100 Change out sprinklers 10th floor Current use: Office | Permit id: #200610195442 | |||||
SCORE 100 T i upgrade on fire sprinkler system on 10th floor for met life #3286 relocated 64 hd add 11 hd deleted 13 hd Current use: Office | Permit id: #200610195469 | |||||
SCORE 100 Pull new coflex piping thru existing cases. No alteration 2 existing generator. No breaking of concrete. Current use: Office | Permit id: #200610245822 | |||||
SCORE 100 25th floor-t. I. (e) fire sprinkler system: 2 relocates. Current use: Office | Permit id: #200611026635 | |||||
SCORE 99 Life safety work only Current use: Office | Permit id: #200611026638 | |||||
SCORE 100 T. I. Existing fire sprinkler system. 3 relocated sprinklers 6 new sprinklers scope of work. 20th floor Current use: Office | Permit id: #200611228363 | |||||
SCORE 94 2nd & 3rd floors - demo all tenant partitions finishes ceiling lights mechanical electrical and plumbing; demo of some bldng. Core partitions & doors. Abatement of hazardous materials; reconstruction of bldng. Core and new restroom facilities. Current use: Office | Permit id: #200611278441 | |||||
SCORE 99 Business name: hq oti-1 22nd floor el ls sp. Current use: Office | Permit id: #200612089480 | |||||
SCORE 89 Remove 1 strobe and 1 speaker for room 20401 Current use: Office | Permit id: #200612139728 | |||||
SCORE 100 T. I. To existing fire sprinkler system 2 new sprinklers 2 relocate sprinklers. Current use: Office | Permit id: #200612149828 | |||||
SCORE 100 25th floor-life safety revision to pa# 200510044705 as built drawings. 4 new smoke detectors for lobby doors. Current use: Office | Permit id: #200612210378 | |||||
SCORE 89 Upgrade 13th floor to new life safety system. Current use: Office | Permit id: #200602104323 | |||||
SCORE 89 Upgrade 15 f to new life safety system. Current use: Office | Permit id: #200602104328 | |||||
SCORE 100 Renew 200408060860k 200407138721 Current use: Office | Permit id: #200603025797 | |||||
SCORE 100 T. I. To existing looped main fire sprinkler system. 199 sprinklers. Lines & heads. Current use: Office | Permit id: #200603096304 | |||||
Interior remodel of an (e) retail space on groundfloor ![]() ![]() Current use: Retail sales | Permit id: #200603146645 | |||||
SCORE 99 New fire alarm system on 19th floor as needed for buildout (16) smokes (34) speaker (28) strobes Current use: Office | Permit id: #200603287710 | |||||
Alter t-1 appl#200603146645 build wall & change elect. ![]() ![]() Current use: Retail sales | Permit id: #200605121509 | |||||
SCORE 89 Adding additional (2) racks to (e) lan room. Previously permitted 2006011722 (oti-1) adding electrical and data cables. Current use: Office | Permit id: #200605192022 | |||||
SCORE 99 T. I. Demolition - construction electrical plumbing (tenant improvement). Asbestos abatement removal. Restore fire proofing to structure. Current use: Office | Permit id: #200604249717 | |||||
SCORE 100 Infill-existing sprinkler system 31 new sprinklers mezzanine & penthouse floors. Current use: Office | Permit id: #200606083488 | |||||
SCORE 100 As-build t. I. Extg spkr system apn 200603096304 Current use: Office | Permit id: #200606083492 | |||||
SCORE 99 Two new entry doors from rated elevator lobby. Current use: Office | Permit id: #200606154206 | |||||
SCORE 99 Reroofing Current use: Office | Permit id: #200606214591 | |||||
SCORE 99 Fire alarm on 25th floor Current use: Office | Permit id: #200606285208 | |||||
SCORE 100 New base bldg line & main piping-184 (future) new sprinklers will be under seperate permit. Current use: Office | Permit id: #200607065752 | |||||
SCORE 100 As built life safety drawings as requested by sf fire dept field inspector. 24th flr Current use: Office | Permit id: #200607257467 | |||||
SCORE 100 As built life safety drawings as requested by sffd field inspector 26th flr Current use: Office | Permit id: #200607257472 | |||||
SCORE 100 Fire sprinklers system. As built. Ref. Appl#200510206055 Current use: Office | Permit id: #200608210082 | |||||
SCORE 99 Renovation of existing restrooms. Barrier removal only. Sprinkler & alarm under seperate permit. Current use: Office | Permit id: #200608290837 | |||||
SCORE 100 Base bldg build back. Core sprkl expansion to app #200607065752 Current use: Office | Permit id: #200609212946 | |||||
SCORE 56 Existing card access points in elevator lobby on 7th floor add new head end to 7th floor remove and replace card reader fire pull and request to exit motion with exact models add new head end to 7th floor fire alarm connection sep. Permit Current use: Office | Permit id: #200609293728 | |||||
SCORE 99 Oti-1 rev. 22nd fl. Current use: Office | Permit id: #200701192048 | |||||
SCORE 95 Renew pa#200606154206 for final inspection. Current use: Office | Permit id: #200710014219 | |||||
SCORE 99 Oti-2 10th fl me el Current use: Office | Permit id: #200702013080 | |||||
SCORE 94 2nd floor - life safety work. Current use: Office | Permit id: #200702123920 | |||||
SCORE 94 Life safty work Current use: Office | Permit id: #200702123923 | |||||
SCORE 94 10th floor - revision to 200608290837. Existing strobes and speakers to remain in original location. Current use: Office | Permit id: #200703156349 | |||||
SCORE 100 T i upgrade on fire sprklr system build back new main and uprt to follow Current use: Office | Permit id: #200703297565 | |||||
SCORE 99 Barrier removal only - restroom upgrades. All new plumbing fixtures toilet partitions walal tile & floor tiel; new accessories. Lighting electrical under separate permit. Mech. Under separate permit. Current use: Office | Permit id: #200704118512 | |||||
SCORE 100 7th floor project mechanical and electrical- priviously vacant room configured to it room. Comply with ab-060 Current use: Office | Permit id: #200704168870 | |||||
SCORE 99 Oti-1 3rd floor el me l. S sp Current use: Office | Permit id: #200704178953 | |||||
SCORE 100 Upgrade t i on fire sprinkler system. Buildback. Add 1 uprights & 9 pendents. Total 159 heads (#3353) 2nd floor Current use: Office | Permit id: #200704269739 | |||||
SCORE 100 Oti-2 sephora usa 3rd floor el me. Current use: Office | Permit id: #200705010100 | |||||
SCORE 99 New office & classroom improvement within previously demolished space. Non-structural walls ceilings and finishes. Mep. Under seperate permit life safety also udner seperate submittals. Current use: Office | Permit id: #200705010104 | |||||
SCORE 100 2nd floor-mechanical electrical plumbing for new tenant. Architectural under previous pa# 200705010104. Current use: Office | Permit id: #200705020202 | |||||
SCORE 100 T i upgrade of fire sprinkler system relocate 2 sprinkler heads in ther estrooms. Work at 9 floor at area of work only. Current use: Office | Permit id: #200705252252 | |||||
SCORE 100 3rd floor:upgrade t i on fire sprinkler; relocate (e) upright coverage to (n) pendent sprinklers for tenant improvement 17 heads. Current use: Office | Permit id: #200706063162 | |||||
SCORE 100 2nd floor - add 18 smoke detectors 5 duct detectors 41 strobes 38 speakers & 1 strobe power supply to the existing life safety system for the sephora remodel on 2nd floor. Current use: Office | Permit id: #200706083372 | |||||
SCORE 100 3rd floor - add 5 smoke detectors 2 duct detectors 33 strobes 37 speakers 1 power supply to the existing life safety system for the sephora remodel on 3rd floor. Current use: Office | Permit id: #200706083374 | |||||
SCORE 100 T i upgrade on (e) fire sprinkler system for sephora university 2nd floor. 191 sprinkler head aded. Current use: Office | Permit id: #200706214710 | |||||
SCORE 99 23rd flr-interior remodel of wall & finishes suite 2302 & 2308 Current use: Office | Permit id: #200707025667 | |||||
SCORE 98 New walls for offices 22nd floor. Mech ls sp seperate permit Current use: Office | Permit id: #200707126554 | |||||
SCORE 99 Revision to application 200707025667 to delete requirement for future permits for sprinklers electrical lighting and fire alarm struis. Existing condition as shown already comply. Current use: Office | Permit id: #200707126555 | |||||
SCORE 98 Mech for t. I. 2007 07 12 6554 on the 22nd. Floor. Fire protection shall be under separate permit Current use: Office | Permit id: #200707247587 | |||||
SCORE 100 Add 16 smoke detectors for new door holder locations. Revision to appl#200706083372 Current use: Office | Permit id: #200708038637 | |||||
SCORE 100 22nd floor & suite 2200. - add & relocating fire sprinklers for 22nd floor. Add 4 pendent spkrs and relocate on 2 of the sprinklers. Current use: Office | Permit id: #200708038684 | |||||
SCORE 94 22nd floor-renew pa# 200701192048 for final inspection only Current use: Office | Permit id: #200708200361 | |||||
SCORE 100 Addition of 1 duct detector (ac unit) and as built revision to the life safety functional matrix per the sffd testing inspector Current use: Office | Permit id: #200810033398 | |||||
SCORE 100 T. I. At 13th fl: provements to the existing fire sprinkler system. 1 new 9 relocated. Current use: Office | Permit id: #200810144019 | |||||
SCORE 100 Demolition and construction of non-load bearing partitions relocation and new lighting fixture new outlets new millwrok and new finishes on entire 14th floor. Sprinklers and life safety under separate permit. Current use: Office | Permit id: #200801303545 | |||||
SCORE 100 Demolition of portion of partitions on 12th fl. Include all restroom finishes ceiling light fixtures and plumbing. Reconstruction of new restroom facilities. New wall new pliumbing fixtures new gyp bd ceilingand light. Asbestos removal and reofire proofing at struc. Elements Current use: Office | Permit id: #200802285870 | |||||
SCORE 100 Demo of portion of partitions all restroom finishes gyp bd ceiling light fixt & plumb. Reconstruction of new restroom facilities inc. Minor const. Of new wall new toilet partitions finishes plumb fix. Gyp. Ceiling & lights work include asbestos removal and re-fireproofing structural elements. Current use: Office | Permit id: #200802285871 | |||||
SCORE 100 Demo portion of partitions all restrooms new finishes gyp bd. Ceiling light fixt. Plumb. Reconstruct new restroom facilities incl. Minor const. Of new wall toilet partitions gyp bd ceiling work includes asbestos removal & re-fireproofing at structural elements. Current use: Office | Permit id: #200802285874 | |||||
SCORE 100 13th floor-renovation of portions of (e) full flr tenant occupied floor. Construction of new non-load bearing partitions new power and data outlets and new finishes. Restrooms will be renovated. Asbestos removal & re-fire proofing @ stuructural elements under seperate permit. Current use: Office | Permit id: #200803046216 | |||||
SCORE 100 Tenant improvement to existing fire sprinkler system add 8 heads & relocate 36. Current use: Office | Permit id: #200803076656 | |||||
SCORE 100 14th floor: fire alarm system improvement - adding speakers strobes duct detectors & relocating several existing devices to the (e) bldg. Current use: Office | Permit id: #200803217711 | |||||
SCORE 100 16th fl:ti to include demolition of existing non structural partitions a portion of existing ceiling grid and tile and existing finishes. Construction of new ceiling grids and tile reused and new lighting new finishes. Restrooms will be upgraded to meet title 24 requirements. Mep separate permit Current use: Office | Permit id: #200803217743 | |||||
SCORE 100 37th floor-expansion to (e) fire sprinkler system in electrical room-9 sprinklers based on hrise detrofit ordiance. Current use: Office | Permit id: #200804028540 | |||||
SCORE 100 16th floor - mechanical and electrical work with ref. To pa# 2008 03 21 7743. Lighting with occupancy sensors new power and data reusing ex. Fan coil units and valve boxes and air distribution. Installing new fan coil vav box ac units heat pumps air distribution and water piping. Current use: Office | Permit id: #200804179929 | |||||
SCORE 95 Revision to 200610154206 for fire alarm system and final inspection. Replace 2 elevator lobby doors with card readers. Current use: Office | Permit id: #200804280711 | |||||
SCORE 99 Umbrella permit compliance with high rise sprinkler ordinance #377-93 ; no work Current use: Office | Permit id: #200805061449 | |||||
SCORE 98 Relocate 106 sprinkler heads & remove 22 on 16th floor. Current use: Office | Permit id: #200805071487 | |||||
SCORE 100 Install novec fire supression system for the computer room on the 16th floor. Current use: Office | Permit id: #200805131887 | |||||
SCORE 100 Addition of 33 strobes 38 speakes 3 duct detectors 2 smoke detectors 1 monitor module (fm-2 system) 1 relay module and 1 strobe power supply for the mcmorgan remodel on floor 16. Al new nice devices connect onto the existing life safety system Current use: Office | Permit id: #200805222626 | |||||
SCORE 99 27th fl full fl tenant improvement consisting of limited demo partition new trainging rm storage rm and open office areas w new finishes in limited areas no work to existing corredor demising wall w minor upgrades to existing toilet fms no structural work or change to building envelope. Current use: Office | Permit id: #200805293154 | |||||
SCORE 100 13th fl. Tenant improvements to extg fire sprinkler system relocated sprinkler Current use: Office | Permit id: #200806124303 | |||||
SCORE 100 12th fl. Tenant improvements to extg fire sprinkler system relocates Current use: Office | Permit id: #200806124305 | |||||
SCORE 100 Tenant improvement. Relocated spinkler system. Current use: Office | Permit id: #200806124308 | |||||
SCORE 100 15th flr. Tenant improvements to extg fire spinkler system relocated sprinklers Current use: Office | Permit id: #200806124309 | |||||
SCORE 100 T. I upgrade on (e) fire sprinkler system on 27th floor. Relocate 9 heads. Current use: Office | Permit id: #200807247489 | |||||
SCORE 100 27th floor for fire alarm system - addition of 1 speaker & relocation of 2 speakers & strobes for the partial remodel on floor 27. Current use: Office | Permit id: #200807308038 | |||||
SCORE 100 Mech work at new training room being constructed under pa# 2008. 05. 29. 3154 install one 4 ton water source heat pump piping ductwork diffusers t-24 for hvac at this room Current use: Office | Permit id: #200808159284 | |||||
SCORE 100 Electrical work associated with pa# 2008. 05. 29. 3154 toprovide power and lighting Current use: Office | Permit id: #200808159288 | |||||
SCORE 99 Install (n) ceiling grid & tile paint & vinyl flooring relocate (e) light fixtures info (n) grid brace ceiling & fixtures per code. Life safety fire sprinklers fire alarm electrical mechanical under separate permit. Current use: Office | Permit id: #200809050855 | |||||
SCORE 100 Ti upgrade on the e fire sprinkler system. Relocate 6 six pendents on the 2nd floor. Current use: Office | Permit id: #200809091126 | |||||
SCORE 94 Minor non-structural interior demo. 11th fl. All work performed in accordance per ab-17. Current use: Office | Permit id: #200809151614 | |||||
SCORE 100 9th floor-new storage room cabinets & finishes. No mep. Life safety or sprinklers on this permit. Current use: Office | Permit id: #200901291023 | |||||
SCORE 100 Repair craked topping slab on driveway. No work on actual building at fremont street. Current use: Office | Permit id: #200909177046 | |||||
SCORE 100 Mechanical work in suite 14 including replace fan coil unit modify ductwork & new grilles. Current use: Office | Permit id: #200911191712 | |||||
SCORE 100 8th floor. Demo only. Some non-structural walls & doors. Disable access to be under separate t. I. Permit. Current use: Office | Permit id: #200912213550 | |||||
SCORE 98 Demolition of a breakroom conference room and three offices to be replaced with furniture work stations and three new office. Electrical & mechanical work included. Fire alarm and sprinkler under separate permits. Current use: Office | Permit id: #200902242685 | |||||
Provide 3 interior atms in space used for atms by wells fargo bank. It is unoccupied space. We will be changing out the atms. Provide another entry new flooring paint & relamp fixtures. ![]() Current use: Office | Permit id: #200903194421 | |||||
SCORE 100 5th fl - t i upgrade on the (e) fire sprinkler for 425 market st. 5th. Floor. Relocate (11) heads & (6) delete heads. Current use: Office | Permit id: #200903204501 | |||||
SCORE 100 Renew pa# 2006 02 10 4323 to obtain final inspection. All work has been completed. Current use: Office | Permit id: #200903244769 | |||||
SCORE 100 Renew pa# 2005 11 14 7994 to obtain final inspection. All work has been completed. Current use: Office | Permit id: #200903244772 | |||||
SCORE 100 Renew pa# 2006 02 10 4328 to obtain final inspection. All work has been completed. Current use: Office | Permit id: #200903244773 | |||||
SCORE 100 Renew pa# 2006 03 28 77 to obtain final inspection. All work has been completed. Current use: Office | Permit id: #200903244774 | |||||
SCORE 100 Relocation of 2 strobes delete 2 strobes due to minor wall revisions in the existing thomson rueters tenant space on the 5th floor. No new devices Current use: Office | Permit id: #200903315270 | |||||
SCORE 95 Provide 3 interior atms in space used for atms by wells fargo bank. It is unoccupied space. We will be changing out the atms. Provide another entry new flooring paint & relamp fixtures. Current use: Office | Permit id: #200903194421 | |||||
SCORE 98 6th floor-demolititon of offices on the east side & re-spacing offices on the north & south sides. Life safety & fire sprinkler under seperate permit if necessary Current use: Office | Permit id: #200904226840 | |||||
SCORE 100 6th floor - addtion of 7 speakers and 3 strobes for the partial floor remodel to the life safety system on floor 6 for the thomson reuters tenant all new devices connect onto extg circuits. Current use: Office | Permit id: #200904247000 | |||||
SCORE 98 19th fl - to obtain final inspection for work approved under pa 200603287710. All wrok has been completed. Current use: Office | Permit id: #200904307417 | |||||
SCORE 99 Replace diesel fuel line ( return) from electric generator to fuel tank rest per sb 989 Current use: Office | Permit id: #200905088061 | |||||
SCORE 100 T. I. At 32nd fl: provide 1 hour rating to existing idf room replace existing non-rated door w new rated dor add cooling heat pumps to existing idf rooms. Current use: Office | Permit id: #200905279161 | |||||
SCORE 99 Fire alarm for 1st floor atm room. Add 2 speakers strobes add 1 smoke detector. Current use: Office | Permit id: #200906029549 | |||||
SCORE 100 Addition of 2 duct detectors for fsds. One heat pump shutdown replay module and one strobe for the 1df telephone room fire rating remodel on floor 32 all new safety devices connect onto existing circuits. Current use: Office | Permit id: #200906120305 | |||||
SCORE 100 Ti upgrade to sprinkler syatem on 6th fl. Relocate 16 heads. Current use: Office | Permit id: #200906150431 | |||||
SCORE 100 Addition of 1 life safety system relay module for heat pump shutdown in the floor 29 1df room of the morrision and foerster tenant Current use: Office | Permit id: #200907021831 | |||||
Repair craked topping slab on driveway. No work on actual building at fremont street. ![]() Current use: Office | Permit id: #200909177046 | |||||
SCORE 100 Office ti on 8th floor. Minor alterations to (e) suite construction of new load bearing partitions. Relocate light fixtures new power and data. Mep and life safety under separate permit Current use: Office | Permit id: #201001054196 | |||||
SCORE 100 8th floor-t. I upgrade of (e) fire sprinkler system. Relocate sprinklers & add 5 sprinklers Current use: Office | Permit id: #201001194898 | |||||
SCORE 100 Lobby: arch. Permit #201003299157 glazing permit. Install new glazing on lobby on both plaza side and fremont street with (2) revolving door on each side & one set double doors. Title 24 energy calcs. (envelope) under permit #201003299157. Current use: Office | Permit id: #201010052279 | |||||
SCORE 100 Partial tenant improvement consisting of new walls door ceilings in existing office space. Floors 29 32 Current use: Office | Permit id: #201010253636 | |||||
SCORE 100 Plumbing mechanical and electrical work for floors 29 and 32. Ref arch 201010253636 Current use: Office | Permit id: #201012036052 | |||||
33rd & 36th floors-partial tenant improvements consisting of new walls doors ceilings in an (e) office space. ![]() Current use: Office | Permit id: #201012237274 | |||||
31st & 34th floors-partial tenant improvements consisting of new walls doors ceilings in an (e) office space. ![]() Current use: Office | Permit id: #201012237275 | |||||
31st & 34th floors-arch pa# 2010-1223-7275-mechanical electrical & plumbing ![]() Current use: Office | Permit id: #201012237281 | |||||
33rd & 36th floors-arch pa# 2010-1223-7274-mechanical electrical & plumbing ![]() Current use: Office | Permit id: #201012237283 | |||||
Office ti( partial) on floors and 35 consisting of new walls dpprs ceilings in an (e) office space. Mep life safety under separate permit ![]() Current use: Office | Permit id: #201012237339 | |||||
Mech elec and plumbing work on floors and 35. Ti under pa# 2010. 12. 23. 7339 ![]() Current use: Office | Permit id: #201012237340 | |||||
SCORE 98 5th floor. Demolition of (7) offices and (12) work stations. Construction includes new partitions for (1) office (1) conference room (15) work stations. New power signal outlets and relocated lights fixtures. Mep included. Fire alarm & sprinklers under separate permit. Current use: Office | Permit id: #201002106272 | |||||
SCORE 100 5th fllor. Addition of 4 speakers and 4 strobes onto (e) lofe safety system circuits for the thomson reuters tenant remodel. Current use: Office | Permit id: #201002176705 | |||||
SCORE 100 5th floor t. I. Upgrade on (e) fire sprinkler system for thomas reuters editorial relocate 3 heads add 3 heads total 6 heads. Current use: Office | Permit id: #201002267195 | |||||
SCORE 100 Basement level - demo & construction of non-bearing patrtitions new light fixtures new millwork & new finishes. Demo includes some asbestos removal & refireproofing elec under separate permit. Current use: Office | Permit id: #201003097822 | |||||
(n) interior lobby (ground floor only) finishes; (n) ext. Grd flr lobby glazing; mep fire life safety & lobby glazing structural under separate permit ![]() Current use: Office | Permit id: #201003299157 | |||||
SCORE 100 (n) interior lobby (ground floor only) finishes; (n) ext. Grd flr lobby glazing; mep fire life safety & lobby glazing structural under separate permit Current use: Office | Permit id: #201003299157 | |||||
SCORE 100 5th fl-as built drawing of life safety additions to the thomson reuters remodel on floor 5 this as built revision includes the addition of 2 relay modules for heat pump shutdown. All other devices shown as new within the space were approved under orig permit app 201002176705 Current use: Office | Permit id: #201004069677 | |||||
SCORE 100 16th floor interior tenant including demo new walls ceiling work glass millwork doors & finishes. Current use: Office | Permit id: #201004261012 | |||||
SCORE 100 Remove selective gyp bd partition and relocate 1 set door frame sidelite. New ceiling ht gyp bd partition and framed glazing. Selective elec work and remove 2 ceiling 2x4 light fix Current use: Office | Permit id: #201005112138 | |||||
SCORE 100 Arch. Permit #201003299157 mep permit; demo lighting hvac. Install thermostats 3-slot diffusers return air dampers controls pressure heads (n) lighting 4-(n) drains for plumbing. Life safety & fire sprinkler under separate permit. Current use: Office | Permit id: #201005202876 | |||||
SCORE 100 Life safety portion of work as prt of tenant improvement on 16th fl which includes 11 speakers 9 strobes 2 duct detectors 1 relay module Current use: Office | Permit id: #201005202905 | |||||
SCORE 100 16th floor fire sprinkler t. I. - heads relcoated & changeout: 182 sprinklers; heads changed out: 38 sprinklers total 220. Current use: Office | Permit id: #201006094130 | |||||
SCORE 100 Fire alarm system on the 16th floor. As built submission as part of pa# 2010. 05. 20. 2905. 11 speakers 9 strobes 2 duct detectors and 1 relay device Current use: Office | Permit id: #201007237330 | |||||
SCORE 98 Relocate fire sprinkler heads at ground floor ( 52 relocate) Current use: Office | Permit id: #201007277583 | |||||
SCORE 99 Evacuation map signs for 16th floor renovation Current use: Office | Permit id: #201009161041 | |||||
SCORE 99 Evacuation map signs for lobby renovation project. Also fire control room sign. Current use: Office | Permit id: #201009161042 | |||||
SCORE 100 Upgrade of the extg life safety devices at the floor 1 lobby. These parts are 4 smoke detectors 4 speaker strobes 4 speakers 4 strobes & 1 remote command annunciator. Also 2 pull stations are being added as well as 5 relay modules in the basement for lobby extg door release. Current use: Office | Permit id: #201009271633 | |||||
SCORE 100 Fire sprinkler ti. Relocate 383 pendents add 18 pendents and delete 25 pendents on the 29th and 32nd floors Current use: Office | Permit id: #201101148417 | |||||
SCORE 100 Office ti( partial) on floors and 35 consisting of new walls dpprs ceilings in an (e) office space. Mep life safety under separate permit Current use: Office | Permit id: #201012237339 | |||||
SCORE 100 Mech elec and plumbing work on floors and 35. Ti under pa# 2010. 12. 23. 7339 Current use: Office | Permit id: #201012237340 | |||||
SCORE 100 Scope of work only consists of providing restrooms in compliance w ab-011. Levels 31 33 34 36 floors. Revision to permit#2010-12-23-7275 & 2010-12-23-7274 Current use: Office | Permit id: #201106208432 | |||||
SCORE 86 30th 31st 34 35th floors-create & produce 16 evacuation plan signs Current use: Office | Permit id: #201110076327 | |||||
SCORE 100 Interior tenant improvement including demo drywall ceiling work doors finishes and millwork Current use: Office | Permit id: #201110136718 | |||||
SCORE 100 1st floor tenant improvement to existing fire sprinkler system 15 relocated sprinklers 1 removed. Current use: Retail sales | Permit id: #201110146770 | |||||
SCORE 100 22nd floor-addition of 6 speakers & 1 strobe as well as the relocation of 1 smoke detector 5 spekaers & 3 strobes for the regus t. I. All devices connect onto the (e) life safety system. Current use: Office | Permit id: #201110317902 | |||||
SCORE 100 19th floor-addition of 4 strobes for the lab lan room in the (e) ibm tenant space-the strobes are being added due to te equipment in the room. All devices connect onto the (e) life safety system Current use: Office | Permit id: #201110317904 | |||||
SCORE 82 Strengthening of roof track of window washing equipment. Current use: Office | Permit id: #201111048342 | |||||
SCORE 100 Floor 22nd fire sprinkler t. I. - add 3 sprinklers relocate 21 sprinklers total 24 heads. Current use: Office | Permit id: #201111219337 | |||||
Accessibility and finish upgrade to the men and womens restrooms on the 11th floor ![]() ![]() Current use: Office | Permit id: #201111229396 | |||||
Replace 2 boilers with 5 ![]() ![]() Current use: Office | Permit id: #201111289562 | |||||
SCORE 100 Installation of e-911 pannel antenna as required by fcc & homeland security. Current use: Office | Permit id: #201105065496 | |||||
SCORE 100 1st floor: as built submission for the at&t store. Remodel on floor 1 which indicates the deletion of 2 pull stations no longer required by the sffd. The permit application number for the original installation was 2011-05-24-6646 Current use: Retail sales | Permit id: #201112029950 | |||||
11th floor-demolition of non structural partitions & finishes includes removal of finished ceiling grid & tile & safe off of demolished. Electrical & plumbing. Suite to remain unoccupied per ab-017 path of travel is not required. Life safety to remain in service during demolition ![]() ![]() Current use: Office | Permit id: #201112070260 | |||||
SCORE 100 Fire sprinkler permit. Relocate 397 add 13 delete sprinklers on the 30th and 35th floors Current use: Office | Permit id: #201112120462 | |||||
SCORE 100 Revision to app#201003299157. Showing turnstyles in detail. Current use: Office | Permit id: #201102110083 | |||||
SCORE 100 32nd floor-install 7 smoke detectors 5 duct detectors 27 speakers & 44 speaker strobes. Current use: Office | Permit id: #201102230804 | |||||
Ground floor interior t. I. To include demo of (e) interior walls construction of new interior walls (1) ada compliant restroom. Fire sprinkler fire alarm and mep under separate permits. ![]() ![]() Current use: Retail sales | Permit id: #201102281017 | |||||
SCORE 100 33rd & 36th floors-partial tenant improvements consisting of new walls doors ceilings in an (e) office space. Current use: Office | Permit id: #201012237274 | |||||
SCORE 100 33rd & 36th floors-arch pa# 2010-1223-7274-mechanical electrical & plumbing Current use: Office | Permit id: #201012237283 | |||||
SCORE 100 Provide wiring to new fire alarm layout to match suite remodel. Furnish and install 9 smokes 33 speakers and 31 speaker strobes. Current use: Office | Permit id: #201103111946 | |||||
SCORE 86 Create 8 evacuation map signs for floors 29th and 32nd floors Current use: Office | Permit id: #201103162191 | |||||
SCORE 100 Flo00r 29 & 32: revision to restroom for permit: 201010253636 to comply with ab-011. Addition of auto operators for accessible water closets for ab-011 @ womens & mens restrooms. Current use: Office | Permit id: #201103222631 | |||||
SCORE 83 Ground floor interior t. I. To include demo of (e) interior walls construction of new interior walls (1) ada compliant restroom. Fire sprinkler fire alarm and mep under separate permits. Current use: Retail sales | Permit id: #201102281017 | |||||
M e p associated with issued bldg permit #201102281017 ![]() ![]() Current use: Retail sales | Permit id: #201104284979 | |||||
Installation of e-911 pannel antenna as required by fcc & homeland security. ![]() Current use: Office | Permit id: #201105065496 | |||||
SCORE 100 Addition of 2 pull stations 7 speakers 5 strobes for the at &t store. Remodel on floor 1. All new devices connect onto the extg life safety system Current use: Office | Permit id: #201105246646 | |||||
SCORE 100 Provide elect. Finish upgrades to tr rm. To support (n) it equipment. This includes the installation of (n) elect. Outlet (n) ground buss bars (n) lighting (n) equipment racks & the anchorage on one (e) uniterrupted power supply. Current use: Office | Permit id: #201105256785 | |||||
SCORE 100 Fire sprinkler permit. Relocate 169 add delete 66 pendent sprinklers on 33rd fl. Relocate 184 add 22 delete 22 pendent sprinklers on 36th fl Current use: Office | Permit id: #201105276959 | |||||
SCORE 100 31st & 34th floors-partial tenant improvements consisting of new walls doors ceilings in an (e) office space. Fire sprinkler fire alarm and smoke control under separtate permits. M. E. P under seperate permit Current use: Office | Permit id: #201012237275 | |||||
SCORE 100 31st & 34th floors-arch pa# 2010-1223-7275-mechanical electrical & plumbing Current use: Office | Permit id: #201012237281 | |||||
SCORE 83 M e p associated with issued bldg permit #201102281017 Current use: Retail sales | Permit id: #201104284979 | |||||
SCORE 100 Provide wiring to new fire alarm layout on floors 33rd and 36th to match suite remodel. Furnish and install smokes spekers 77 speaker strobes and 16 duct smokes. Current use: Office | Permit id: #201106067451 | |||||
SCORE 100 Replace faces in 3 hanging cabinet signs. Permit id: #201106107844 | |||||
SCORE 98 Relocate extg butterfly valve one and check valve one fire sprinkler system. Current use: Office | Permit id: #201106208469 | |||||
SCORE 86 Create and install 8 evacuation map signs on floors 36 33 Current use: Office | Permit id: #201106248894 | |||||
SCORE 100 Revision to pa# 2010. 03. 29. 9157. Enlarge (e) fcc room relocate annuciator panel. Any electrical. Fire sprinkler or life safety upgraded or relocated accordingly at ground floor. Current use: Office | Permit id: #201108102178 | |||||
SCORE 100 1st floor-(e) fire sprinkler system tenant improvements- 2 removed sprinklers 9 relocated sprinklers & 5 added sprinklers Current use: Retail sales | Permit id: #201108253278 | |||||
SCORE 100 Fire sprinkler permit. Relocate 393 add 28 and delete pendent sprinklers on the 31st and 34th floors. Current use: Office | Permit id: #201109023815 | |||||
SCORE 100 31st & 34th floors-tenant improvement-new devices will be connected to (e) building fire alarm system. Devices include 19 smokes 3 duct detectors 67 speakers & speaker strobes. Current use: Office | Permit id: #201109124391 | |||||
SCORE 99 11th floor-demolition of non structural partitions & finishes includes removal of finished ceiling grid & tile & safe off of demolished. Electrical & plumbing. Suite to remain unoccupied per ab-017 path of travel is not required. Life safety to remain in service during demolition Current use: Office | Permit id: #201112070260 | |||||
SCORE 100 19th floor tenant improvenets existing fire sprinkler system. Relocate (4) sprinklers. Current use: Office | Permit id: #201201091858 | |||||
SCORE 100 Demolition of existing tenant improvements asbestos abatement minor buildback at core and columns new sprinkler main and mech distribution. Life safety under separate permit Current use: Office | Permit id: #201208308593 | |||||
SCORE 100 Addition of 6 smoke detectors 4 duct detectors 3 pull stations 1 relay module 11 speakers and 11 strobes for the floor 15 core area remodel. All new devices connect onto the life safety system. App#201208308593 Current use: Office | Permit id: #201210152000 | |||||
SCORE 100 New fire sprinklers and piping grid on 15th floor. Addition of 198 sprinkler heads new pipe bracing. T. I. Pa # 201209210383 Current use: Office | Permit id: #201210242688 | |||||
SCORE 100 5th floor - install (1) water source heat pump & piping. Current use: Office | Permit id: #201212045387 | |||||
14th floor:remodel of extg office space include all new walls doors casework ceiling lighting elec plmg. Mep drawings are included. Life safety & fire protection under seperate permit. ![]() Current use: Office | Permit id: #201212206603 | |||||
15th floor:remodel of extg shell condition office space include all new walls doors casework ceiling lighting elec plmg (demo under previous permit). Mep drawings are included. Life safety & fire protection under seperate permit. ![]() Current use: Office | Permit id: #201212206607 | |||||
SCORE 100 Reconfigure extg fire system on floors and 35. Add 4 duct smokes 25 smoke detectors 6 input modules 75 speakers and 71 speaker strobes. Current use: Office | Permit id: #201202033509 | |||||
SCORE 99 11th floor:interior tenant improvement. Construction of new open office offices conferance rooms and break area. New finishes throughout 11th floor. Mep and fire life safety under seperate permit. Current use: Office | Permit id: #201202164279 | |||||
27th floor - demolition of all tenant partiiton (non-load bearing) ceiling electrical mechanical & asbestos abatement. Renovation of core restrooms. ![]() Current use: Office | Permit id: #201202234731 | |||||
SCORE 100 27th floor - demolition of all tenant partiiton (non-load bearing) ceiling electrical mechanical & asbestos abatement. Renovation of core restrooms. Current use: Office | Permit id: #201202234731 | |||||
SCORE 99 11th floor-refer to arch pa# 2012-0216-4279-work is mechanical & electrical Current use: Office | Permit id: #201203015160 | |||||
SCORE 100 11th floor. Addition of 14 smoke detectors duct detectors 4 pull stations 52 speakers 4 speaker strobes & 39 strobes for the rambus full-floor remodel on floor 11. All devices connect onto the life safety system. Current use: Office | Permit id: #201203236705 | |||||
SCORE 100 11th floor existing fire sprinkler system tenant improvement - 2 new sprinklers 198 removed sprinklers. Current use: Office | Permit id: #201203266798 | |||||
Oti iii 22nd fl ls ![]() Permit type: Additions alterations or repairs | Permit status: Withdrawn | Completion date: October 22, 1999 | Current use: Office | Permit id: 9922569 | |||||
SCORE 100 Addition of 2 smoke detectors 2 speakers 2 strobes for the rambus tenant restrooms remodel on floor 11. All devices connect onto the life safety system Current use: Office | Permit id: #201203307170 | |||||
SCORE 100 As built submission for 30th & 35th floor scope as file under application #2012. 02. 03. 3509 for fire alarm system. Current use: Office | Permit id: #201204027295 | |||||
SCORE 100 Floor 27 - addition of 4 pull stations smoke detectors 4 duct detectors 2 relay modules 12 speakers 2 speaker strobes 12 strobes & 8 door holders for the core area remodel. All devices connect onto the life safety system. Current use: Office | Permit id: #201204067762 | |||||
SCORE 86 Restroom barrier removal Current use: Office | Permit id: #201205210898 | |||||
SCORE 99 11th floor. Structural work for server room. Equipment anchorage ref to pa#201202164279 and 2012030151 crack units on separate permit. Current use: Office | Permit id: #201205311589 | |||||
SCORE 99 Mech & electrical for pa# 201111229396 restroom. Current use: Office | Permit id: #201205311591 | |||||
SCORE 99 Revision to 201202164279. Interior tenant improvement. Revision includes construction of new doors. Current use: Office | Permit id: #201206011652 | |||||
SCORE 100 4 evacuation signs for renovation on 11th floor Current use: Office | Permit id: #201206082203 | |||||
SCORE 100 27th floor fire sprinkler - install new sprinkler pipe & sprinkler heads. Bracing included- core sprinkler work- Current use: Office | Permit id: #201207054111 | |||||
Cti-1 36/f no cti-2 ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: December 27, 1995 | Expiration date: January 18, 1998 | Current use: Office | Permit id: 9521582 | |||||
Demolition of existing tenant improvements asbestos abatement minor buildback at core and columns new sprinkler main and mech distribution. Life safety under separate permit ![]() Current use: Office | Permit id: #201208308593 | |||||
SCORE 100 Demolition of non-structual partitions doors & frames carpet millwork ceiling & lighing & mep system. All build back under separate permit. Arch mech fire alarm & fire sprinkler revisions under separate applications. ![]() ![]() Current use: Office | Permit id: #201209210383 | |||||
SCORE 86 Tenant improvement on the 23rd fl including new non-structural partitions finishes millwork new lighting & associated mechanical work. Life safety & sprinkler under separate permit. Current use: Office | Permit id: #201301037194 | |||||
SCORE 100 12th 13th 18th floors-12th fl-add 215 sprinkler heads 13th fl-add 215 sprinkler heads & 18th fl-add 206 sprinkler heads Current use: Office | Permit id: #201311061222 | |||||
Relocate existing water cooled crac unit from level 19 to 20. Provide connection to existing condense water system and existing ductwork. Relocate existing data racks to level 20. New power distribtion for racks and relocate hvac. Extend existing epo to include relocated equipment. No lighting partit ![]() Current use: Office | Permit id: #201311212461 | |||||
SCORE 95 7th floor - emergency evacuation signs. Total of (4) signs. Current use: Office | Permit id: #201312103736 | |||||
B f 2b- remove non-bearing partitions ceiling lights mep. Remove of some bldg core partitions & doors. Abatement of acm containing dry wall (n)men & women restrms & showers. (n) men & women janitor restrms. (n) janitors breakroom. Separate permits for mep l&s & sprinkler ![]() ![]() Current use: Office | Permit id: #201312113866 | |||||
1 f- demo of tenant partitions finishes ceiling mep no demo of deck demo some bldg core partitions & doors. Abatement of hazardous materials as indicated. Reconstruction of bldg core reapplication of fire proofing per code; future ti under separate permit & ab-017 applies. ![]() ![]() Current use: Office | Permit id: #201312113872 | |||||
SCORE 100 12th floor - revisions to permit # 2013-0516-7090. Dimension for pull side clearance at door #81. Removed due to physical constraints in field. Hardship added Current use: Office | Permit id: #201312113953 | |||||
SCORE 100 13th floor - revision to permit # 2013-0516-7091. Dimension for pull side clearance at door # 81 removed due to physical constraints in field. Hardship added Current use: Office | Permit id: #201312113962 | |||||
SCORE 100 Revision to permit # 2013-0516-7089. Dimension for pull side clearance at door #81. Removed due to physical constraints in field. Hardship added Current use: Office | Permit id: #201312113971 | |||||
SCORE 100 14th floor:remodel of extg office space include all new walls doors casework ceiling lighting elec plmg. Mep drawings are included. Add emerg door release in service elevator lobby. Life safety & fire protection under seperate permit. Current use: Office | Permit id: #201212206603 | |||||
SCORE 100 15th floor: remodel of (e) office space include new walls doors casework ceiling lighting elec plmg in shell condition space (demo under previous permit). Include mep drawings. Life safety & sprinkler fire protection under seperate permit. Current use: Office | Permit id: #201212206607 | |||||
SCORE 100 15th floor-as builts for life safety revisions 15th fl core area. Reference pa# 2012-1015-2000 Current use: Office | Permit id: #201302271086 | |||||
SCORE 100 23rd floor: fire sprinkler upgrade for tenant improvement relocate 217 pendents add 51 uprights t. I. # 201301037194 Current use: Office | Permit id: #201303011283 | |||||
SCORE 100 Addition of 5 smoke detectors 1 monitor module 5 relay modules 9 speakers speaker strobes 4 door holders 1 strobe power supply for the cushman and wakefield remodel on floor 23. All devices connect onto the life safety system Current use: Office | Permit id: #201303051454 | |||||
SCORE 100 14th & 15th floors-addition of 1 strobe power supply 2 smoke detectors 8 duct detectors 4 modules 23 speakers 27 speaker strobes 3 strobes for the united health group remodel & total floor remodel on 15th fl. All devices connect onto the life safety system Current use: Office | Permit id: #201303202678 | |||||
SCORE 98 Add relocate & remove fire sprinkler heads per t. I. 14th floor: relo 14 lowered 3 removed ref pa# 201212206603 15th fl: 2 add 188 relo 8 remove ref pa# 201212206607 Current use: Office | Permit id: #201303273130 | |||||
SCORE 86 23rd floor:revision to app#201301037194. Hardship request to install power operator at womens restroom on floor 23 Current use: Office | Permit id: #201303283306 | |||||
SCORE 86 23rd floor:evacuation signs on the 23rd floor as required by sffd. Current use: Office | Permit id: #201305066212 | |||||
18th floor - demolition of non-load bearing partitions finishes ceilings equipment hvac electrical & plumbing. Abatement of hazardous materials. Reconstruction of building core. Re-application of fire proofing. ![]() ![]() Current use: Office | Permit id: #201305167089 | |||||
12th floor - demolition of non-load bearing partitions finishes ceilings equipment hvac electrical & plumbing. Abatement of hazardous materials. Reconstruction of building core. Re-application of fire proofing. ![]() Current use: Office | Permit id: #201305167090 | |||||
13th floor - demolition of non-load bearing partitions finishes ceilings equipment hvac electrical & plumbing. Abatement of hazardous materials. Reconstruction of building core. Re-application of fire proofing. ![]() Current use: Office | Permit id: #201305167091 | |||||
SCORE 100 18th floor - demolition of non-load bearing partitions finishes ceilings equipment hvac electrical & plumbing. Abatement of hazardous materials. Reconstruction of building core. Re-application of fire proofing. Current use: Office | Permit id: #201305167089 | |||||
SCORE 100 12th floor - demolition of non-load bearing partitions finishes ceilings equipment hvac electrical & plumbing. Abatement of hazardous materials. Reconstruction of building core. Re-application of fire proofing. Current use: Office | Permit id: #201305167090 | |||||
SCORE 100 13th floor - demolition of non-load bearing partitions finishes ceilings equipment hvac electrical & plumbing. Abatement of hazardous materials. Reconstruction of building core. Re-application of fire proofing. T. I. & fire sprinkler under seperate permit. Current use: Office | Permit id: #201305167091 | |||||
SCORE 96 21st floor suite - addition of (1) exec. Office. Current use: Office | Permit id: #201306189878 | |||||
14th & 15th floors - (8) eight evacuation signs ![]() Current use: Office | Permit id: #201306210163 | |||||
SCORE 100 18th floor-addition of 8 smoke detectros 4 duct detectors 1 relay module 13 speaker strobes 1 speaker 1 strobe 4 door hoolders for the core area remodel o floor 18. All new devices connect to life safety system. Ref 201305167089 Current use: Office | Permit id: #201307111536 | |||||
SCORE 100 Addition of 8 smoke detector 4 duct detectors 1 elay module 14 speaker strobes 1 speaker 1 strobe 4 door holders for core area remodel on floor 12. All new devices connect on to life safety system. Current use: Office | Permit id: #201307111538 | |||||
SCORE 100 Floor 13 - addition of 8 smoke detectors 4 duct detectors 1 relay module 13 speaker strobes 1 speaker 1 strobe 4 door holders for the core area remodel. All new devices connect on to life safety system. Ref pa #2013. 0516. 7091 Current use: Office | Permit id: #201307111539 | |||||
SCORE 100 14th & 15th floors - (8) eight evacuation signs Current use: Office | Permit id: #201306210163 | |||||
SCORE 100 Addition o f 1 speake strobe for the executive office on floor 21. Device connects onto the life safety system ref 201306189878 Current use: Office | Permit id: #201308083892 | |||||
SCORE 100 2 relocates for office on 21st floor. Current use: Office | Permit id: #201308093931 | |||||
SCORE 100 1 f- demo of tenant partitions finishes ceiling mep no demo of deck demo some bldg core partitions & doors. Abatement of hazardous materials as indicated. Reconstruction of bldg core reapplication of fire proofing per code; future ti under separate permit & ab-017 applies. Current use: Office | Permit id: #201312113872 | |||||
SCORE 100 #950- this project involves modification and expansion of existing tenant suite to include selective demolition of demising partition and construction of new office doors & frames and new finishes. F a & spinkler under separate permit. Compliance with maher ordinance no 155-13 not required. Current use: Office | Permit id: #201409045398 | |||||
SCORE 100 9th floor ste 9 - this project involves minor modification of an (e) tenant suite work includes selective demolitoin construction of a new demising wall re-switching of (e) lighting new basefeeds & new finishes. N a maher ordinance Current use: Office | Permit id: #201409045399 | |||||
SCORE 100 Demolition of lights mech and electrical demo some buildingcore partitions & doors. Abatement of acm containing drywall & taping compound in area of work & reconstruction of abated partitions. Scope also includes construct of new accessible and non-accessible showers toilet rooms lockerroom. Current use: Office | Permit id: #201409226970 | |||||
SCORE 100 10th floor -revision to appl #2014. 0729. 2442 - clarification of construction costs for accessibility items. Current use: Office | Permit id: #201410027957 | |||||
SCORE 100 8th floor fire alarm work for core remodle project - additions are 8 smoke detectors 4 duct detectors 3 pull stations 1 relay module 4 speakers speaker strobes 2 strobes & 4 door holders. Ref pa #2014. 0630. 9996. N a maher ordinance Current use: Office | Permit id: #201410158909 | |||||
SCORE 98 17th flr: tenant improvement demo existing walls new finishes new offices toilet room upgrades new ceiling mep modifications; maher n a Current use: Office | Permit id: #201411171658 | |||||
SCORE 100 Relocate pendent sprinkler heads on the 8th floor restrooms. Ti 201406309996 Current use: Office | Permit id: #201411262561 | |||||
SCORE 100 Addition of 2 speaker strobes for the buildback construction on floor 1. Both new devices connect onto the fire alarm system. Ref pa 201312113872 Current use: Office | Permit id: #201402148514 | |||||
SCORE 96 Relocate existing water cooled crac unit from level 19 to 20. Provide connection to existing condense water system and existing ductwork. Relocate existing data racks to level 20. New power distribtion for racks and relocate hvac. Extend existing epo to include relocated equipment. No lighting partit Current use: Office | Permit id: #201311212461 | |||||
SCORE 100 Addition of 1 duct detector and 1 relay module for the ibm lan room: on floor 20. Both devices connect onto the life safety system Current use: Office | Permit id: #201403060009 | |||||
SCORE 100 Demolition of a portion of an extg mechanical mezanine between the 1st & 2nd floor(floor1-5). This includes demolition of select partitions finishes doors and frames minor ceiling lighting & electrical modifications. N a for the maher ordinance #155-13. Current use: Office | Permit id: #201403100341 | |||||
SCORE 100 01st floor: relocate 32 upright heads. Compliance w ordinance #155-13 not required Current use: Office | Permit id: #201403312066 | |||||
SCORE 96 20th & 21st floors including demoliton & new construction of non-load bearing partitions doors finishes ceilings & casement. & associated mechanical & electrical work. Fire sprinkler & ls under separate permit. Compliance with ordinance #155-13 not required Current use: Office | Permit id: #201404032339 | |||||
SCORE 100 13 f: t. I. Improvement. Non-structural demo non-structural partitions ceiling lighting electrical finishes. No change in occupancy use or area. Mahr ord. 155-13 not applicable. Current use: Office | Permit id: #201404082701 | |||||
SCORE 100 33rd floor:addition of 3 new duct detectors at new fan coil units locations. New devices to be connected to extg loop 2:53 and tied into the fire alarm system. N a for the maher ordinance #155-13 Current use: Office | Permit id: #201404102888 | |||||
SCORE 100 Non-structural demo (n) non structural partitions ceiling & lighting finishes millwork mep. No change in occupancy use or area. Life safety sep. Permits n a ordinance #155-13. Current use: Office | Permit id: #201404153219 | |||||
1st floor:revision to app#201312113872 to include addl demo of 42 sq ft of extg marble floor new wall location at west side of suite. Also includes new non-bearing partition on east side of suite. N a for the maher ordinance #155-13 ![]() Current use: Office | Permit id: #201405196131 | |||||
SCORE 98 12th floor:add and relocate fire sprinkler per t. I. . 37 add. 82 relocate. Current use: Office | Permit id: #201406037312 | |||||
SCORE 98 13th floor:add and relocate fire sprinkler per t. I. 41 add. 74 relocate. Ref app#201404082701 Current use: Office | Permit id: #201406037314 | |||||
SCORE 100 12th & 13th floor fire alarm work for xoom remodels. The additions are 2 smoke detectors 9 duct detectors 4 modules 2 strobe power supplies 15 spearkers 46 speaker strobes & 18 strobes. Ref #2014. 0408. 2701 (flr 13) & 2014. 0415. 3219 (flr 12). N a maher ordinance Current use: Office | Permit id: #201406107910 | |||||
SCORE 100 21st floor: fire alarm: addition of 1 speaker and 4 strobes for the ibm remodel. Ref app#201404032339 Current use: Office | Permit id: #201406128170 | |||||
SCORE 100 20th floor: t. I. Job: addition of 2 speaker and 3 strobes for the ibm remodel. Ref app#201404032339 Current use: Office | Permit id: #201406128173 | |||||
SCORE 100 Install 75 new fire sprinklers and seismic upgrade at 20th floor. Install 35 new fire sprinklers and seismic upgrade at 21st floor. Ref. Appl. 2014. 04. 03. 2339. Maher n a. Current use: Office | Permit id: #201406188749 | |||||
8th fl-change of use from adult education to office. Work includes demo of all tenant ptn finishes ceiling lights mech elec & plumb demo of some bldg core partitions doors & abatement of haz. Materials as indicated. Reconstruction of bldg core & ada upgrades to restrooms. N a maher ordinance ![]() Current use: Office | Permit id: #201406309996 | |||||
SCORE 100 8th fl-change of use from adult education to office. Work includes demo of all tenant ptn finishes ceiling lights mech elec & plumb demo of some bldg core partitions doors & abatement of haz. Materials as indicated. Reconstruction of bldg core & ada upgrades to restrooms. N a maher ordinance Current use: Office | Permit id: #201406309996 | |||||
SCORE 100 1st floor: revision to app#201312113872 to include addl demo of 42 sq ft of (e) marble floor new wall location at west side of suite. Also includes new non-bearing partition on east side of suite. N a for the maher ordinance #155-13 Current use: Office | Permit id: #201405196131 | |||||
SCORE 100 10th floor t. I. Work includes selective demolition and construction of non-structural partitions. Reswitching of existing lighting & new finishes. Restroom renovated to full accessibility compliance. Maher n a. Current use: Office | Permit id: #201407292442 | |||||
Oti-1 22nd floor lt me l/s sp. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 25, 1999 | Expiration date: April 4, 2002 | Current use: Office | Permit id: 9917719 | |||||
SCORE 100 Revision to pa#201407292442 cover sheet & rcp sheet- no lighting electrical work & specify work done for form c. 20%. N a ordinance #155-13. Current use: Office | Permit id: #201408204258 | |||||
#950- this project involves modification and expansion of existing tenant suite to include selective demolition of demising partition and construction of new office doors & frames and new finishes. F a & spinkler under separate permit. ![]() Current use: Office | Permit id: #201409045398 | |||||
9th floor ste 9 - this project involves minor modification of an (e) tenant suite work includes selective demolitoin construction of a new demising wall re-switching of (e) lighting new basefeeds & new finishes. N a maher ordinance ![]() Current use: Office | Permit id: #201409045399 | |||||
SCORE 100 Revision to appl. No 2013. 1211. 2872. New hardship request form. Maher n a. Current use: Office | Permit id: #201409045414 | |||||
Demolition of lights mech and electrical demo some buildingcore partitions & doors. Abatement of acm containing drywall & taping compound in area of work & reconstruction of abated partitions. Scope also includes construct of new accessible and non-accessible showers toilet rooms lockerroom. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: September 22, 2014 | Current use: Office | Permit id: 201409226970 | |||||
SCORE 100 Addition o f 1 speake strobe for the executive office on floor 21. Device connects onto the life safety system ref 201306189878 Permit type: Building permit | Expiration date: December 9, 2013 | Current use: Office | Permit id: #201308083892 | |||||
Cti-1 (el me sp) - 11th fl ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 29, 1996 | Expiration date: May 6, 1998 | Current use: Office | Permit id: 9607333 | |||||
Oti-3 6 f sp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: November 9, 1999 | Current use: Office | Permit id: 9923872 | |||||
Rnwl app# 9313144/9414318/9418373/9420186/9418585/9514562 ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: November 17, 1997 | Expiration date: March 17, 1998 | Current use: Office | Permit id: 9723195 | |||||
Install fire sprinkler system ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 23, 1999 | Expiration date: January 23, 2000 | Current use: Office | Permit id: 9920063 | |||||
18th flr: install new evacuation maps to comply with current sffd map guidelines. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 20, 2015 | Expiration date: April 14, 2016 | Current use: Office | Permit id: 201504204121 | |||||
4th flr: tenant improvement relocate six (6) sprinklers to conform with new wall/ceiling layout ref. 201509106561; maher n/a ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 30, 2015 | Expiration date: January 31, 2016 | Current use: Office | Permit id: 201509308406 | |||||
Core reconstruction new drywall elec & plumb @ 9th flr ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 11, 1988 | Expiration date: May 11, 1989 | Current use: Office | Permit id: 8804614 | |||||
Fire sprinkler permit. Relocate 169 add delete 66 pendent sprinklers on 33rd fl. Relocate 184 add 22 delete 22 pendent sprinklers on 36th fl ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 27, 2011 | Expiration date: May 11, 2014 | Current use: Office | Permit id: 201105276959 | |||||
Provide a halon 1301 fire suppression system ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 27, 1990 | Expiration date: July 19, 1990 | Current use: Office | Permit id: 9003719 | |||||
Cti-2 fl-34 el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: December 20, 1991 | Expiration date: January 23, 1993 | Current use: Office | Permit id: 9123991 | |||||
SCORE 95 Install 335 data cables on the 30th floor ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201112019314 | |||||
SCORE 98 Grnd flr: plug 4 sprinkler add 5 sprinkler and relocate 14 sprinkler. Referenced ti 2015. 0126. 6675 under 28 fremont. Permit type: Building permit | Current use: Office | Permit id: #201503272051 | |||||
Replace finishes & raised floor const. Walls relocate light ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 12, 1990 | Expiration date: July 20, 1991 | Current use: Office | Permit id: 9011403 | |||||
SCORE 95 Modular office furniture; 141 workstations. James talus 510. 774. 9886 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130226421 | |||||
SCORE 95 5 new oulets relocate 2 fixtures ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130717741 | |||||
SCORE 95 Furniture power feed modifications. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120208342 | |||||
Cti-1 el me sp 21/f ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 2, 1993 | Expiration date: October 4, 1994 | Current use: Office | Permit id: 9313003 | |||||
Installation of raised floor electrical and mechanical ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: November 21, 1988 | Expiration date: January 10, 1990 | Current use: Office | Permit id: 8818508 | |||||
Soft demolition ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 5, 1999 | Expiration date: March 5, 2000 | Current use: Office | Permit id: 9904347 | |||||
Revise permit no 200507208585- delete from the special inspection & structural observation the following- fillet welds; metal dock; ndt; fire proofing; bolts in existing concrete; and pull/torque testing ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: November 30, 2005 | Expiration date: March 31, 2006 | Current use: Office | Permit id: 200511309172 | |||||
Cti 1 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: September 18, 1989 | Expiration date: September 21, 1990 | Current use: Office | Permit id: 8917278 | |||||
SCORE 95 Communications cabling services ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150820761 | |||||
Oti-2 28th floor el me l s sp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Expiration date: January 6, 2000 | Current use: Office | Permit id: 20000106367 | |||||
Remodel restrooms to meet handicap requirements/corridor wk ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 21, 1987 | Expiration date: March 10, 1988 | Current use: Office | Permit id: 8710255 | |||||
4th & 5th floors: ti - add 3 speakers and 8 strobes. Maher na ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 5, 2015 | Expiration date: April 5, 2016 | Current use: Office | Permit id: 201510058753 | |||||
SCORE 95 Adding 4- new 1 amp panels and 1-150kva transformer. Also 1 smoke detector and around receptacles no lighting ! ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140224721 | |||||
Oti-2 el sp me ref:9914743 ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: September 20, 1999 | Expiration date: October 19, 2000 | Current use: Office | Permit id: 9919727 | |||||
Oti-3 12th floor l/s ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: December 4, 1998 | Expiration date: June 14, 1999 | Current use: Office | Permit id: 9824829 | |||||
SCORE 95 Install 335 data cables on the 35th floor. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201112019315 | |||||
SCORE 95 Communication cabling services ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130211781 | |||||
6th floor-demolititon of offices on the east side & re-spacing offices on the north & south sides. Life safety & fire sprinkler under seperate permit if necessary ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 22, 2009 | Expiration date: April 18, 2010 | Current use: Office | Permit id: 200904226840 | |||||
SCORE 95 Electrical and life safety work - 14th floor united health group -job #33355 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130226201 | |||||
SCORE 95 6-lights and 3-cans lights added relocate existing fire head and speakers strobes added 1-data and tv outlet in lobby ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150204121 | |||||
Oti iii 6th fl ls ![]() Permit type: Additions alterations or repairs | Permit status: Withdrawn | Completion date: October 22, 1999 | Current use: Office | Permit id: 9922564 | |||||
SCORE 95 Cushman & wakefield (175)lights (75) switches (165)reeptacles (1) panelboard ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130125461 | |||||
SCORE 95 Hanson bridge library - install (2) duplex recptacles and (1) quad receptacle. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130826041 | |||||
Remove partitions elect.& phone outlets install ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: November 15, 1984 | Expiration date: January 10, 1986 | Current use: Office | Permit id: 8412172 | |||||
Demolish walls const. Walls and electrify relocatd ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 25, 1990 | Expiration date: July 20, 1991 | Current use: Office | Permit id: 9007920 | |||||
Oti-1 el me l s sp ![]() ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: January 13, 2000 | Current use: Office | Permit id: 20000113927 | |||||
Emergency evacuation signage 4 signs 17th floor. Ref app#201502178477. N/a for maher ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 24, 2015 | Expiration date: March 18, 2016 | Current use: Office | Permit id: 201502249131 | |||||
SCORE 95 Add (8) receptacles and re-switch some existing lights. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20111205582 | |||||
SCORE 95 Modular office furniture installation of additional (2) stations in addition to permit #ew20141203461 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20141203481 | |||||
Cti-2 (el me) 19th fl ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 14, 1996 | Expiration date: March 6, 1997 | Current use: Office | Permit id: 9602455 | |||||
Revision to permit # 2013-0516-7089. Dimension for pull side clearance at door #81. Removed due to physical constraints in field. Hardship added ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 11, 2013 | Expiration date: December 15, 2014 | Current use: Office | Permit id: 201312113971 | |||||
SCORE 95 Voice and data communications cabling services. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20140715122 | |||||
Cti 2 electrical & mechanical work 32nd flr ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 30, 1993 | Expiration date: February 10, 1994 | Current use: Office | Permit id: 9311066 | |||||
Cti 2 el sp me ls 9th fl ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: November 14, 1997 | Expiration date: November 25, 1998 | Current use: Office | Permit id: 9723053 | |||||
SCORE 95 Install (325) cables on the 18th floor for alvarez & marsal - 58349 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150217721 | |||||
Oti 4 29th floor-dcc app#9725976 & 9800014 ![]() Permit type: Otc alterations permit | Permit status: Expired | Completion date: April 21, 1998 | Expiration date: October 21, 1998 | Current use: Office | Permit id: 9806936 | |||||
SCORE 95 Install (210) data cables. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150122581 | |||||
Revision to appl. No 2013. 1211. 2872. New hardship request form. Maher n/a. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 4, 2014 | Expiration date: September 6, 2015 | Current use: Office | Permit id: 201409045414 | |||||
Soft demolition and buildback ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 8, 1999 | Expiration date: June 8, 2001 | Current use: Office | Permit id: 9911338 | |||||
SCORE 95 Modular furniture installation ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20150207021 | |||||
Oti-1 6th floor el. Me. L/s. Sp. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 5, 1999 | Expiration date: October 27, 2001 | Current use: Office | Permit id: 9921016 | |||||
Cti-1 35thfl el me sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: July 5, 1996 | Expiration date: July 24, 1998 | Current use: Office | Permit id: 9612052 | |||||
SCORE 95 Furnish and install (4) 30a 208v receptacles 2 new rack mounted ups units.(1) dedicated outlet (1) 30a circuit for heat pump ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20121210961 | |||||
SCORE 95 Modular office furniture; 193ea workstations johan montavlo 510. 648. 7115 ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130429921 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: July 18, 2001 | Permit id: 15572 | |||||
SCORE 95 Install (108) data cables. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130401301 | |||||
Fire sprinklers ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: December 4, 1997 | Expiration date: April 18, 1998 | Current use: Office | Permit id: 9724345 | |||||
Additions alterations or repairs ![]() Permit status: Complete | Completion date: August 24, 1984 | Expiration date: January 10, 1986 | Current use: Office | Permit id: 8409272 | |||||
SCORE 95 425 market street - 11th floor -rambus - telcom permit - 5 cables - wbe job #02-1232 - contact darren fridolfs - 415-798-0012 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120425621 | |||||
Remodel exist restrooms to meet w/handicap requirements ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: December 11, 1986 | Expiration date: January 14, 1988 | Current use: Office | Permit id: 8615686 | |||||
SCORE 96 17 lights; 4 switches; 4 receptacles; fire alarm devices - 3 strobes 3 speakers 3 smoke detectors; rambus bathrooms; 11th floor; cei job #12-4-09624- cb ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20120419861 | |||||
Lighting replacement in parking garage. Maher n/a. ![]() ![]() Permit type: Building permit | Current use: Prkng garage/public | Permit id: #201506037930 | |||||
SCORE 95 153 duplexes for modular partitions only on the 32nd floor ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20110407761 | |||||
SCORE 95 Modular office furniture: 24 workstations ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20110420301 | |||||
SCORE 95 84 stations for modular partitions only ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130402621 | |||||
Revision to app#201003299157. Showing turnstyles in detail. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 11, 2011 | Expiration date: February 18, 2012 | Current use: Office | Permit id: 201102110083 | |||||
SCORE 95 Electrical & life safety - 15th floor united health group - job #33355 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130226181 | |||||
Cti-3 30th floor sp ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: September 5, 1996 | Expiration date: March 11, 1997 | Current use: Office | Permit id: 9616648 | |||||
SCORE 100 4th floor ti of (e) office bldg tenant floor. Improvements to include partial demo of non-load bearing partitions. Floor finishes ceiling elements lighting & minor construction of non-load bearing partitions and finishes. Maher na Permit type: Building permit | Current use: Office | Permit id: #201509106561 | |||||
SCORE 95 425 market street - ste 9 - eze castle - up to 5 outlets - wbe job #01-113883 - contact - 415-898-1400 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20110408161 | |||||
SCORE 95 Xoom (120)lights (50)switches (150)receptacles (2)panelboards ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140425101 | |||||
Additions alterations or repairs ![]() Permit status: Complete | Completion date: December 17, 1981 | Expiration date: July 21, 1982 | Permit id: 8110596 | |||||
Alteration of path of entry ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 7, 1985 | Expiration date: May 6, 1986 | Current use: Office | Permit id: 8511312 | |||||
SCORE 100 Erect illuminated double faced sign. Maher na Permit type: Building permit | Permit id: #201508113985 | |||||
Permit to operate boiler Permit status: Issued | Permit id: 72069 | |||||
SCORE 100 18th flr: install new evacuation maps to comply with current sffd map guidelines. Permit type: Building permit | Current use: Office | Permit id: #201504204121 | |||||
SCORE 93 Installation of 124 modular workstations ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20140723422 | |||||
Limited demo of carpet vct and walls maher not req. Ab-017 ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201508063534 | |||||
Upgrade the 7th flr to the new life safety system. ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: December 23, 2003 | Expiration date: January 22, 2005 | Current use: Office | Permit id: 200312232890 | |||||
Oti-3 24th floor l/s ![]() Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: December 4, 1998 | Expiration date: April 14, 1999 | Current use: Office | Permit id: 9824836 | |||||
SCORE 95 Relocate 3-furniture feeds per new lay-out ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150709401 | |||||
SCORE 100 Limited demo of carpet vct walls. Ab-017 Permit type: Building permit | Current use: Office | Permit id: #201508063536 |