Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical - heavy up Date: May 30, 2017 Client: Daniel Perrone | Permit status: Permit issued | Permit id: Eh1703363 | |||||
SCORE 82 Basement: replace electrical panel, removal of non load bearing walls 1st floor: removal of cabinets and appliances, removal of load bearing wall replace with beam and post, new lighting 2nd floor: new closet, bath remodel including replacement of tub, toilet and vanity no change to radiator heating system Date: June 16, 2017 Contractor: Jesse Tarr Client: Olga N Habib | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1709645 | |||||
Electrical Date: July 24, 2017 Client: Daniel T Perrone | Permit status: Permit issued | Permit id: E1708650 | |||||
SCORE 96 Mechanical Date: July 18, 2017 Contractor: Kostas Rikos Client: Daniel T Perrone | Permit status: Permit issued | Permit id: M1703081 | |||||
Plumbing and gas Date: July 7, 2017 Client: Daniel T Perrone | Permit status: Permit issued | Permit id: P1707265 |