Building Permits at 4203 Davenport St Nw, Washington, DC 20016


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 4203 Davenport St Nw, Washington, DC 20016 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Eight exploratory borings will be drilled to a depth of feet below existing ground surface part of a geotechnical investigation using hollow stem auger and split-spoon sampler. Geotechnical sample will be obtained from this borings. Upon completion, the bore holes will be abandoned in accordance with d. C ddoe requirements within 24 hours. The borings diameter will be six inches. Borings will be abandoned with bentonite slurry in accordance with ddoe-wqd requirements -two pounds of bentonite to one-gallon water- within two hour completion. Sealing materials will be introduces at the bottom of the borehole and placed progressively upward to within several inches of ground surface. The remain open portion of the boring will be closed with asphalt cold patch, as per site plans, dc well construction application, dc well schematic form, and work plan report for the bozzuto development company/tenleytown safeway
Date:  September 11, 2013

Client: Bozzuto Development Company. | Applicant: Rps, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300333
2013/09/110954203 Davenport St Nw Washington Dc 20016
Re-pipe existing ansul r-102 3-gallon commercial kitchen hood fire suppression system in order to provide proper protection for cooking equipment - hood is existing - safeway #1395
Date:  September 12, 2014

Client: Safeway Inc | Applicant: Guardian Fire Protection Services, | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1411924
2014/09/120954203 Davenport St Nw Washington Dc 20016
SCORE
93
Re-pipe existing ansul r-102 3-gallon commercial kitchen hood fire suppression system in order to provide proper protection for cooking equipment - hood is existing - safeway #1395
Date:  September 12, 2014

Client: Safeway Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1411924
2014/09/120934203 Davenport St Nw, Washington, Dc 20016Guardian Fire Protection Services
SCORE
100
Eight exploratory borings will be drilled to a depth of feet below existing ground surface part of a geotechnical investigation using hollow stem auger and split-spoon sampler. Geotechnical sample will be obtained from this borings. Upon completion, the bore holes will be abandoned in accordance with d. C ddoe requirements within 24 hours. The borings diameter will be six inches. Borings will be abandoned with bentonite slurry in accordance with ddoe-wqd requirements -two pounds of bentonite to one-gallon water- within two hour completion. Sealing materials will be introduces at the bottom of the borehole and placed progressively upward to within several inches of ground surface. The remain open portion of the boring will be closed with asphalt cold patch, as per site plans, dc well construction application, dc well schematic form, and work plan report for the bozzuto development company/tenleytown safeway
Date:  September 11, 2013
Contractor: Rps Inc

Client: Bozzuto Development Company. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300333
2013/09/1101004203 Davenport St Nw, Washington, Dc 20016Rps Inc
SCORE
89
Eight exploratory borings will be drilled to a depth of feet below existing ground surface part of a geotechnical investigation using hollow stem auger and split-spoon sampler. Geotechnical sample will be obtained from this borings. Upon completion, the bore holes will be abandoned in accordance with d. C ddoe requirements within 24 hours. The borings diameter will be six inches. Borings will be abandoned with bentonite slurry in accordance with ddoe-wqd requirements -two pounds of bentonite to one-gallon water- within two hour completion. Sealing materials will be introduces at the bottom of the borehole and placed progressively upward to within several inches of ground surface. The remain open portion of the boring will be closed with asphalt cold patch, as per site plans, dc well construction application, dc well schematic form, and work plan report for the bozzuto development company tenleytown safeway
Date:  September 11, 2013
Contractor: Rps, Inc

Client: Bozzuto Development Company. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300333
2013/09/110894203 Davenport St Nw, Washington, Dc 20016Rps, Inc
SCORE
93
Re-pipe existing ansul r-102 3-gallon commercial kitchen hood fire suppression system in order to provide proper protection for cooking equipment - hood is existing - safeway #1395
Date:  September 12, 2014

Client: Safeway Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1411924
2014/09/120934203 Davenport St Nw, Washington, Dc 20016Guardian Fire Protection Services,
SCORE
77
Type of boring: temporary geotechnical soil borings number of borings: 6 depth of borings: ft drilling method: 4. 25 inch hollow stem augers hole diameter: 5 inches abandonment method: tremie grouting with bentonite grout
Date:  May 20, 2015

Client: Georgetown Day School Poc: Rahel Rosner Jbg | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500303
2015/05/200774203 Davenport St Nw, Washington, Dc 20016Schnabel Engineering Poc: Eoin Durc
SCORE
59
The current proposed phase ii esa environmental sampling and testing investigation will include the use of a geoprobe for one day to perform soil borings (b-1 to b-10) that will be extended to approximate depths of feet, measurable groundwater, or refusal, whichever occurs first. Using decontaminated drilling and sampling equipment, soil samples will be collected on a continuous basis and field screened with a photo-ionization detector (pid) for volatile organic compounds (vocs). In addition, groundwater samples will be collected from two borings, which encounter groundwater, with disposable pvc piping via disposable tubing with a peristaltic pump. Soil investigative derived waste (idw) will be placed in a drum to be left on site until receipt of the environmental laboratory analysis. Assuming laboratory results meet acceptance criteria testing requirements, a vendor will collect and dispose of the drum and contents at a permitted facility. After sample collection, each boring will be
Date:  July 12, 2017
Contractor: Vimal Jha

Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700342
2017/07/120594203 Davenport St Nw, Washington, Dc 20016Vimal Jha
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.