Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Complete second floor bathroom renovation, remove plaster, tiles, and plumbing fixtures; replace (3) windows; no structural work Parcel: 34038 0003 | |||||
SCORE 69 Install 3 supply, 3 return vents. New 3rd floor attic conversion, added to existing duct system, use r-8 insulated flex and sealed at duct connections Parcel: 34038 0003 | |||||
SCORE 89 Finish a portion of existing attic & add dormer per plan. Parcel: 34038 0003 |