Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 New 2-story sfd with 4 bedrooms, 2. 75 baths, 1 bath rough in, and 3 car attached garage. House to include 2738 square feet of finished area, 914 square foot unfinished basement, 676 square foot garage, 115 square foot porch, 258 square foot patio, and 98 square foot balcony. Includes mep. Client: Developmen Mgk | Applicant: Markel Homes Construction Co | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Set 3 4inch meter pit, associated with building permit pmt2014-02784 Date: February 5, 2015 Contractor: Eba Inc Client: Developmen Mgk | Applicant: Eba Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Installation of 3 kw, rooftop, flushmounted, grid tied, photovoltaic solar energy system on residence. Client: Carey Mason | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 24, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-00566 | |||||
SCORE 95 New 2-story sfd with 4 bedrooms, 2. 75 baths, 1 bath rough in, and 3 car attached garage. House to include 2738 square feet of finished area, 914 square foot unfinished basement, 676 square foot garage, 115 square foot porch, 258 square foot patio, and 98 square foot balcony. Includes mep. Client: Developmen Mgk | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Co | Current use: Single family detached dwelling, new, ga | Permit id: Pmt2014-02784 | |||||
SCORE 59 First time basement finish (827 s. F.). Scope includes creating (2) bedrooms and (1) full bathroom (using existing rough-ins), and family room. Scope includes mechanical, electrical, and plumbing. Client: Carey Mason | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Single family detached dwelling, remodel | Permit id: Pmt2017-01572 |