Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 Soil boring up to a maximum depth of 12 feet. Client: Mass Audubon Society | Permit type: Excavation borings test pits | Permit status: Open | Current use: Other | Permit id: Sf696905 | Parcel: 1405198010 | |||||
SCORE 69 A temporary (two years);greenhouse will be erected at the city of boston composting site. The 28 square ft greenhouse is a heavy duty commercial kit-type structure is made of 1. 9" galvanized steel tubing it is coverered with a 6 mil greenhouse film glazing. The steel frame is bolted to and anchored by a continuous line of pre-cast concrete traffic barriers on each side along the length of the greenhouse. The greenhouse will be heated with composting organic materials and ventilated with roll-up sidewalls. Doors will be installed on each end of the greenhouse. Client: Mass Audubon Society | Permit type: New construction | Permit status: Expired | Current use: Mixed | Permit id: U49478253 | Parcel: 1405198010 |