Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 91 The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 5 7 15: plan change -- conduit route change; see c of a... Vmt Date: April 14, 2015 Contractor: Khoi Nguyen Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: June 8, 2015 | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 5/7/15 plan change -- conduit route change; see c of a... Vmt Date: April 14, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 8, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 5 7 15 plan change -- conduit route change; see c of a... Vmt Date: April 14, 2015 Contractor: Verengo Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 8, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: June 5, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |