Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Repair rases of pf existing exterior columns on front porch, non structural trim facade portions. R-2 sfd in hist dist. Gs teb. Date: November 3, 2009 Contractor: Stephen F Atkinbarnard Residence Permit status: In progress | Completion date: November 3, 2009 | Current use: Residential | Permit id: Bld2009-06757 | |||||
SCORE 59 Interior demo only to explore for waht work needs to be done, r-2 sfd, hist dist. Ju Date: March 6, 2013 Contractor: Lee, Clifflee Residence Permit status: In progress | Completion date: March 6, 2013 | Current use: Residential | Permit id: Bld2013-01295 | |||||
SCORE 64 Relocate upstairs bathroom from east side of house to south side of house on same level. Move drain and water lines for bathroom. Run new 3" drain line with floor joists because floor joists not large enough to drill through. Date: April 24, 2013 Contractor: Kevin Darby Plumbing And Heating Inclee Remodel Permit type: Plumbing | Permit status: Completed | Completion date: April 25, 2013 | Current use: Residential | Permit id: Bld2013-02561 | |||||
SCORE 64 Electrical work up to 10,000. Job bid 5,500. Int remodel of 2nd floor, move bath, rewire, new plmbg, insulation, sheetrock flooring & paint, no exterior work, r-2 sfd, int remodel of 2nd floor, no ext work in historic j. U. Date: April 17, 2013 Contractor: Chesley Electric Inccliff Lee Permit type: Electrical | Permit status: Accepted | Completion date: April 17, 2013 | Current use: Residential | Permit id: Bld2013-02336 | |||||
SCORE 64 Applicant states recently purchased home int remodel of 2nd floor, move bath, rewire, new plmbg, insulation, sheetrock flooring & paint, no exterior work, r-2 sfd, int remodel of 2nd floor, no ext work in historic j. U. Date: April 5, 2013 Contractor: Cliff Leecliff Lee Permit status: Accepted - standard | Completion date: April 5, 2013 | Current use: Residential | Permit id: Bld2013-02040 |