Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Units a, b, c, d. Total tear-off & reroof of mfd, 43 squares of asphalt shingles on a pitch represented as 5 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Roxanne Royce | Permit type: Roofing | Permit status: Cmp | Completion date: October 19, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-04523 |