Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Install 29 new services at 408-418 "k" street, 908, 9 & 946-952 4th street; 409-421 "i" street, 901, 907-911 5th street, s. E., also install 615 mainline conduit, 7 manholes; sidewalk of 4th and 5th streets between "i" and "k" streets, s. E. As indicated on the previously approved prints. Wr #832698 cut #25954 (rja) tcp #s 2 & 3 ![]() ![]() Client: Pepco | Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation, excavation; multiple house connections (utility co. Only) | Permit status: Cancel/withdrawn | Expiration date: April 14, 2010 | |||||
SCORE 95 Excavation; electric ml conduit (trench), excavation; manhole installation, excavation; multiple house connections (utility co. Only) ![]() Permit status: 3 | Expiration date: April 14, 2010 | Permit id: 0 | |||||
SCORE 95 Excavation; electric ml conduit (trench), excavation; manhole installation, excavation; multiple house connections (utility co. Only) ![]() Permit status: 3 | Expiration date: April 14, 2010 | Permit id: 0 |