Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Changing from propane to natural gas, install gas line and meter Date: April 15, 2015 Permit type: Plumbing : 80 - acc | Permit status: Permit issued | Permit id: Pds2015-Resalt- | |||||
SCORE 99 The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 5, 2014 Contractor: Daniel Sullivan Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: September 30, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd with existing residential main electrical service of 225a and misc. Elec charge for 100a new sub panel w relocated loads - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 5, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 30, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd with existing residential main electrical service of 225a and misc. Elec charge for 100a new sub panel w relocated loads - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 5, 2014 Contractor: Sullivan Solar Power Of California Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 30, 2014 | Permit id: Pds2014-Resalt- | |||||
Rough plumbing Date: November 4, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: September 25, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- |