Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: November 9, 2012 Client: Mobley Regina | Permit status: Completed | Permit id: 437097 | |||||
Electrical permit Date: July 19, 2012 Client: Mobley Regina | Permit status: Completed | Permit id: 416607 | |||||
Alteration permit Date: November 9, 2012 Client: Mobley Regina | Permit status: Completed | Permit id: 437097 | |||||
Electrical permit Date: July 19, 2012 Client: Mobley Regina | Permit status: Completed | Permit id: 416607 | |||||
SCORE 93 Rough in new pvc drains 4" main drain with 3" pvc for stacks 3" for toilets & 1 1 2 for a small wastes. Date: September 6, 2017 Contractor: Michael Fugarino Client: Mobley Regina | Permit type: Plumbing permit | Permit status: Active | Completion date: September 14, 2017 | Permit id: 813976 | |||||
SCORE 93 Remove and replace roof covering Date: November 9, 2012 Contractor: L Pepe Contractors Inc Client: Mobley Regina | Permit type: Alteration permit | Permit status: Completed | Completion date: February 14, 2013 | Permit id: 437097 | |||||
SCORE 100 Electrical alterations (throughout) phdc - 100amp service (20)space panel, (3)basement lights, replace (8)switches, replace (15)outlets, 2(20)amp circuits and 4(15)amp circuits - work will comply with the 2008 nec Date: July 19, 2012 Contractor: Jdv Electrical Contractors Client: Mobley Regina | Permit type: Electrical permit | Permit status: Completed | Completion date: August 24, 2012 | Permit id: 416607 | |||||
SCORE 89 Ez permit standard -masonry facade- for removal and replacement of masonry facade, on an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 1, 2017 Contractor: Gentile Contractors Inc Client: Mobley Regina | Permit type: Alteration permit | Permit status: Active | Completion date: August 19, 2017 | Permit id: 804603 | |||||
SCORE 59 Interior alterations to include drywall, sheet rock throughout the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work Date: August 1, 2017 Contractor: East Coast Custom Build Llc Client: Mobley Regina | Permit type: Alteration permit | Permit status: Active | Completion date: September 27, 2017 | Permit id: 803630 | |||||
SCORE 100 Install 150amp service line, replace panel, meter box and wire throughout as per nec 2008 south district Date: September 25, 2017 Contractor: Franks Home Repair Client: Mobley Regina | Permit type: Electrical permit | Permit status: Active | Completion date: September 25, 2017 | Permit id: 818737 | |||||
SCORE 100 Install ductwork as per code, install 95% furnace, 2 ton a c. Date: October 18, 2017 Contractor: Milmar Hvac Client: Mobley Regina | Permit type: Mechanical permit | Permit status: Active | Completion date: October 18, 2017 | Permit id: 824864 |