Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Re-roof including removal of existing shakes and installation of a standing-seam metal roof (color = "hemlock" to match the adjacent buildings roof) per the lpab approval. Squares on a 9 12 and 3 12 pitch. Date: July 7, 2004 Contractor: Sergios Roofing Client: David Corman | Applicant: Sergios Roofing | Permit type: Roofing | Permit status: N&v | Current use: Single family d | |||||
SCORE 95 Replacement low pressure boiler Date: November 11, 2003 Contractor: Precision Plumbing And Heating Client: David Corman | Applicant: Precision Plumbing & Heating | Permit type: Mechanical | Permit status: Cmp | Completion date: May 27, 2008 | Current use: Single family d | |||||
SCORE 100 Renew gas service Date: November 26, 2012 Contractor: Xcel Energy Client: David Corman | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | Current use: Single family a | |||||
SCORE 100 Interior remodel to existing sfd. Scope of work includes first floor and second floor structural work as delineated on attached plan set, as well as reduction in height of existing glass windows in atrium, with new windows to be installed (see attached cut sheet for u-rating). Includes minor electrical rewiring, and replacement gas fireplace (with small gas piping run). Client: David Corman | Applicant: One Call Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 17, 2014 | Current use: Single family d | |||||
SCORE 100 Interior remodel to existing sfd. Scope of work includes first floor and second floor structural work as delineated on attached plan set, as well as reduction in height of existing glass windows in atrium, with new windows to be installed (see attached cut sheet for u-rating). Includes minor electrical rewiring, and replacement gas fireplace (with small gas piping run). Client: David Corman | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: December 17, 2014 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2014-05098 | |||||
Renew gas service Date: November 26, 2012 Client: David Corman | Permit type: Right-of-way | Permit status: Iss | Current use: Single family attached dwelling | Permit id: Pmt2012-05567 | |||||
SCORE 95 Replacement low pressure boiler Client: David Corman | Permit type: Mechanical | Permit status: Cmp | Completion date: May 27, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2003-20147 | |||||
SCORE 100 Re-roof including removal of existing shakes and installation of a standing-seam metal roof (color = inchhemlockinch to match the adjacent buildingfoots roof) per the lpab approval. Squares on a 9 12 and 3 12 pitch. Client: David Corman | Permit type: Roofing | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-02631 |