Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Hall bath renovation project. We propose to replace existing tub with standup shower. We will shift the location of the current window to the exterior and the location of the current interior door. Plumbing fixtures will not change locations. Add some lighting. Inspections needed: framing plumbing rough-in electrical rough-in final . Remains single family residence. No increase to building footprint. Subject to inspectors approval. Mhzc must review application. Pursuant to ordinance no. 2006-1263 of the metropolitan code of laws, i (the holder on this permit) hereby certify that all construction and demolition waste generated by any and all activities governed by this permit shall be disposed of in an approved landfill. Further, i certify that no construction and demolition waste shall be stored on the property in violation of any provision of the metropolitan code. Permit type: Building residential - rehab | Permit id: 201525913 | Parcel: 10308022600 |