Building Permits at 4 Wabon St Dorchester MA 02121


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 4 Wabon St Dorchester MA 02121 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
98
Apt#1 replace existing kitchen cabinets counter sink faucet stove and dishwasher with new ones. Replace bathroom vanity sink faucet med cabinet and toilet with new ones. Apt#2 replace kitchen cabinets counter sink faucet stove and dishwasher with new ones. Replace bathroom vanity sink faucet med cab
Date:  March 3, 2011
Value:   $25,000
Contractor: Robert Finch

Client: Finch Robert | Permit type: Renovations -interio | Current use: 1-2fam | Permit id: Sf65590 | Parcel: 1202096000
2011/03/0325000984 Wabon St Boston Ma 02121Robert Finch
SCORE
98
Replace switches and overhead lights kitchen bathroom hallway liv room and 2 bedrooms. Add fan and gfi to bathroom. Add recessed lighting gfi line for dishwasher 6 outlets and switches in 2nd floor apt kitchen. (all work done in apt#2). Install recessed lighting in living room and 2 bedrooms. Totals = 28 recessed 6 regular opverhead lights 25 outlets 11 switches 1 dishwasher and 1 disposal.
Date:  May 23, 2011
Value:   $3,500
Contractor: Robert Finch

Permit type: Electrical | Permit status: Expired | Current use: 1-2fam | Permit id: E78222 | Parcel: 1202096000
2011/05/233500984 Wabon St Dorchester Ma 02121Robert Finch
SCORE
98
Istall 21 lights 3 outlets switches in 3rd floor bedrooms and bathroom.
Date:  June 10, 2011
Value:   $2,500
Contractor: Robert Finch

Permit type: Electrical | Permit status: Expired | Current use: 1-2fam | Permit id: E81140 | Parcel: 1202096000
2011/06/102500984 Wabon St Dorchester Ma 02121Robert Finch
SCORE
98
Replace switches and overhead lights kitchen bathroom hallway liv room and 2 bedrooms. Add fan and gfi to bathroom. Add recessed lighting gfi line for dishwasher 6 outlets and switches in 1st floor apt kitchen. (all work done in apt#1)
Date:  March 24, 2011
Value:   $2,200
Contractor: Robert Finch

Permit type: Electrical | Permit status: Expired | Current use: 1-2fam | Permit id: E69419 | Parcel: 1202096000
2011/03/242200984 Wabon St Dorchester Ma 02121Robert Finch
SCORE
98
Install smokes/cos in common/bedrooms
Date:  June 10, 2011
Value:   $500
Contractor: Robert Finch

Permit type: Fire alarm | Permit status: Expired | Current use: 1-2fam | Permit id: Efa81141 | Parcel: 1202096000
2011/06/10500984 Wabon St Dorchester Ma 02121Robert Finch
To remove asbestos from 4 wabon street dorchester
Date:  March 2, 2011

Permit status: Na | Permit id: Asb66070 | Parcel: 1202096000
2011/03/020954 Wabon St Dorchester Ma 02121
SCORE
98
Install 4 smoke detectors
Date:  March 24, 2011
Value:   $200
Contractor: Wendell Anderson

Permit type: Fire alarm | Permit status: Expired | Current use: 1-2fam | Permit id: Efa69420 | Parcel: 1202096000
2011/03/24200984 Wabon St Dorchester Ma 02121Wendell Anderson
SCORE
98
Alerting devices on 2nd floor
Date:  May 23, 2011
Value:   $250
Contractor: Robert Finch

Permit type: Electrical | Permit status: Expired | Current use: 1-2fam | Permit id: Efa78226 | Parcel: 1202096000
2011/05/23250984 Wabon St Dorchester Ma 02121Robert Finch
SCORE
100
Plumbing permit
Date:  February 22, 2012
Value:   $2,000
Contractor: Venard Harrell

Client: Finch Robert J | Permit type: Plumbing | Permit status: Expired | Current use: 1-2fam | Permit id: Pl120635 | Parcel: 1202096000
2012/02/2220001004 Wabon St Dorchester Ma 02121Venard Harrell
SCORE
98
Convert large third floor closet to a 3 4 bathroom. Run piping and wiring to accomodate a new vanity toilet and shower stall. Install a dormer to level and increase ceiling height.
Date:  June 2, 2011
Value:   $6,000
Contractor: Robert Finch

Client: Finch Robert J | Permit type: Interior/exterior work | Permit status: Expired | Current use: 1-2fam | Permit id: Alt75384 | Parcel: 1202096000
2011/06/026000984 Wabon St Dorchester Ma 02121Robert Finch
SCORE
91
Move kitchen sink and dishwasher on 1st and 2nd floor apts. Replace sink toilet and shower valve in bathrooms of 1st and 2nd floor apts. Run piping to install a new 3 4 bath - sink toilet and shower stall on 3d floor.
Date:  April 9, 2014
Value:   $7,000
Contractor: Thomas Hoyle

Client: Finch Robert J | Permit type: Plumbing | Permit status: Expired | Current use: 1-2fam | Permit id: Pl350173 | Parcel: 1202096000
2014/04/097000914 Wabon St Dorchester Ma 02121Thomas Hoyle
SCORE
100
Installing bathroom and kitchen
Date:  April 27, 2011
Value:   $7,000
Contractor: Venard Harrell

Client: Finch Robert J | Permit type: Plumbing | Current use: 1-2fam | Permit id: Pl74131 | Parcel: 1202096000
2011/04/2770001004 Wabon St Dorchester Ma 02121Venard Harrell
SCORE
100
Finish electrical work trims and plates
Date:  December 21, 2012
Value:   $500
Contractor: Emerson Andrews

Client: Finch Robert J | Permit type: Electrical | Current use: 1-2fam | Permit id: E210036 | Parcel: 1202096000
2012/12/215001004 Wabon St Dorchester Ma 02121Emerson Andrews
SCORE
100
Installing stove
Date:  April 27, 2011
Value:   $500
Contractor: Venard Harrell

Client: Finch Robert J | Permit type: Gas | Current use: 1-2fam | Permit id: G74133 | Parcel: 1202096000
2011/04/275001004 Wabon St Dorchester Ma 02121Venard Harrell
SCORE
98
Apt#1 replace existing kitchen cabinets counter sink faucet stove and dishwasher with new ones. Replace bathroom vanity sink faucet med cabinet and toilet with new ones. Apt#2 replace kitchen cabinets counter sink faucet stove and dishwasher with new ones. Replace bathroom vanity sink faucet med cabinet toilet and tub with new ones. Repair patch sand prime and paint ceilings and walls as needed. Install tile floors in both kitchens and apt#2 bath. Basement - have asbestos pipe covering removed as needed.
Date:  March 3, 2011
Value:   $25,000
Contractor: Robert Finch

Client: Finch Robert J | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: 1-2fam | Permit id: Sf65590 | Parcel: 1202096000
2011/03/0325000984 Wabon St Dorchester Ma 02121Robert Finch
SCORE
98
Replace switches and overhead lights kitchen bathroom hallway liv room and 2 bedrooms. Add fan and gfi to bathroom. Add recessed lighting gfi line for dishwasher 6 outlets and switches in 2nd floor apt kitchen. (all work done in apt#2). Install recessed lighting in living room and 2 bedrooms. Totals = 28 recessed 6 regular opverhead lights 25 outlets 11 switches 1 dishwasher and 1 disposal.
Date:  May 23, 2011
Value:   $3,500
Contractor: Robert Finch

Client: Finch Robert | Permit type: Electrical permit | Expiration date: November 23, 2011 | Current use: 1-2fam | Permit id: E78222 | Parcel: 1202096000
2011/05/233500984 Wabon St Dorchester MaRobert Finch
SCORE
98
Istall 21 lights 3 outlets switches in 3rd floor bedrooms and bathroom.
Date:  June 10, 2011
Value:   $2,500
Contractor: Robert Finch

Client: Finch Robert | Permit type: Electrical permit | Expiration date: December 10, 2011 | Current use: 1-2fam | Permit id: E81140 | Parcel: 1202096000
2011/06/102500984 Wabon St Dorchester MaRobert Finch
SCORE
98
Replace switches and overhead lights kitchen bathroom hallway liv room and 2 bedrooms. Add fan and gfi to bathroom. Add recessed lighting gfi line for dishwasher 6 outlets and switches in 1st floor apt kitchen. (all work done in apt#1)
Date:  March 24, 2011
Value:   $2,200
Contractor: Robert Finch

Client: Finch Robert | Permit type: Electrical permit | Expiration date: September 24, 2011 | Current use: 1-2fam | Permit id: E69419 | Parcel: 1202096000
2011/03/242200984 Wabon St Dorchester MaRobert Finch
SCORE
100
Installing bathroom and kitchen
Date:  April 27, 2011
Value:   $7,000
Contractor: Venard Harrell

Client: Finch Robert | Permit type: Plumbing permit | Expiration date: October 27, 2011 | Current use: 1-2fam | Permit id: Pl74131 | Parcel: 1202096000
2011/04/2770001004 Wabon St Dorchester MaVenard Harrell
Bfd smoke/co inspection and
Date:  November 3, 2015

Client: Finch Robert | Expiration date: January 2, 2016 | Current use: 2unit | Permit id: Smk532713 | Parcel: 1202096000
2015/11/030954 Wabon St Dorchester Ma
SCORE
100
Full bathroom
Date:  February 22, 2012
Value:   $2,000
Contractor: Venard Harrell

Client: Finch Robert | Permit type: Plumbing permit | Expiration date: August 22, 2012 | Current use: 1-2fam | Permit id: Pl120635 | Parcel: 1202096000
2012/02/2220001004 Wabon St Dorchester MaVenard Harrell
SCORE
98
Apt#1 replace existing kitchen cabinets counter sink faucet stove and dishwasher with new ones. Replace bathroom vanity sink faucet med cabinet and toilet with new ones. Apt#2 replace kitchen cabinets counter sink faucet stove and dishwasher with new ones. Replace bathroom vanity sink faucet med cabinet toilet and tub with new ones. Repair patch sand prime and paint ceilings and walls as needed. Install tile floors in both kitchens and apt#2 bath. Basement - have asbestos pipe covering removed as needed.
Date:  March 3, 2011
Value:   $25,000
Contractor: Robert Finch

Client: Finch Robert | Permit type: Short form bldg permit | Expiration date: September 3, 2011 | Current use: 1-2fam | Permit id: Sf65590 | Parcel: 1202096000
2011/03/0325000984 Wabon St Dorchester MaRobert Finch
SCORE
100
Finish electrical work trims and plates
Date:  December 21, 2012
Value:   $500
Contractor: Emerson Andrews

Client: Finch Robert | Permit type: Electrical permit | Expiration date: June 21, 2013 | Current use: 1-2fam | Permit id: E210036 | Parcel: 1202096000
2012/12/215001004 Wabon St Dorchester MaEmerson Andrews
SCORE
100
Installing stove
Date:  April 27, 2011
Value:   $500
Contractor: Venard Harrell

Client: Finch Robert | Permit type: Gas permit | Expiration date: October 27, 2011 | Current use: 1-2fam | Permit id: G74133 | Parcel: 1202096000
2011/04/275001004 Wabon St Dorchester MaVenard Harrell
To remove asbestos from 4 wabon street dorchester
Date:  March 2, 2011

Client: Finch Robert | Permit type: Bfd asbestos removal | Permit id: Asb66070 | Parcel: 1202096000
2011/03/020954 Wabon St Dorchester Ma
SCORE
98
Install 4 smoke detectors
Date:  March 24, 2011
Value:   $200
Contractor: Wendell Anderson

Client: Finch Robert | Permit type: Electrical fire alarms | Expiration date: September 24, 2011 | Current use: 1-2fam | Permit id: Efa69420 | Parcel: 1202096000
2011/03/24200984 Wabon St Dorchester MaWendell Anderson
SCORE
98
Alerting devices on 2nd floor
Date:  May 23, 2011
Value:   $250
Contractor: Robert Finch

Client: Finch Robert | Permit type: Electrical fire alarms | Expiration date: November 23, 2011 | Current use: 1-2fam | Permit id: Efa78226 | Parcel: 1202096000
2011/05/23250984 Wabon St Dorchester MaRobert Finch
SCORE
98
Install smokes/cos in common/bedrooms
Date:  June 10, 2011
Value:   $500
Contractor: Robert Finch

Client: Finch Robert J | Permit type: Electrical fire alarms | Expiration date: December 10, 2011 | Current use: 1-2fam | Permit id: Efa81141 | Parcel: 1202096000
2011/06/10500984 Wabon St Dorchester MaRobert Finch
SCORE
91
Move kitchen sink and dishwasher on 1st and 2nd floor apts. Replace sink toilet and shower valve in bathrooms of 1st and 2nd floor apts. Run piping to install a new 3/4 bath - sink toilet and shower stall on 3d floor.
Date:  April 9, 2014
Value:   $7,000
Contractor: Thomas Hoyle

Client: Finch Robert J | Permit type: Plumbing permit | Expiration date: October 9, 2014 | Current use: 1-2fam | Permit id: Pl350173 | Parcel: 1202096000
2014/04/097000914 Wabon St Dorchester MaThomas Hoyle
SCORE
98
Convert large third floor closet to a 3/4 bathroom. Run piping and wiring to accomodate a new vanity toilet and shower stall. Install a dormer to level and increase ceiling height.
Date:  June 2, 2011
Value:   $6,000
Contractor: Robert Finch

Client: Finch Robert J | Permit type: Long form/alteration permit | Expiration date: December 2, 2011 | Current use: 1-2fam | Permit id: Alt75384 | Parcel: 1202096000
2011/06/026000984 Wabon St Dorchester MaRobert Finch
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.