Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Used mh to lot ![]() Permit status: Closed | Permit id: 09-03729 | |||||
SCORE 84 Used mh to lot Client: Used Mh To Lot | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-03729 | Parcel: 95781 | |||||
SCORE 95 Used mh to lot Client: Used Mh To Lot | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-03729 | Parcel: 95781 | |||||
SCORE 100 Used mh to lot Client: Used Mh To Lot | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-03729 | Parcel: 95781 | |||||
July 27, 2009 11:34:52 am kneel. Used mh to lot location: airport rd to wellington mh park.; august 11, 2009 11:48:45 am heatherr. Rec. Amendment to remove mechanical due to no mechanical work was done.; august 18, 2009 12:20:52 pm cbeavers. Premise # redacted phone number0; january 20, 20 10:01:39 am kneel. Used mh to lot; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck Permit type: Permits - historical | Permit status: Closed | Permit id: 09-03729 | Parcel: 95781 | |||||
Used mh to lot ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 09-03729 | |||||
July 27, 2009 11:34:52 am kneel. Used mh to lot location: airport rd to wellington mh park.; august 11, 2009 11:48:45 am heatherr. Rec. Amendment to remove mechanical due to no mechanical work was done.; august 18, 2009 12:20:52 pm cbeavers. Premise # redacted phone number0; january 20, 20 10:01:39 am kneel. Used mh to lot; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 09-03729 | Parcel: 95781 |