Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install power for elect. Gate Date: March 28, 2016 Contractor: Precision Electrical Systems Inc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-02828 | |||||
SCORE 59 Set two oil tanks. The tanks are double walled. One oil tank for new oil and one tank for waste oil. Mount pumps into tanks. Install tank alarm on waste oil tank to stop the tank from being over filled. Inch meters installed in both tanks to indicate oil quantity in oil tanks. Run oil line to to two banks of reels. Each bank of reel has one oil reel, one air reel, and one light reel. Run airline to oil pumps, two air reels, and 8 air outlets. Run oil line from waste oil pump to inlet for oil caddies. Run airline to two automotive hoists. Install gate in fencing for vehicle access. Note: this submittal does not include tenant improvement, submitted plans only appear to address exterior equipment. Date: March 24, 2016 Contractor: Mcgee Company Permit status: Inspections | Permit id: Bld2016-01724 | |||||
SCORE 70 Install power for elect. Gate Date: March 28, 2016 Contractor: Precision Electrical Systems, Inc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-02828 |