Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: June 16, 2016 Client: Oap Inc | Permit status: Active | Permit id: 676248 | |||||
Suppression permit Date: May 3, 2016 Client: Oap Inc | Permit status: Active | Permit id: 688966 | |||||
New construction permit Date: March 13, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 474791 | |||||
Zoning admin review Date: May 6, 2013 Client: Oap Inc | Permit status: Expired | Permit id: 468615 | |||||
Plumbing permit Date: June 3, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 540543 | |||||
Demolition permit Date: November 13, 2013 Client: Oap Inc | Permit status: Completed | Permit id: 499701 | |||||
Demolition permit Date: October 30, 2008 Client: Oap Inc | Permit status: Expired | Permit id: 182935 | |||||
Electrical permit Date: July 3, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 538609 | |||||
Alteration permit Date: March 24, 2016 Client: Oap Inc | Permit status: Active | Permit id: 660558 | |||||
Suppression permit Date: December 2, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 566569 | |||||
Zoning permit Date: September 4, 2009 Client: Oap Inc | Permit status: Completed | Permit id: 167635 | |||||
Use permit Date: November 5, 2015 Client: Oap Inc | Permit status: Completed | Permit id: 650356 | |||||
Zoning/use permit Date: October 30, 2008 Client: Oap Inc | Permit status: Completed | Permit id: 182932 | |||||
Mechanical permit Date: July 10, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 540777 | |||||
Mechanical permit Date: September 26, 2016 Client: Oap Inc | Permit status: Active | Permit id: 723204 | |||||
Zoning/use permit Date: November 2, 2009 Client: Oap Inc | Permit status: Completed | Permit id: 243623 | |||||
Use permit Date: November 2, 2009 Client: Oap Inc | Permit status: Completed | Permit id: 243621 | |||||
Zoning/use permit Date: August 16, 2013 Client: Oap Inc | Permit status: Completed | Permit id: 462784 | |||||
Plumbing permit Date: June 13, 2016 Client: Oap Inc | Permit status: Active | Permit id: 676272 | |||||
Permit for the relocation of lot lines to create two (2) lots from four (4) lots (3939-3945 chestnut st). For the creation of a unity of use to create one (1) lot for zoning purposes with restrictive covenants, agreements and easements to be recorded by deed to bind current and future owners of the contiguous two (2) parcels to preserve the unity of use and the legality of the entire project that stems from single zoning lot treatment. Prior to issuance of certificate of occupancy, proof of redecoration of easements, agreements and restrictive covenants must be supplied. For the demolition of existing structures and for the erection of an eight (8) story addition to an existing nine (9) story structure. For vacant commercial space on the first and second floors (use registration required prior to occupancy) and for one hundred fifty-six (156) dwelling units on the third thought ninth floors in the same building with uses as previously approved. Size and location as shown in the applica Date: August 18, 2008 Client: Oap Inc | Applicant: Arthur Haywood, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 27, 2008 | Permit id: 6719 | |||||
Permit for the complete demolition of one (1) existing structure and for the erection of a semi-detached structure on the same lot with an existing semi-detached structure. Proposed structure to be used as vacant commercial/retail space on the 1st and 2nd floors (use registration permit required prior to occupancy) and multi-family household living (with sixty-five (65) dwelling units) on the 3rd through 7th floors, the existing structure to remain as a sit-down restaurant, hair salon/beauty school, a yoga studio (personal services), and one-hundred one (101) dwelling units. Size and location as shown on plans. Date: July 1, 2013 Client: Oap Inc | Applicant: Peter F. Kelsen, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: August 13, 2013 | Permit id: 20820 | |||||
On 2/18/2016,the department of licenses and inspections issued a notice of refusal for application #660558. Date: February 19, 2016 Client: Oap Inc | Applicant: Jackson Fu | Permit type: Appeal | Permit status: Approved | Permit id: 27057 | |||||
On 10/20/ the department of licenses and inspections issues a notice of refusal for application #305144. Date: October 25, 2010 Client: Oap Inc | Applicant: Robert Hoe | Permit type: Appeal | Permit status: Approved | Completion date: November 22, 2010 | Permit id: 13689 | |||||
Demolition permit Date: November 13, 2013 Client: Oap, Inc. | Permit status: Completed | Permit id: 499703 | |||||
Zoning/use permit Date: October 30, 2008 Client: Oap, Inc. | Permit status: Completed | Permit id: 182936 | |||||
Demolition permit Date: October 30, 2008 Client: Oap, Inc. | Permit status: Expired | Permit id: 182937 | |||||
Zoning permit Date: September 4, 2009 Client: Oap, Inc. | Permit status: Completed | Permit id: 235611 | |||||
Electrical permit Date: July 15, 2016 Client: Oap Inc | Permit status: Completed | Permit id: 700349 | |||||
Electrical permit Date: October 24, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 563304 | |||||
Alteration permit Date: March 24, 2016 Client: Oap Inc | Permit status: Completed | Permit id: 660558 | |||||
Demolition permit Date: November 13, 2013 Client: Oap Inc | Permit status: Completed | Permit id: 499701 | |||||
Suppression permit Date: December 2, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 566569 | |||||
Zoning permit Date: September 4, 2009 Client: Oap Inc | Permit status: Completed | Permit id: 167635 | |||||
Zoning admin review Date: May 6, 2013 Client: Oap Inc | Permit status: Expired | Permit id: 468615 | |||||
Zoning use permit Date: October 28, 2016 Client: Oap Inc | Permit status: Completed | Permit id: 705477 | |||||
Mechanical permit Date: July 10, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 540777 | |||||
Suppression permit Date: May 3, 2016 Client: Oap Inc | Permit status: Completed | Permit id: 688966 | |||||
Administrative permit Date: December 14, 2016 Client: Oap Inc | Permit status: Completed | Permit id: 696734 | |||||
Use permit Date: November 2, 2009 Client: Oap Inc | Permit status: Completed | Permit id: 243621 | |||||
Plumbing permit Date: June 3, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 540543 | |||||
Use permit Date: November 5, 2015 Client: Oap Inc | Permit status: Completed | Permit id: 650356 | |||||
Zoning use permit Date: October 30, 2008 Client: Oap Inc | Permit status: Completed | Permit id: 182932 | |||||
New construction permit Date: March 13, 2014 Client: Oap Inc | Permit status: Completed | Permit id: 474791 | |||||
Zoning use permit Date: November 2, 2009 Client: Oap Inc | Permit status: Completed | Permit id: 243623 | |||||
Zoning use permit Date: August 16, 2013 Client: Oap Inc | Permit status: Completed | Permit id: 462784 | |||||
Demolition permit Date: October 30, 2008 Client: Oap Inc | Permit status: Expired | Permit id: 182935 | |||||
Mechanical permit Date: July 6, 2016 Client: Oap Inc | Permit status: Completed | Permit id: 702711 | |||||
Plumbing permit Date: June 13, 2016 Client: Oap Inc | Permit status: Completed | Permit id: 676272 | |||||
Sign permit Date: October 28, 2016 Client: Oap Inc | Permit status: Completed | Permit id: 705903 | |||||
Permit for the complete demolition of one (1) existing structure and for the erection of a semi-detached structure on the same lot with an existing semi-detached structure. Proposed structure to be used as vacant commercial retail space on the 1st and 2nd floors (use registration permit required prior to occupancy) and multi-family household living (with sixty-five (65) dwelling units) on the 3rd through 7th floors, the existing structure to remain as a sit-down restaurant, hair salon beauty school, a yoga studio (personal services), and one-hundred one (101) dwelling units. Size and location as shown on plans. Date: July 1, 2013 Client: Oap Inc | Applicant: Peter F. Kelsen, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: August 13, 2013 | Permit id: 20820 | |||||
Permit for the relocation of lot lines to create two (2) lots from four (4) lots (3939-3945 chestnut st). For the creation of a unity of use to create one (1) lot for zoning purposes with restrictive covenants, agreements and easements to be recorded by deed to bind current and future owners of the contiguous two (2) parcels to preserve the unity of use and the legality of the entire project that stems from single zoning lot treatment. Prior to issuance of certificate of occupancy, proof of redecoration of easements, agreements and restrictive covenants must be supplied. For the demolition of existing structures and for the erection of an eight (8) story addition to an existing nine (9) story structure. For vacant commercial space on the first and second floors (use registration required prior to occupancy) and for one hundred fifty-six (156) dwelling units on the third thought ninth floors in the same building with uses as previously approved. Size and location as shown in the applica Date: August 18, 2008 Client: Oap Inc | Applicant: Arthur Haywood, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 27, 2008 | Permit id: 6719 | |||||
On 10 20 the department of licenses and inspections issues a notice of refusal for application #305144. Date: October 25, 2010 Client: Oap Inc | Applicant: Robert Hoe | Permit type: Appeal | Permit status: Approved | Completion date: November 22, 2010 | Permit id: 13689 | |||||
On 2 18 2016,the department of licenses and inspections issued a notice of refusal for application #660558. Date: February 19, 2016 Client: Oap Inc | Applicant: Jackson Fu | Permit type: Appeal | Permit status: Approved | Permit id: 27057 | |||||
SCORE 100 Service for temporary power for construction site (site work) Date: July 3, 2014 Contractor: Michael Kowal Client: Ap Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 1, 2014 | Permit id: 547192 | |||||
SCORE 100 Wire to existing panels outlets and 1 lights per nec 2008 (west district) no fire alarm Date: June 16, 2016 Contractor: Dameon Carty Client: Ap Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 16, 2016 | Permit id: 676248 | |||||
SCORE 95 For the installation of a fire suppression system in accordance with nfpa 13 with 8 inch fire service line, fire pump, backflow prevention assembly and two (2) standpipe risers in new seven story building as per plans. Date: December 2, 2014 Contractor: Preferred Fire Protection Inc Client: Ap Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 566569 | |||||
SCORE 99 Ez standard kitchen fire suppression- for the installation of new wet chemical kitchen hood fire suppression system as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 6, 2016 Contractor: Reliable Fire Protection Inc Client: Ap Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: January 5, 2017 | Permit id: 705309 | |||||
SCORE 100 New 7 story apt bldg with 65 units and high voltage service per 2008 nec (apt bldg) Date: July 3, 2014 Contractor: Michael Kowal Client: Ap Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 538609 | |||||
SCORE 99 Installation of three (3) ul 7 listed commercial kitchen exhaust hoods with supply exhaust tie-in to one (1) return air fan, one (1) exhaust fan & all associated return exhaust ductwork for second floor restaurant as per approved plans. Separate permit shall be required for installation of an approved automatic fire supression system Date: July 6, 2016 Contractor: Reliable Fire Protection Inc Client: Ap Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 23, 2016 | Permit id: 702711 | |||||
SCORE 95 Installatiion of mechanicals (packaged terminal units, appliances, air handlers, etc), ductwork, grilles, registers, diffusers and fans including incidental work and fire life safety mechanical devices including fire dampers and sub-ducts. Code mechanical design professional: scott lawson, p. E. Furnish ptacs, furnish 14 grilles, registers and diffusers, furnish 1 rtu, furnish 5 fans Date: July 10, 2014 Contractor: Falasca Mechanical Inc Client: Ap Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 540777 | |||||
SCORE 100 Site work, lateral and 3 catch basins Date: June 3, 2014 Contractor: Harry Stuhl Iii Client: Ap Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 18, 2015 | Permit id: 540543 | |||||
SCORE 99 Erection of two (2) flatwall signs, and two window decal signs Date: October 28, 2016 Contractor: Reliable Fire Protection Inc Client: Ap Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 705477 | |||||
SCORE 100 Alteration: interior plumbing for a 2nd floor restaurant in a 8-story bldg. Will comply with the philadelphia plumbing code, 2004. Date: June 13, 2016 Contractor: Prompt Plumbing And Mechanical Client: Ap Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 23, 2016 | Permit id: 676272 | |||||
SCORE 100 Furnish and install new fire alarm system as per nfpa72 (west district) Date: October 24, 2014 Contractor: Michael Kowal Client: Ap Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 563304 | |||||
SCORE 100 Installation of new plumbing system to include wc,lav,tubs,showers and kitchen sinks (mixed use) Date: August 8, 2014 Contractor: E J Raith Mechanical Inc Client: Ap Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 539760 | |||||
For the complete demolition of commercial building vacant lot Date: October 30, 2008 Client: Ap Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 4, 2013 | Permit id: 182932 | |||||
Complete demolition of commercial building Date: October 30, 2008 Client: Ap Inc | Permit type: Demolition permit | Permit status: Expired | Completion date: October 1, 2009 | Permit id: 182935 | |||||
SCORE 100 For the complete demolition of an entire structure in accordance with code bulletin b-1302. All demolition work to be in accordance with approved plans and site safety plans. Date: November 13, 2013 Contractor: Jpc Group Inc Client: Ap Inc | Permit type: Demolition permit | Permit status: Completed | Completion date: June 3, 2014 | Permit id: 499701 | |||||
Extension of permit # 167635 pursuant to pa act 46. This extension to expire on july 2, 2016 unless extended by other portions of the philadelphia code. Date: May 6, 2013 Client: Ap Inc | Permit type: Zoning admin review | Permit status: Expired | Completion date: May 6, 2013 | Permit id: 468615 | |||||
SCORE 100 The construction of a 7 story detached residential building with associated retail on floors 1 and 2. The puposed construction includes associated awnings, roof screen, parapet walls and railings as shown on the plans. Date: March 13, 2014 Contractor: Intech Construction Inc Client: Ap Inc | Permit type: New construction permit | Permit status: Completed | Completion date: August 21, 2015 | Permit id: 474791 | |||||
Complete demolition of existing buildings and all other site features on 3939 chestnut st for preparation of proposed 7 story detached building. The proposed construction also includes associated curb, sidewalk and street trees in chestnut st as well as awnings, balconies, roof screen, parapet walls and railings as per plans Date: August 16, 2013 Client: Ap Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 16, 2013 | Permit id: 462784 | |||||
Unity of use Date: November 2, 2009 Client: Ap Inc | Permit type: Use permit | Permit status: Completed | Completion date: November 2, 2009 | Permit id: 243621 | |||||
For the demolition of existing structures and for the erection of an eight (8) story addition to an existing nine (9) story structure. Size and location as shown in the application. Date: November 2, 2009 Client: Ap Inc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 2, 2009 | Permit id: 243623 | |||||
Amend building permit ap# 660558 as per clouded revisions. Separate permit required for any mep and fire suppression work. This permit to contain limited structural work and special inspections. Special inspector to be collin baliliet. Date: December 14, 2016 Client: Ap Inc | Permit type: Administrative permit | Permit status: Completed | Completion date: December 23, 2016 | Permit id: 696734 | |||||
SCORE 100 Relocate 12-horn strobes and add 2-smokes to 2nd floor restaurant on an existing fire system as per nfpa72 Date: July 15, 2016 Contractor: Dameon Carty Client: Ap Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: December 23, 2016 | Permit id: 700349 | |||||
SCORE 99 Interior alterations as per approved plans and bbs case 27057 to create a restaurant on the 2nd floor level. Separate permit required for any mechanical, electrical, plumbing, and fire suppression work. Date: March 24, 2016 Contractor: Reliable Fire Protection Inc Client: Ap Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 23, 2016 | Permit id: 660558 | |||||
For the relocation of lot lines to create 2 lots from 4 and the complete demo of the existing 1, 2 and 3 story building s and all other eiting site features for the preparation of aa proposed 8 story buiding addition adjacent ot the existing 9 story building to remain located Date: September 4, 2009 Client: Ap Inc | Permit type: Zoning permit | Permit status: Completed | Completion date: September 4, 2009 | Permit id: 167635 | |||||
SCORE 99 Installation of new hvac system for second floor restaurant to include two (2) new 5 ton units and all associated ductwork and grds as per approved plans. Date: September 26, 2016 Contractor: Reliable Fire Protection Inc Client: Ap Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 23, 2016 | Permit id: 723204 | |||||
SCORE 100 Relocate 36 existing sprinkler heads down through new ceiling. 2nd floor restuarant ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 3, 2016 Contractor: Cellich Fire Protection Inc Client: Ap Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: December 23, 2016 | Permit id: 688966 | |||||
SCORE 100 To remove curb trap & seal lateral (comm bldg) pa201408330438 Date: March 24, 2014 Contractor: Harry Stuhl Iii Client: Ap Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 15, 2014 | Permit id: 525975 | |||||
Demolition permit Date: November 13, 2013 Client: Oap, Inc. | Permit status: Completed | Permit id: 499703 | |||||
Demolition permit Date: October 30, 2008 Client: Oap, Inc. | Permit status: Expired | Permit id: 182937 | |||||
Zoning permit Date: September 4, 2009 Client: Oap, Inc. | Permit status: Completed | Permit id: 235611 | |||||
Zoning use permit Date: October 30, 2008 Client: Oap, Inc. | Permit status: Completed | Permit id: 182936 | |||||
SCORE 100 For the complete demolition of an entire structure in accordance with code bulletin b-1302. All demolition work to be in accordance with approved plans and site safety plans. Date: November 13, 2013 Contractor: Jpc Group Inc Client: Ap, Inc. | Permit type: Demolition permit | Permit status: Completed | Completion date: August 22, 2014 | Permit id: 499703 | |||||
SCORE 100 Complete demo of comercial apts. Date: October 30, 2008 Contractor: Jpc Group Inc Client: Ap, Inc. | Permit type: Demolition permit | Permit status: Expired | Completion date: October 1, 2009 | Permit id: 182937 | |||||
For the complete demolition of commercial apt. Building vacant lot Date: October 30, 2008 Client: Ap, Inc. | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 30, 2008 | Permit id: 182936 | |||||
For the relocation of lot lines to create two (2) lots from four (4) lots (three (3) brt accounts). Date: September 4, 2009 Client: Ap, Inc. | Permit type: Zoning permit | Permit status: Completed | Completion date: September 4, 2009 | Permit id: 235611 |