Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Commercial exterior window replacment from fixed to bi-fold in cafe and conference center. Date: July 24, 2015 Value: $83,000 Permit status: Approved | Permit id: 15000-01936 | |||||
SCORE 96 Jcc: add a new meeting room, electrical for office furniture, and relocate one light Permit status: Permit issued | Permit id: 14000-02364 | |||||
SCORE 100 13-2231 : ammr for current requirements at feeder conductor; 10 amps 600amps with current limiter. Date: January 21, 2014 Contractor: Cobalt Power Systems Inc Permit status: Permit issued | Permit id: 14rev-00035 | |||||
SCORE 100 9 30 13: ar issued for structural only jcc: install a roof mounted partially ballasted pv system (4 kw) ammr submitted for ampacity requirements Date: August 21, 2013 Contractor: Cobalt Power Systems Inc Permit status: Permit issued | Permit id: 13000-02231 | |||||
SCORE 100 13000-02231: inverter mounting details Date: December 19, 2013 Contractor: Cobalt Power Systems Inc Permit status: Permit issued | Permit id: 13rev-00786 | |||||
SCORE 89 12-093: added sump pump, new draining; added concrete wall, revised draining; no exterior changes Date: February 1, 2013 Contractor: Triton Construction Company Inc Permit status: Permit issued | Permit id: 13rev-00056 | |||||
SCORE 89 Jcc trash enclosure: demo raised slab at trash enclosure, pour new slab at grade, and extend rolling door to extend to the new slab elevation Date: January 10, 2012 Contractor: Triton Construction Company Inc Permit status: Permit issued | Permit id: 12000-00093 | |||||
SCORE 68 Jcc cafe: remodel of existing cafe (2637 sf). New rooftop equipment. Expand cafe by 396 sf into adjacent retail space. U&o required Permit status: Permit issued | Permit id: 16000-00244 | |||||
SCORE 99 Commercial two story addition (4,9 sf) to existing building at the "jewish life center" and adding a second podium level above an existing sunken parking lot to be used as a playing field (35,1 sf) Permit status: Permit issued | Permit id: 17000-00692 | |||||
17000-00692: deferred submittal stairs, handrails and gaurds Date: November 1, 2017 Permit status: In plan check | Permit id: 17rev-00705 | |||||
SCORE 90 Provide power to temporary construction trailer (single wide) from existing panel. Date: July 28, 2017 Contractor: Redwood Electric Group Inc Permit status: Permit issued | Permit id: 17000-01793 | |||||
SCORE 99 17000-00692: deferred submittal for 15-foot tall fence around ball field Date: December 20, 2017 Contractor: Vance Brown Inc Permit status: In plan check | Permit id: 17rev-00794 | |||||
SCORE 99 17000-00692: changes to the track and field layout (expanding field shrinking track), relocate planters, enclosing existing stairway, and change interior stairway orientation Date: December 20, 2017 Contractor: Vance Brown Inc Permit status: In plan check | Permit id: 17rev-00792 | |||||
SCORE 99 17000-00692: deferred submittal for interior folding partitions Date: December 20, 2017 Contractor: Vance Brown Inc Permit status: In plan check | Permit id: 17rev-00793 |