Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 The applicant proposes to modify the existing wireless telecommunications facility by adding three (3) new panel antennas together with supporting equipment. The proposed antennas will be entirely concealed within the existing false chimneys. Because the proposed antennas will entirely concealed this modification should not require bra design review approval. Client: Boston Housing Authority | Permit type: Cellular tower | Permit status: Expired | Current use: Other | Permit id: Alt461628 | Parcel: 0702847000 | |||||
SCORE 89 Long form alteration permit Client: Boston Housing Authority | Permit type: Cellular tower | Current use: Other | Permit id: Alt461628 | |||||
SCORE 79 Removal and replacement of the existing built up roofing system. Install new modified bitumen roofing flashings metal cladding and roof drains. Client: Boston Housing Authority | Permit type: City of boston | Permit status: Expired | Current use: Multi | Permit id: Sf585088 | Parcel: 0702847000 |