Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 For the complete demolition of an existing three-story structure. Structure to be demolished by hand and with hand held tools at the second and third floors. Structure to be demolished with mechanical equipment at the first floor and basement. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. A covered walkway or sidewalk closure shall be required within 8. 25 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. 21 day posting and notice required per a-303. 2 permit arrived from downstairs 9 6 17 Date: September 5, 2017 Contractor: Stonewall Contracting Llc Client: Ripkin Mitchell | Permit type: Demolition permit | Permit status: Active | Completion date: November 22, 2017 | Permit id: 803615 | |||||
SCORE 79 Sealing 5" lateral after curb trap-pa1#20171951589-seal 5" lateral at the curb line by removing the house trap and hermetically sealing the lateral by a cap or plug per section p-606. 1 of the philadelphia plumbing code 2004 - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: July 17, 2017 Contractor: Gaceta Plumbing Llc Client: Ripkin Mitchell | Permit type: Plumbing permit | Permit status: Active | Completion date: November 29, 2017 | Permit id: 800194 | |||||
For completed demolition of an existing structure for use as a vacant lot Date: September 5, 2017 Client: Ripkin Mitchell | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 5, 2017 | Permit id: 803614 |