Content |
---|
R/c 20141419802 public hall: as per the requirement contract with hpd, repair 3 window guards throughout public hall. Remove all work related ![]() Permit type: Gc | Permit id: Eh04292 |
At building: public hall window between third and fourth floor; replace defective support including chain and counter balance weight to prevent guilo ![]() Permit type: Gc | Permit id: Eh03399 |
(apt#1d): supply and install (1) thermo window complete at kitchen (fire escape): complete - brick to brick aluminum dhc replacement window, include ![]() Permit type: Gc | Permit id: Eg16872 |
Apt#4d @ bathroom: install a new window complete - brick to brick aluminum dhc replacement window, includes, caulking, casings, stops, stool and apr ![]() Permit type: Gc | Permit id: Eg16685 |
Apt 5a.................. Extremely hot water causing potential scalding condition / damamge. (temp 160) at the time of this invitation to bid, it is ![]() Permit type: Plumb | Permit id: Eg13700 |
Apt 5a.................. Extremely hot water causing potential scalding condition / damamge. (temp 160) at the time of this invitation to bid, it is ![]() ![]() Permit type: Plumb | Permit id: Eg13700 |
R/c 20141419802 apt 2d: as per the requirement contract with hpd, repair 5 window guards throughout apartment. Remove all work related debris. ![]() Permit type: Gc | Permit id: Eg02457 |
Apt#6d @ public hall (1st floor public hallway): replace broken / defective marble tread with new, at 4th up from bottom at stairs to 1st floor land ![]() Permit type: Gc | Permit id: Ed21306 |
Apt#6d @ north east#1/livingroom: replace broken or defective window (guillotine effect). Provide and install a new thermal double insulated window c ![]() Permit type: Gc | Permit id: Ed19634 |
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio ![]() Permit type: Delead | Permit id: Ed20378 |