Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
3 family house repair gas boiler in basement and bring to pwo, to supply heat to apt # 3 and rest of the building. Remove all work related debri Date: January 23, 2012 Permit type: Heat | Permit id: Ec18156 | |||||
Alternative enforcement program apartment #3 a) remove the defective rear apartment entrance door & frame complete. Supply & install new (20ga. Date: April 20, 2012 Permit type: Gc | Permit id: Ec27244 | |||||
Alternative enforcement program building relocate and replace with new, the defective-broken (rotary dialed thermostat) from apartment #3 to firs Date: April 13, 2012 Permit type: Heat | Permit id: Ec27243 | |||||
At apt. # 3 rm# ne1 - replace the broken glass pane in the lower sash window in 1st. Window from northeast. All debris must be removed and disposed ap Date: May 18, 2010 Permit type: Gc | Permit id: Ea35192 | |||||
At apt3- in rm ne3- replace with new the broken glass pane ( 1 ) at upper sash and properly secure the loose electrical outlet at east wall in the sam Date: January 10, 2012 Permit type: Gc | Permit id: Ec16835 | |||||
Supply and install an additional new meter pan and curcuit breaker panel for public utilties and separate boiler and public hall lights from apartm Permit type: Elec | Permit id: Ec31125 | |||||
Supply and install an additional new meter pan and curcuit breaker panel for public utilties and separate boiler and public hall lights from apartm Permit type: Elec | Permit id: Ec31125 | |||||
Supply and install an additional new meter pan and curcuit breaker panel for public utilties and separate boiler and public hall lights from apartm Permit type: Elec | Permit id: Ec31125 | |||||
Supply and install an additional new meter pan and curcuit breaker panel for public utilties and separate boiler and public hall lights from apartm Permit type: Elec | Permit id: Ec31125 | |||||
Supply and install an additional new meter pan and curcuit breaker panel for public utilties and separate boiler and public hall lights from apartm Permit type: Elec | Permit id: Ec31125 | |||||
Apt #2; livingroom:- replace with new the existing broken (cut hazard) double pane glasses at the upper and lower window sashes to include window gua Date: December 19, 2011 Permit type: Gc | Permit id: Ec15245 | |||||
Alternative enforcement program apartment #2 please note: small children under age 6 reside in apartment. Bathroom a) replace with new, th Date: December 26, 2012 Permit type: Elec | Permit id: Ed11921 | |||||
Alternative enforcement program apartment #2 bathroom a) remove existing plumbing fixtures which includes bathtub, toilet bowl, face basin with Date: August 22, 2012 Permit type: Gc | Permit id: Ed04605 | |||||
Alternative enforcement program building front entrance door a) remove the existing-collapsing building front entrance door including hinges. Prov Date: June 22, 2012 Permit type: Gc | Permit id: Ec31205 | |||||
Alternative enforcement program apartment #2 a) remove the defective-floor carpeting complete and discard @ livingroom & hallway floors. B) demo Date: November 23, 2012 Permit type: Gc | Permit id: Ed10248 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 7, 2012 Permit type: Delead | Permit id: Ed05792 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: January 19, 2012 Permit type: Delead | Permit id: Ec18207 | |||||
Apt. #2; bathroom:- treace and repair the source of water leak from the ceiling. Demo and repair using similar material the entire bathroom Date: July 8, 2011 Permit type: Gc | Permit id: Eb35228 | |||||
Alternative enforcement program apartment #2 a) demo section of defective-collapsing sheetrock @ bathroom ceiling (directly above toilet bowl)=(ap Date: March 20, 2012 Permit type: Gc | Permit id: Ec24867 | |||||
Make all the necessary repair to the 1 gal water heater to provide adequate hot water temperature to all the apartments in the building. Note: Permit type: Heat | Permit id: Ec20839 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 29, 2011 Permit type: Delead | Permit id: Ec03617 | |||||
Alternative enforcement program apartment #2 contact tenant @ 917-435-3845 one day in advance prior to start of job. Kitchen a) provide & install n Date: July 10, 2012 Permit type: Gc | Permit id: Ed01973 | |||||
Make all the necessary repair to the 1 gal water heater to provide adequate hot water temperature to all the apartments in the building. Note: Permit type: Heat | Permit id: Ec20839 | |||||
Make all the necessary repair to the 1 gal water heater to provide adequate hot water temperature to all the apartments in the building. Note: Permit type: Heat | Permit id: Ec20839 | |||||
Make all the necessary repair to the 1 gal water heater to provide adequate hot water temperature to all the apartments in the building. Note: Permit type: Heat | Permit id: Ec20839 | |||||
Make all the necessary repair to the 1 gal water heater to provide adequate hot water temperature to all the apartments in the building. Note: Permit type: Heat | Permit id: Ec20839 | |||||
Public hall location - stairs and balcony to the entire building. Properly secure the loose balusters and balustrate at the 1st sty stairs at t Date: July 13, 2011 Permit type: Gc | Permit id: Ec02175 | |||||
Remove double cylinder lock and replace with up to code single cilinder lock at storm steel door entrace to building. Include all the necessary repair Date: March 1, 2012 Permit type: Gc | Permit id: Ec21888 | |||||
Cellar - pump out water. Clear house trap to street. And sanitize. Remove all work related debris. Non- s. W. P. Note: contractor must contact h. Date: March 18, 2010 Permit type: Stopag | Permit id: Ea29633 | |||||
Alternative enforcement program building public hallways-(wood ballusters) supply & install new, (approx. 10) similar type missing wood balluste Date: March 21, 2012 Permit type: Gc | Permit id: Ec24751 | |||||
Alternative enforcement program cellar a) demo the remaining sections of the collapsing sheetrock at the mid-right ceiling (64 s. F.); & front-rig Date: January 4, 2013 Permit type: Gc | Permit id: Ed12564 | |||||
Properly repair with simiilar materials the broken masonry door saddle at entrance to building at public hall 1st story. And remove the illegal fasten Date: January 10, 2012 Permit type: Gc | Permit id: Ec16838 | |||||
Alternative enforcement program apartments #1 and #2 remove / disconnect and dispose the nuisance consisting of extension-electric cords illegally Date: March 23, 2012 Permit type: Elec | Permit id: Ec24918 | |||||
Alternative enforcement program building public hall -north wall (located at/near vestibule door inner public hall wall area) repair the broken- Date: May 22, 2012 Permit type: Gc | Permit id: Ec29151 | |||||
Alternative enforcement program rear- fire escape (drop ladder) re-connect properly and adjust the dropladder to gravity hook @ rear fire escap Date: March 28, 2012 Permit type: Gc | Permit id: Ec24744 | |||||
Alternative enforcement program building vestibule door remove the existing building vestibule door & frame complete. Provide & install new metal Date: March 23, 2012 Permit type: Gc | Permit id: Ec24906 | |||||
Alternate enforcement program cellar provide & install new h. M. (18ga, composite, a label 3 hr. Rating) cellar door including new frame, standar Date: October 26, 2012 Permit type: Gc | Permit id: Ed08534 | |||||
(public area) clear main sewer house trap from trap to street and from hourse to trap into building. Pump out all water and sewer from the entire ba Date: July 9, 2010 Permit type: Stopag | Permit id: Eb01872 | |||||
Replace with new the missing 18 balusters in public hall way (4 balusters at 1st story, 9 balusters at 2nd story, and 5 balusters at 3rd story). Pro Date: December 11, 2009 Permit type: Gc | Permit id: Ea18334 | |||||
As per requirement contract (bijoy) scope of work for 388 east 155th st seal openings to windows and doors as follows: front. 1st. Sty.. - stuc Date: January 10, 2013 Permit type: Gc | Permit id: Ed13871 | |||||
Alternative enforcement program building public hallway floors- total=(3) 1. Remove the defective-trip hazard floor carpeting complete @ third flo Date: October 9, 2012 Permit type: Gc | Permit id: Ed07357 | |||||
Alternative enforcement program cellar, rear yard and right courtyard. Legally remove the accumulation of (approx. 8 cubic yards) of refuse, const Date: December 21, 2012 Permit type: Gc | Permit id: Ed12473 | |||||
Alternative enforcement program cellar a) demo complete defective loose collapsing concrete-brick steps & remove loose concrete-brick cheek walls Date: July 24, 2012 Permit type: Gc | Permit id: Ed01979 | |||||
P/h; 2nd story:- dispose the free standind radiators for a total of 2 Date: December 13, 2011 Value: $241 Permit type: Misc | Permit id: Ec15246 | |||||
At public hall: 3rd sty; -install (1) window guard Date: June 2, 2011 Value: $63 Permit type: Gc | Permit id: Eb33171 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: August 4, 2011 Permit type: Delead | Permit id: Ec04172 | |||||
Apt.#2: l/r: rear rm. Install 2 w/ guards and stops remove all work related debris. Date: January 11, 2012 Value: $127 Permit type: Gc | Permit id: Ec17682 | |||||
Adjust hot water temperature at gas hot water heater to legal limit. At the time of this invitation to bid, it is not anticipated that this work wil Date: December 15, 2010 Value: $194 Permit type: Plumb | Permit id: Eb17603 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: August 26, 2010 Value: $1,390 Permit type: Delead | Permit id: Eb08316 | |||||
Replace with new the apt. Mortise entrance lock ( 2 3/4 ) left complete. Remove all work related debris. Non- s. W. P. Note: contractor must c Date: October 22, 2010 Value: $327 Permit type: Gc | Permit id: Eb13296 | |||||
At apt # 3 - replace mortise lock of apt. Entrance door with new one and leave in perfect working order. All debris must be removed and disposed Date: May 11, 2010 Value: $129 Permit type: Gc | Permit id: Ea35188 | |||||
Public hall floor 2 install window guard, 1 each @ public hall floor 2. Date: August 28, 2009 Value: $80 Permit type: Gc | Permit id: Ea08183 | |||||
SCORE 100 Alteration Date: September 25, 2012 Contractor: Mark Contracting Ny Inc Permit status: Permit issued | Permit id: 22023181701 | |||||
Replace with new the apt. Mortise entrance lock ( 2 3 4 ) left complete. Remove all work related debris. Non- s. W. P. Note: contractor must c Date: October 22, 2010 Value: $327 Permit type: Gc | Permit id: Eb13296 | |||||
Apt.#2: l r: rear rm. Install 2 w guards and stops remove all work related debris. Date: January 11, 2012 Value: $127 Permit type: Gc | Permit id: Ec17682 | |||||
P h; 2nd story:- dispose the free standind radiators for a total of 2 Date: December 13, 2011 Value: $241 Permit type: Misc | Permit id: Ec15246 | |||||
Alternative enforcement program building public hall -north wall (located at near vestibule door inner public hall wall area) repair the broken- Date: May 22, 2012 Permit type: Gc | Permit id: Ec29151 | |||||
Alternative enforcement program apartments #1 and #2 remove disconnect and dispose the nuisance consisting of extension-electric cords illegally Date: March 23, 2012 Permit type: Elec | Permit id: Ec24918 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: August 24, 2011 Permit type: Delead | Permit id: Ec05583 | |||||
Con ed provide gas to boiler/hot water heater Date: June 22, 2010 Permit type: Util | Permit id: Eb00206 | |||||
As per mini rc # 2011000423501 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 2 samples for asbestos content util Date: May 18, 2011 Permit type: Asbest | Permit id: Eb31722 | |||||
Properly reinstall the loose electrical wall outlet. Supply and install the cover in 4th room from north. Restore the electrical service to entire apa Date: December 11, 2009 Permit type: Elec | Permit id: Ea18332 | |||||
Con ed provide gas to boiler/hot water heater Date: January 31, 2012 Permit type: Util | Permit id: Ec19865 | |||||
Make all necessary repairs to crown gas boiler. Restore boiler to proper working order. Date: December 23, 2010 Permit type: Heat | Permit id: Eb17615 | |||||
Con ed provide gas to boiler/hot water heater Date: July 1, 2013 Permit type: Util | Permit id: Ee19779 | |||||
Perform asbestos abatement pursuant to hpd specification, new york city dep rules - title 15, chapter 1, new york state industrial code rule 56 and ot Date: May 31, 2011 Permit type: Asbest | Permit id: Eb31790 | |||||
As per mini rc # 2011140510201 (new york enviornmental) perform air sampling and analysis in accordance with hpd mini requirement contract specificati Date: June 30, 2011 Permit type: Asbest | Permit id: Eb31791 | |||||
Basement remove defective hot water heater, install new 1 gallon, gas line hot water heater. Install on cement pad hook-up to existing gas, and Date: May 12, 2011 Permit type: Plumb | Permit id: Eb31020 | |||||
Alternative enforcement program apartment #1 (located at 1st floor) a) seal up all accessible openings including entrance doors & windows @ apartm Date: September 14, 2012 Permit type: Gc | Permit id: Ed05959 | |||||
Apt: 1 unseal, properly secure and repair complete unit of defective/loose screwed window to proper working order , two (2) each at kitchen and one Date: June 29, 2011 Permit type: Gc | Permit id: Eb34799 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 5, 2010 Permit type: Delead | Permit id: Eb11071 | |||||
Con edison provide gas to boiler / hot water heater. Permit type: Util | Permit id: Eb01188 | |||||
Con ed provide gas to boiler/hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec01337 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 7, 2011 Permit type: Delead | Permit id: Ec06610 | |||||
Con edison provide gas to boiler / hot water heater. Permit type: Util | Permit id: Eb01188 | |||||
Con edison provide gas to boiler / hot water heater. Permit type: Util | Permit id: Eb01188 | |||||
Con ed provide gas to boiler hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec01337 | |||||
Con edison provide gas to boiler hot water heater. Permit type: Util | Permit id: Eb01188 | |||||
Con ed provide gas to boiler hot water heater Date: July 1, 2012 Permit type: Util | Permit id: Ed01344 | |||||
Apt: 1 unseal, properly secure and repair complete unit of defective loose screwed window to proper working order , two (2) each at kitchen and one Date: June 29, 2011 Permit type: Gc | Permit id: Eb34799 | |||||
Con ed provide gas to boiler hot water heater Date: July 1, 2013 Permit type: Util | Permit id: Ee19779 | |||||
Con ed provide gas to boiler hot water heater Date: June 22, 2010 Permit type: Util | Permit id: Eb00206 | |||||
Con edison provide gas to boiler hot water heater. Permit type: Util | Permit id: Eb01188 |