Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 4-25-16 - plan change increase number of strings from 2 to 3 strings; increase conductors from 4 to 6 between inverter and msp... Djm Date: April 1, 2016 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 29, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 4-25-16 - plan change increase number of strings from 2 to 3 strings; increase conductors from 4 to 6 between inverter and msp... Djm Date: April 1, 2016 Contractor: 1 Percent Electric Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 29, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: April 27, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- |