Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 76 Change of use single-family dwelling convert existing double family dwelling into a single, work to incl: plumbing, electrical & hvac. One kitchen to remain Date: May 22, 2001 Contractor: Chris Bellone Client: Bellone, Christopher C | Permit id: B01002665 | |||||
SCORE 79 Install mechanical equipment single-family dwelling install elec warm air furnace and 3-ton a c. Ramon guichard 822-0326 Date: July 30, 2001 Contractor: Ramon Guichard Client: Bellone, Christopher C | Permit id: M01004817 | |||||
SCORE 98 Install mechanical equipment single-family dwelling installation of 1- electric waterheater. David 283-9050. Date: May 1, 2002 Contractor: David Clay Client: Bellone, Christopher C | Permit id: M02002737 | |||||
SCORE 95 Install mechanical equipment single-family dwelling meter out over six months. Fred ratliff - 887-0408 Date: August 30, 2002 Contractor: Mr. Rooter Client: Bellone, Christopher C | Permit id: M02005548 |