Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Date: April 27, 2004 Permit id: 04-04-247 | Parcel: 001010001000 | |||||
Date: August 18, 2005 Permit id: 05-08-212 | Parcel: 072021000000 | |||||
Date: September 6, 2006 Permit id: 06-09-064 | Parcel: 072021006000 | |||||
Date: October 24, 2011 Permit id: 11-10-080 | Parcel: 072021006000 | |||||
Replaced by permit 06-0632.. Permit expired refund deposit to owner. Pgm 9-6-06 pool-a pre-inspection is required! Final engineering inspec. Is req. Prior to building permit final. Any damage to curb, gutter, sidewalk or landscape will be repaired prior to refund. A soil relocation letter is required. All work shall conform to city standards. Date: August 19, 2005 Permit id: 05-1259 | Parcel: 072021000000 | |||||
SCORE 89 Install 1" water meter; new sfd, bridgeway lakes 1 phase 2. Temporary water paid for six months from issuance date. Date: April 29, 2004 Contractor: Shea Homes Limited Ptnshp Permit id: 04-0521 | |||||
SCORE 94 Vinyl poola preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Date: September 7, 2006 Contractor: Imperial Pools Permit id: 06-0632 | Parcel: 072021006000 |