Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: March 31, 2016 Client: Trustees Of The Universit | Permit status: Expired | Permit id: 680532 | |||||
Mechanical permit Date: December 10, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 611934 | |||||
Fast form building permit Date: June 22, 2007 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 85106 | |||||
Administrative permit Date: April 20, 2016 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 686006 | |||||
Zoning/use permit Date: August 27, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 555549 | |||||
Zoning permit Date: April 1, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 525438 | |||||
Alteration permit Date: November 14, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 560687 | |||||
Suppression permit Date: October 2, 2007 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 105789 | |||||
Mechanical permit Date: August 2, 2013 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 485387 | |||||
Suppression permit Date: October 15, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 635827 | |||||
Plumbing permit Date: August 13, 2007 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 96000 | |||||
Alteration permit Date: October 7, 2009 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 231129 | |||||
Plumbing permit Date: May 29, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 611717 | |||||
Addition permit Date: July 28, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 292683 | |||||
Electrical permit Date: August 13, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 295688 | |||||
Demolition permit Date: May 21, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 525652 | |||||
Plumbing permit Date: December 19, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 576058 | |||||
Plumbing permit Date: August 12, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 296034 | |||||
Alteration permit Date: July 28, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 291135 | |||||
Addition permit Date: April 17, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 586049 | |||||
Suppression permit Date: April 26, 2012 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 401501 | |||||
Electrical permit Date: September 19, 2007 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 103966 | |||||
Administrative permit Date: August 8, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 193396 | |||||
Electrical permit Date: August 8, 2013 Client: Trustees Of The Universit | Permit status: Expired | Permit id: 485409 | |||||
Zoning/use permit Date: May 5, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 532612 | |||||
Alteration permit Date: June 4, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 610447 | |||||
Addition permit Date: May 15, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 533538 | |||||
Electrical permit Date: August 5, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 546810 | |||||
Plumbing permit Date: August 6, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 552687 | |||||
Zoning/use permit Date: May 1, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 603463 | |||||
Addition permit Date: June 18, 2015 Client: Trustees Of The Universit | Permit status: Expired | Permit id: 610274 | |||||
Plumbing permit Date: August 13, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 631845 | |||||
Electrical permit Date: August 3, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 623269 | |||||
Zoning use permit Date: May 5, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 532612 | |||||
Plumbing permit Date: August 6, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 552687 | |||||
Electrical permit Date: August 5, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 546810 | |||||
Alteration permit Date: June 4, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 610447 | |||||
Addition permit Date: May 15, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 533538 | |||||
For the erection of a two-story addition with porch and accessible ramp. Size and location as shown in plans. For use as radio, television, and recording services in the same building as business & professional offices and educational facility as previously approved. No signs on this application. Date: May 5, 2014 Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 5, 2014 | Permit id: 532612 | |||||
SCORE 100 For level ii interior alterations to an existing structure to include partial demolition and reconstruction of interior walls and interior finishes as per apporved plans. Date: June 4, 2015 Contractor: Daniel J Keating Company Permit type: Alteration permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 610447 | |||||
SCORE 100 Relocate two 4" rain leaders Date: August 6, 2014 Contractor: Tracey Mechanical Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: December 26, 2014 | Permit id: 552687 | |||||
Construction of a two story addition and associative interior exterior alterations to the existing building as shown on plans. No signs this application. Addl permits req: electrical, plumbing, hvac Date: May 15, 2014 Permit type: Addition permit | Permit status: Completed | Completion date: February 25, 2015 | Permit id: 533538 | |||||
SCORE 100 Install new fire alarm devices & cabling. Install lights & devices. Replace lights & switches in rooms 109 & 203. Provide empty conduits for tele data av. Date: August 5, 2014 Contractor: Anmar Electrical Contractor In Permit type: Electrical permit | Permit status: Completed | Completion date: December 9, 2014 | Permit id: 546810 | |||||
Suppression permit Date: April 26, 2012 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 401501 | |||||
Alteration permit Date: October 7, 2009 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 231129 | |||||
Mechanical permit Date: August 2, 2013 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 485387 | |||||
Electrical permit Date: August 13, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 295688 | |||||
Administrative permit Date: August 8, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 193396 | |||||
Suppression permit Date: June 8, 2007 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 78780 | |||||
Fast form building permit Date: June 22, 2007 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 85106 | |||||
Zoning use permit Date: August 27, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 555549 | |||||
Alteration permit Date: July 28, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 291135 | |||||
Suppression permit Date: October 15, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 635827 | |||||
Demolition permit Date: May 21, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 525652 | |||||
Addition permit Date: July 28, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 292683 | |||||
Electrical permit Date: August 8, 2013 Client: Trustees Of The Universit | Permit status: Expired | Permit id: 485409 | |||||
Plumbing permit Date: January 12, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 578229 | |||||
Zoning permit Date: May 5, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 532273 | |||||
Electrical permit Date: September 19, 2007 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 103966 | |||||
Electrical permit Date: April 11, 2016 Client: Trustees Of The Universit | Permit status: Expired | Permit id: 676054 | |||||
Administrative permit Date: May 27, 2016 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 692585 | |||||
Mechanical permit Date: December 10, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 611934 | |||||
Alteration permit Date: November 14, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 560687 | |||||
Plumbing permit Date: December 19, 2014 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 576058 | |||||
Plumbing permit Date: August 12, 2010 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 296034 | |||||
Addition permit Date: April 17, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 586049 | |||||
Plumbing permit Date: August 13, 2007 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 96000 | |||||
SCORE 100 Temporary certificate of occupancy Date: April 20, 2016 Contractor: Daniel J Keating Company Client: Trustees Of The Universit | Permit type: Administrative permit | Permit status: Completed | Completion date: June 5, 2016 | Permit id: 686006 | |||||
SCORE 100 Install customer provided av equipment, install customer provided cabling as listed to connect all equipment in 4 rows within bldg. Test and label all new plenum category 6 cabling with longest run being 1 per 2008 nec (university complex)west district Date: April 11, 2016 Contractor: Bluestone Communications Inc Client: Trustees Of The Universit | Permit type: Electrical permit | Permit status: Completed | Completion date: June 23, 2017 | Permit id: 676054 | |||||
SCORE 100 Install ductwork, mechanicals, piping, registers diffuser, rivets, including all incidental work so system can be operated and balanced. Code design prof: charles argue jr, pe Date: December 10, 2015 Contractor: Tracey Mechanical Inc Client: Trustees Of The Universit | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 10, 2016 | Permit id: 611934 | |||||
SCORE 100 New construction for business and preofessional offices. Service from university distribution system,distribution system,lighting,wiring devices per 2008 nec (university complex) fire alarm per nfpa 72 Date: January 27, 2016 Contractor: Larry C Mccrae Inc Client: Trustees Of The Universit | Permit type: Electrical permit | Permit status: Completed | Completion date: July 25, 2016 | Permit id: 628135 | |||||
SCORE 100 Furnish and install new feeder cable in existing conduit and connect to existing circuit breaker per 2008 nec (university complex)west district Date: March 31, 2016 Contractor: Palman Electric Inc Client: Trustees Of The Universit | Permit type: Electrical permit | Permit status: Expired | Completion date: March 31, 2016 | Permit id: 680532 | |||||
SCORE 93 Connecting kitchen system to fire alarm system (no drawing), no load change involve, equipment existing. (west dist) Date: September 19, 2007 Contractor: John Lawlor Client: Trustees Of The Universit | Permit type: Electrical permit | Permit status: Completed | Completion date: February 28, 2008 | Permit id: 103966 | |||||
SCORE 95 Install nfpa 13 sprinkler system for commercial bldg. 4" feed main. Code design prof: john fee, pe; no changes to exterior as required by historical commission. Work in accordance with approved plans and plan review form. Date: October 15, 2015 Contractor: Preferred Fire Protection Inc Client: Trustees Of The Universit | Permit type: Suppression permit | Permit status: Completed | Completion date: July 23, 2016 | Permit id: 635827 | |||||
SCORE 100 Relocating 19 sprinklers in basement through 3rd floor of university of penns sigma chi. Date: July 31, 2015 Contractor: Oliver Sprinkler Co Inc Client: Trustees Of The Universit | Permit type: Suppression permit | Permit status: Completed | Completion date: May 1, 2016 | Permit id: 628721 | |||||
For the relocation of lot lines to create two (2) lots from three (3) existing lots (one (1) opa account). No change in height or area of existing buildings. Size and location as shown in plans. Date: April 1, 2014 Client: Trustees Of The Universit | Permit type: Zoning permit | Permit status: Completed | Completion date: April 1, 2014 | Permit id: 525438 | |||||
SCORE 100 Installation of kitchen fire suppression system. Upgrade to ul 3 standard Date: October 2, 2007 Contractor: Keystone Fire Protection Client: Trustees Of The Universit | Permit type: Suppression permit | Permit status: Completed | Completion date: October 8, 2008 | Permit id: 105789 | |||||
SCORE 100 For the erection of an addition to an existing structure work to include facade and interior fit out of existing structure. Separate permit is required for electrical, plumbing, mechanical and fire suppression work Date: April 17, 2015 Contractor: Daniel J Keating Company Client: Trustees Of The Universit | Permit type: Addition permit | Permit status: Completed | Completion date: August 2, 2016 | Permit id: 586049 | |||||
SCORE 100 For the placement of a foundation only to support a future structure used as business & professional offices. Date: November 14, 2014 Contractor: Daniel J Keating Company Client: Trustees Of The Universit | Permit type: Alteration permit | Permit status: Completed | Completion date: September 14, 2015 | Permit id: 560687 | |||||
SCORE 100 Install 3-subsurface storm management systems, 13-yard drains, 6-trench drains, 6-roof drains 2-sewer connections & 1-3" domestice water service w meter pit (office bldg) pa20143072414 "self-certifications are no longer permitted" - "all excavations & plumbing trenches in excess of 5-0" in depth must have approved shoring in place at the time of inspection" Date: December 19, 2014 Contractor: Meco Constructors Inc Client: Trustees Of The Universit | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 23, 2016 | Permit id: 576058 | |||||
For the partial demolition of an existing vacant building. Size and location as shown in approved plans. No change in use. Date: May 5, 2014 Client: Trustees Of The Universit | Permit type: Zoning permit | Permit status: Completed | Completion date: May 23, 2017 | Permit id: 532273 | |||||
For the erection of an addition to an existing detached structure. Size and location as shown in plans. For use as existing business & professional offices and personal services as previously approved. Date: August 27, 2014 Client: Trustees Of The Universit | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 27, 2014 | Permit id: 555549 | |||||
SCORE 100 Relocate (2) outlets in basement, provide power for new handicap door,new gfic land light in bathroom, as per 2008 nec. Additional permsits required to wire controls (west dist) Date: August 13, 2010 Contractor: Marano Michael Client: Trustees Of The Universit | Permit type: Electrical permit | Permit status: Completed | Completion date: December 15, 2010 | Permit id: 295688 | |||||
SCORE 99 Install 1 handicapped water closet, 1 handicapped lav, 1 mop receptor Date: August 12, 2010 Contractor: Golden And Cowden Client: Trustees Of The Universit | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 16, 2010 | Permit id: 296034 | |||||
SCORE 99 Additional circuits for duct less mini split systems at panel and disconeects at outdoor equipment as per 2008 nec (university complex) Date: August 8, 2013 Contractor: A And A Mechanical Services Inc Client: Trustees Of The Universit | Permit type: Electrical permit | Permit status: Expired | Completion date: August 8, 2013 | Permit id: 485409 | |||||
SCORE 100 Fast form building permit Date: June 22, 2007 Contractor: Belcher Roofing Corporation Client: Trustees Of The Universit | Permit status: Completed | Completion date: October 3, 2007 | Permit id: 85106 | |||||
SCORE 100 Remove 5 sinks and replace with new sinks, no piping involved Date: August 13, 2007 Contractor: Tracey Mechanical Inc Client: Trustees Of The Universit | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 4, 2011 | Permit id: 96000 | |||||
SCORE 100 Amend permit # 586049 dated 4 17 15 - revise doundation design at b-c line and 1-5 line per attachd drawings s-101 & 300. Also to include revision of mechanical room as per plan. Date: May 27, 2016 Contractor: Daniel J Keating Company Client: Trustees Of The Universit | Permit type: Administrative permit | Permit status: Completed | Completion date: July 23, 2016 | Permit id: 692585 | |||||
SCORE 100 Install (69) auto sprinklers on the 1st thru 22nd flrs., basement and lower level Date: June 8, 2007 Contractor: Oliver Sprinkler Co Inc Client: Trustees Of The Universit | Permit type: Suppression permit | Permit status: Completed | Completion date: October 10, 2007 | Permit id: 78780 | |||||
SCORE 100 New office building u of penn, above ground only Date: May 29, 2015 Contractor: Bofinger And Breslin Client: Trustees Of The Universit | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 23, 2016 | Permit id: 611717 | |||||
Repair and or replace existing windows, replace wood bay bracket, paint, install new bolts in front door to match existing. Date: October 7, 2009 Client: Trustees Of The Universit | Permit type: Alteration permit | Permit status: Completed | Completion date: May 28, 2010 | Permit id: 231129 | |||||
Alterations to existing bldg. Including basement window infill, drywer vent and new platform on existing porch floor, new entry door, bathroom alterations. Date: July 28, 2010 Client: Trustees Of The Universit | Permit type: Alteration permit | Permit status: Completed | Completion date: March 1, 2011 | Permit id: 291135 | |||||
New outdoor ramp. Date: July 28, 2010 Client: Trustees Of The Universit | Permit type: Addition permit | Permit status: Completed | Completion date: February 22, 2011 | Permit id: 292683 | |||||
SCORE 83 Installation of hvac units and related ductwork as per plans. Date: August 2, 2013 Contractor: Hightec Hvac Inc Client: Trustees Of The Universit | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 22, 2013 | Permit id: 485387 | |||||
Preliminary plan review Date: August 8, 2010 Client: Trustees Of The Universit | Permit type: Administrative permit | Permit status: Completed | Completion date: June 22, 2015 | Permit id: 193396 | |||||
SCORE 100 Installation of underground sanitary piping and floor drains on the interior of the new addition (business & professional offices) to a point 5-0" outside only - note: fixture unit loads have not been established and were not indicated on the plans - owner contractor engineer will assume responsibility for any changes that may be necessary to accomodate the new work above the slab - additional permit(s) required for water supply piping,sanitary piping above the slab and interior storm drainage Date: January 12, 2015 Contractor: Tracey Mechanical Inc Client: Trustees Of The Universit | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 30, 2015 | Permit id: 578229 | |||||
SCORE 98 Partial demolition only. Remove 2 story portion only of existing 2 & 3 story building, 3 story structure to remain, protect and enclose as indicated shown per site safety plans and code bulletin, hand methods as prescirbed with further foundation removal as prescribed, area to be fenced and pedestrian protected within university complex area. Asbestos abatement required. Date: May 21, 2014 Contractor: Delta Bjds Inc Client: Trustees Of The Universit | Permit type: Demolition permit | Permit status: Completed | Completion date: February 24, 2016 | Permit id: 525652 | |||||
SCORE 83 Mechanic alterations to an existing hvac unit to include the installation of 39 registers and diffusers & a rooftop heat pump unit (29 sq. Ft.) Date: June 20, 2013 Contractor: Hightec Hvac Inc Client: Trustees Of The Universit | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 9, 2014 | Permit id: 476590 | |||||
SCORE 100 Relocation of (131) sprinklers. Date: April 26, 2012 Contractor: Oliver Sprinkler Co Inc Client: Trustees Of The Universit | Permit type: Suppression permit | Permit status: Completed | Completion date: August 17, 2012 | Permit id: 401501 | |||||
Zoning use permit Date: May 1, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 603463 | |||||
Plumbing permit Date: August 13, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 631845 | |||||
Electrical permit Date: August 3, 2015 Client: Trustees Of The Universit | Permit status: Completed | Permit id: 623269 | |||||
Addition permit Date: June 18, 2015 Client: Trustees Of The Universit | Permit status: Expired | Permit id: 610274 | |||||
SCORE 100 Demo supply install lights,switches,conduits and wire per 2008 nec (fraternity building) Date: August 3, 2015 Contractor: Emms Electric Inc Permit type: Electrical permit | Permit status: Completed | Completion date: March 9, 2016 | Permit id: 623269 | |||||
SCORE 99 Reinstall kitchen sink, install 3" vent, install new rain water conductor & trap & cleanout in back of bldg - the installation will compy with the philadephia plubming code 2004 Date: August 13, 2015 Contractor: Golden And Cowden Permit type: Plumbing permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 631845 | |||||
Asbestos abatement required prior to commencement of work partial demolition of the existing structure (shed) and limited interior demolition; construction of three (3) story exit enclosure addition with exterior egress balcony and extension to basement level. Interior alterations at portions of existing building in all levels to accommodate new exit enclosure. Separate permits requried for all mechanical, electrical, plumbing and fire suppression work. All work per plans approved by phialdelphia historical commission - brick to be reviewed and approved by phc special inspectors to be named under separate amended permit; all reports to be furnished to field inspector Date: June 18, 2015 Permit type: Addition permit | Permit status: Expired | Completion date: January 8, 2016 | Permit id: 610274 | |||||
For the removal of existing metal fire escape and demolition of a one(1) story shed ( 184"x97"); for the erection of three(3) story addition of an existing structure ( egress stair tower) ( net increase 5 sf gfa). Size and location as shown in the application. Egress stair tower accessory to existing fraternity building as part of an existing institutional complex. Date: May 1, 2015 Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 1, 2015 | Permit id: 603463 |